Home / Browse projects / Pune, Maharashtra / VTP SIERRA PHASE 3

Registered Litigation declared Residential / Group Housing project

VTP SIERRA PHASE 3

By PRASANNA DEVELOPERS

RG-MH-07440 · RERA P52100076811 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 262.00 crore secured on the land, in favour of Capri Global Capital Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Podiums (if any), 80%
25 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

VTP SIERRA PHASE 3 is a Residential / Group Housing project by PRASANNA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100076811 on 28 Jun 2024. Possession is promised by 30 Jun 2028. 127 of the 152 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameVTP SIERRA PHASE 3
  • TypeResidential / Group Housing
  • Location
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100076811
  • ReraGenie IDRG-MH-07440

Builder

  • NamePRASANNA DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFM0462A1ZM
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHarish Raoji Patil, Rohan Harish Patil, Bhushan Vilaskumar Palresha
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2024First promiseJun 2029Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Jun 2029)
  • Buildings1 building record
  • Documents filed103 files

Current status

84%127 of 152 units booked
91.3%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 5NA31261520152

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 80%.

TOWER 5: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks16%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.13%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes44%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Closed/Covered80
Open Space160

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area801 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Capital Limited
Secured amountRs 262.00 crore
CERSAI search filedYes
Declared on24 Mar 2026
LandownerVillageDistrict
Prasanna DevelopersBanerPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune (PMRDA)
Permissible FSI17103.43
Proposed, not sanctioned15,103 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSakore Nagar, Viman Nagar, Pune 411014
Estimated costRs 62.34 cr
Cost incurredRs 56.94 cr
Work done91.34%
BuildingWingEstimatedIncurred
TOWER 5NARs 50.36 crRs 49.01 cr
-NARs 11.97 crRs 7.92 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK design & projects Pvt. Ltd.
EngineerVINAYAK BOGA
EngineerStrudcom Consultants Private Limited.
Chartered AccountantKVMDS & ASSOCIATES
Chartered AccountantSPAK & CO.
Chartered AccountantGMKS & CO.
PartnerRole in project
PRASANNA DEVELOPERS-

Litigation declared2

CaseCourtStatus
214/2023CJSD, PuneOngoing
45/2023DDR, PuneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: VTP SIERRA PHASE 3.pdf18 Jun 2026
Withdrawal Update Form 1File: FORM-1 SIERRA PHASE 3.pdf20 Apr 2026
Withdrawal Update Form 2File: VTP SIERRA_RERA FORM-2 SIERRA PHASE 3.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM-3 SIERRA PHASE 3.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM-1 SIERRA PHASE 3 31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 SIERRA PHASE 3.pdf20 Jan 2026
Withdrawal Update Form 3File: form 3 phase 3_11zon.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 SIERRA PHASE 3.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 Sierra pHase 3 30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 SIERRA PHASE 3_compressed.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 SIERRA PHASE 3.pdf22 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A SIEERA PHASE 3.pdf24 Jun 2025
Form 1File: Form 1 Sierra Phase 3.pdf22 May 2025
Form 2File: Form 2 Sierra Phase 3.pdf22 May 2025
Form 3File: From 3 Sierra Phase 3.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: SIERRA PH3 31032025.pdf22 May 2025
Form 1File: FORM 1 SIERRA PH 3 30062024.pdf7 May 2025
Form 3File: FORM 3 SIERRA PH 3 30062024.pdf7 May 2025
Form 1File: FORM 1 SIERRA PH 3 30062024.pdf7 May 2025
Form 2File: FORM 3 SIERRA PH 3 30062024.pdf7 May 2025
Form 3File: FORM 1 SIERRA PHASE 3 30092024.pdf7 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 2 SIERRA PHASE 3 10102024.pdf7 May 2025
Form 1File: FORM 1 SIERRA PH 3 30062024.pdf7 May 2025
Form 2File: FORM 1 SIERRA PHASE 3 30092024.pdf7 May 2025
Form 3File: FORM 2 SIERRA PHASE 3 10102024.pdf7 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 3 SIERRA PH 3 30062024.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sierra Phase 3.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Sierra Phase 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sierra Phase 3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SIERRA PH3 31032025.pdf7 Apr 2025
Declaration in FORM BFile: Revised Form B.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIERRA PHASE 3 31122024.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIERRA PHASE 3 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIERRA PHASE 3 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SIERRA PHASE 3 31212024.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIERRA PHASE 3 30092024.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM- 3 Sierra Phase 3.pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIERRA PHASE 3 10102024.pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIERRA PHASE 3 10102024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: SIERRA PH3.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIERRA PH 3 30062024.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sierra Phase 3 _Form 3_Jun24_compressed.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: SIERRA PHASE 3 30062024.pdf19 Jul 2024
Copy of the legal title reportFile: TSR_45_1_240624.pdf24 Jun 2024
Proforma of Allotment letterFile: AL-revised.pdf11 Jun 2024
Proforma of Agreement for saleFile: AFS_VTP Sierra Phase 3 - 11062024.pdf11 Jun 2024
Deviation Report with respect to model copy of AgreementFile: AFS DEVIATION_11062024.pdf11 Jun 2024
Other - LegalFile: 1963-2015_DA_SHARAD SASAAR.pdf11 Jun 2024
Other - LegalFile: 2507-2013_DA_BALU SASAAR_compressed-1-25.pdf11 Jun 2024
Other - LegalFile: 2507-2013_DA_BALU SASAAR_compressed-26-49.pdf11 Jun 2024
Other - LegalFile: Letter-Prasanaa-2-11062024NEW.pdf11 Jun 2024
Other - LegalFile: 7-12 extracts.pdf6 Jun 2024
Other - LegalFile: 1370-2011_SD.pdf5 Jun 2024
Other - LegalFile: 3883-2013_17 R SKYLARK PROMOTERS SALE DEED.pdf5 Jun 2024
Other - LegalFile: 10725-2015_Sale Deed_compressed.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIERRA PHASE 3 _ REVISED.pdf31 May 2024
Other - LegalFile: 2819-2021_SD - Part 1 of 4.pdf31 May 2024
Other - LegalFile: 2819-2021_SD - Part 2 of 4.pdf31 May 2024
Other - LegalFile: 2819-2021_SD - Part 3 of 4.pdf31 May 2024
Other - LegalFile: 2819-2021_SD - Part 4 of 4.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 1 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 2 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 3 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 4 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 5 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 6 of 7.pdf31 May 2024
Other - LegalFile: 6961-2008_14666 ARE SALMAN MOLUBHOY TO PRASANNA SALE DEED - Part 7 of 7.pdf31 May 2024
Other - LegalFile: 8199-2008_ SALE DEED - Part 1 of 3.pdf31 May 2024
Other - LegalFile: 8199-2008_ SALE DEED - Part 2 of 3.pdf31 May 2024
Other - LegalFile: 8199-2008_ SALE DEED - Part 3 of 3.pdf31 May 2024
Other - LegalFile: 16180-2021_SD_NANA SASAR - Part 1 of 2.pdf31 May 2024
Other - LegalFile: 16180-2021_SD_NANA SASAR - Part 2 of 2.pdf31 May 2024
Other - LegalFile: सुस_10773__फेरफार.pdf31 May 2024
Other - LegalFile: सुस_11401__फेरफार.pdf31 May 2024
Other - LegalFile: Prasanna Developers - Partnership Declaration (1).pdf31 May 2024
Other - LegalFile: SuppPartnership Deed - Prasanna Developers - dt28-08-2021_compressed.pdf31 May 2024
Layout approvalFile: SIERRA TOWER 5.pdf25 May 2024
Building plan approvalFile: 28-54.pdf25 May 2024
Building plan approvalFile: 29-54.pdf25 May 2024
Building plan approvalFile: SIERRA TOWER 5 GROUND COVERAGE.pdf25 May 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VTP VerveP52100031556Sus, Pune701Oct 2021OngoingDec 2029Registered original: Jun 2026Not due yet
VTP SIERRA PHASE-2P52100029394Sus, Pune361May 2021OngoingDec 2026Registered original: Dec 2025Not due yet
VTP Sierra Phase1P52100028378Sus, Pune515Feb 2021OngoingJun 2026Not delivered

How this compares with Pune

84%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP SIERRA PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus13,700+ in Pune

Builder: PRASANNA DEVELOPERS

PRASANNA DEVELOPERS has 7 registrations on MahaRERA, including PRASANNA I SQUARE and PRASANNA TULSHIBAUG. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP SIERRA PHASE 3 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP SIERRA PHASE 3?

The registered promoter entity is PRASANNA DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFM0462A1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP SIERRA PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VTP SIERRA PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP SIERRA PHASE 3?

The professionals named in the filing: Architect: VK design & projects Pvt. Ltd.; Engineer: VINAYAK BOGA; Engineer: Strudcom Consultants Private Limited.; Chartered Accountant: KVMDS & ASSOCIATES; Chartered Accountant: SPAK & CO.; Chartered Accountant: GMKS & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP SIERRA PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP SIERRA PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP SIERRA PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.