Home / Browse projects / Pune, Maharashtra / PCMC EWS KIWALE
PCMC EWS KIWALE
By Pimpri Chinchwad Municipal Corporation
RG-MH-74884 · RERA PR1260002600555 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Allotment letter deviates from the model form
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PCMC EWS KIWALE is a Residential / Group Housing project by Pimpri Chinchwad Municipal Corporation in Pune, Maharashtra, registered with MahaRERA as PR1260002600555 on 27 May 2026. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 0 of the 755 units on this registration are recorded sold or booked, and 41 of 44 construction stages are filed complete.
At a glance
Project
- NamePCMC EWS KIWALE
- TypeResidential / Group Housing
- Location
- Survey No. -73/1/1/2/1
- 73/1/1/2/3
- Kiwale
- Haveli
- Pune - 412101
- Kiwale
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1260002600555
- ReraGenie IDRG-MH-74884
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 May 2026
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings4 building records
- Documents filed10 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-Building | NA | 17 | 16 | 169 | 0 | 169 |
| B-Building | NA | 16 | 15 | 191 | 0 | 191 |
| C-Building | NA | 16 | 15 | 191 | 0 | 191 |
| D-Building | NA | 17 | 16 | 204 | 0 | 204 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
41 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.
A-Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B-Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
C-Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
D-Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 80% |
| Storm Water Drains | No | 100% |
| Landscaping & Tree Planting | No | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 100% |
| Solid Waste Management And Disposal | No | 100% |
| Water conservation /Rain water harvesting | No | 100% |
| Energy managemcnt | No | 100% |
| Fire protection and fire safety requirements | No | 90% |
| Electrical meter room, sub-station, receiving station | No | 100% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
Parking filed798
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Total |
|---|---|---|
| A-Building | 179 | 179 |
| B-Building | 201 | 201 |
| C-Building | 201 | 201 |
| D-Building | 217 | 217 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D-Building | NA | Rs 17.22 cr | Rs 16.70 cr |
| - | NA | Rs 17.04 cr | Rs 16.53 cr |
| B-Building | NA | Rs 16.88 cr | Rs 16.54 cr |
| A-Building | NA | Rs 16.13 cr | Rs 15.81 cr |
| C-Building | NA | Rs 15.96 cr | Rs 15.48 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dream Space |
| Engineer | Sandeep Jotiram Farakate |
| Chartered Accountant | Akshay Oswal |
| Partner | Role in project |
|---|---|
| Pimpri Chinchwad Municipal Corporation | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 May 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed10
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: 1 Layout.pdf | 11 May 2026 |
| Building plan approvalFile: 2 Parking.pdf | 11 May 2026 |
| Building plan approvalFile: 3 A Bldg 1st To 16 th Floor.pdf | 11 May 2026 |
| Building plan approvalFile: 4 ABCD Tarrece Plan.pdf | 11 May 2026 |
| Building plan approvalFile: 5 A Bldg Sanction and Elevation.pdf | 11 May 2026 |
| Building plan approvalFile: 6 B and C Bldg 1st To 15 th Floor.pdf | 11 May 2026 |
| Building plan approvalFile: 7 B and C Bldg - Sanction and Elevation.pdf | 11 May 2026 |
| Building plan approvalFile: 8 D Bldg 1st To 16 th Floor.pdf | 11 May 2026 |
| Building plan approvalFile: 9 D Bldg Sanction and Elevation.pdf | 11 May 2026 |
| Declaration and undertaking (Annexure A)File: Annexure A.pdf | 11 May 2026 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pradhan Mantri Awas Yojana-DudulgaonP52100052195 | Dudulgaon, Pune | Jul 2023 | Ongoing | Jun 2027Registered original: Nov 2025 | Not due yet |
| PRADHAN MANTRI AWAS YOJANA- CHARHOLIP52100017367 | Charholi, Pune | Aug 2018 | Completed | Dec 2023Registered original: Dec 2022 | Dec 2023 |
| EWS- AkurdiP52100026117 | Mohan Nagar, Pune | Aug 2020 | Completed | Dec 2023 | Dec 2023 |
| Pradhan Mantri Awas Yojana-Pimpri R. No 77P52100020603 | Pimpri, Pune | Apr 2019 | Completed | Nov 2023Registered original: Jun 2023 | Late, Dec 2023 |
| Pradhan Mantri Awas Yojana- BorahdewadiP52100020929 | Borahdewadi, Pune | May 2019 | Completed | Aug 2023 | Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 10 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PCMC EWS KIWALE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kiwale13,700+ in Pune
Filed coordinates, straight-line distance. 188 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Presidential Towers
CERATEC CONSTRUCTION
Builder: Pimpri Chinchwad Municipal Corporation
PIMPRI CHINCHWAD MUNICIPAL CORPORATION has 7 registrations on MahaRERA, including PRADHAN MANTRI AWAS YOJANA- CHARHOLI and Pradhan Mantri Awas Yojana-Pimpri R. No 77. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that PCMC EWS KIWALE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PCMC EWS KIWALE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PCMC EWS KIWALE?
The registered promoter entity is Pimpri Chinchwad Municipal Corporation, a public authority as per the filing. Its LLPIN AAN-2373 and GSTIN 27AAALM0464E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PCMC EWS KIWALE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PCMC EWS KIWALE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PCMC EWS KIWALE?
The professionals named in the filing: Architect: Dream Space; Engineer: Sandeep Jotiram Farakate; Chartered Accountant: Akshay Oswal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PCMC EWS KIWALE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback