Home / Browse projects / Pune, Maharashtra / VTP Verve

Registered No litigation declared Residential / Group Housing project

VTP Verve

By PRASANNA DEVELOPERS

RG-MH-22546 · RERA P52100031556 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken
  • Rs 200.00 crore secured on the land, in favour of PIRAMAL ENTERPRISES LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 42 months from the original
4 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 97%
57 of 701Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

VTP Verve is a Residential / Group Housing project by PRASANNA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100031556 on 28 Oct 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 42 months from the original filing. 644 of the 701 units on this registration are recorded sold or booked, and 4 of 66 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameVTP Verve
  • TypeResidential / Group Housing
  • Location
    • Sus Baner
    • Sus
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100031556
  • ReraGenie IDRG-MH-22546

Builder

  • NamePRASANNA DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFM0462A1ZM
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHarish Raoji Patil, Rohan Harish Patil, Bhushan Vilaskumar Palresha
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2021First promiseJun 2026Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Oct 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Jun 2026)
  • Buildings6 building records
  • Documents filed130 files

Current status

92%644 of 701 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA41808
Tower 2NA35301150115
Tower 3NA35301750175
Tower 4NA35301130113
Tower 5NA35301750175
Tower 6NA35301150115

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 97%.

Tower 18%
ActivityProgress
Excavation88%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 39%
ActivityProgress
Excavation97%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 435%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor70%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 537%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor70%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 637%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth70%
Stilt Floor70%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25
BuildingClosed/CoveredTotal
Tower 12020
Tower 211
Tower 311
Tower 411
Tower 511
Tower 611

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,394 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPIRAMAL ENTERPRISES LIMITED
Secured amountRs 200.00 crore
Declared on6 Jul 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune (PMRDA)
Permissible FSI81803.1
Proposed, not sanctioned77,920 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAKORE NAGAR, PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK design & projects Pvt. Ltd.
EngineerVINAYAK BOGA
Chartered AccountantSPAK & CO.
PartnerRole in project
PRASANNA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028040Jun 2026 → Dec 2029

Reason as filed by the promoterAs per Order No. 40 Dated 27/12/2022 we are applying for Extension without majority consents of the allottees.As per HEARING DATED 5th May 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2029. The order is uploaded in Other Tab for your reference

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12501447PRASANNA DEVELOPERSShrikant Ulhas Medpilwar (Allottee)29/04/2025
CC12600691Omkar Govind DheknePRASANNA DEVELOPERS06/02/2026
CC12601747Renuka Gajendra BhaisePRASANNA DEVELOPERS26/03/2026
CC12601918Swapnil Uttam ThakurPRASANNA DEVELOPERS01/04/2026
CC12603726Anuj Brijgopal LoyaPRASANNA DEVELOPERS17/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: VTP VERVE.pdf18 Jun 2026
Form 1File: FORM-1 VERVE.pdf20 Apr 2026
Form 2File: FORM-2 VERVE.pdf20 Apr 2026
Form 3File: FORM 3 VERVE.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: INV VERVE 31032026.pdf20 Apr 2026
Form 1File: FORM-1 VERVE 31122025.pdf20 Jan 2026
Form 2File: FORM-2 Verve.pdf20 Jan 2026
Form 3File: FORM 3 Verve_11zon.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: VERVE inv.pdf20 Jan 2026
Form 1File: FORM 1 VTP VERVE.pdf17 Oct 2025
Form 2File: FORM 2 Verve old 30092025.pdf17 Oct 2025
Form 3File: FORM 3 VERVE_compressed_11zon.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: VERVE INV.pdf17 Oct 2025
Other - TechnicalFile: FORM 2A VERVE.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: VERVE 31032025.pdf22 May 2025
Form 1File: Form 1 Verve 31032025.pdf22 May 2025
Form 2File: Form 2 Verve.pdf22 May 2025
Form 3File: Form 3 Verve.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Verve 31032025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Verve.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Verve.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: VERVE 31032025.pdf7 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letter -VTP Sierra Ph 2.pdf17 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letter VTP Verve.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-2021-2022_VTP VERVE.pdf5 Mar 2025
PAN CardFile: 1 PAN Card.pdf4 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-2021-2022_VTP VERVE.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIERRA PHASE 1 31122024.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VERVE 31122024.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 20012025.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VTP VERVE 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: VERVE 31122024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VTP VERVE_11zon.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20241028015408.pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A VERVE.pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: ANNEXURE A DECLARATION CUM UNDERTAKING VTP VERVE.pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION VERVE_rotated (1).pdf26 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A- verve.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE10102024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VERVE 30092024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: VERVE 30092024.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - VERVE.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VTP VERVE 30062024.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VERVE 30062024.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIERRA PH 1VERVE 10072024.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: VERVE-30062024.pdf6 Jul 2024
Layout approvalFile: verve_Layout_highlighted_compressed.pdf5 Jul 2024
Building plan approvalFile: 40_54_Verve_Tower_1.pdf5 Jul 2024
Building plan approvalFile: 42_54_Verve_Tower_2.pdf5 Jul 2024
Building plan approvalFile: 44_54_Verve_T3.pdf5 Jul 2024
Building plan approvalFile: 46_54_Verve_T4.pdf5 Jul 2024
Building plan approvalFile: 48_54_Verve_T5.pdf5 Jul 2024
Building plan approvalFile: 50_54_Verve_T6.pdf5 Jul 2024
Copy of Layout Approval (in case of layout)File: verve_Layout_highlighted_compressed.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 40_54_Verve_Tower_1.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 42_54_Verve_Tower_2.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 44_54_Verve_T3.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 46_54_Verve_T4.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 48_54_Verve_T5.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 50_54_Verve_T6.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_.pdf5 Jul 2024
Declaration about Commencement CertificateFile: Declaration_CC_Verve_.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VERVE 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VERVE 31032024.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 31032024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 31032024.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VERVE 31032024.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 31032022.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 30062022.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 31032022.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 30062022.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 30092022.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 30092022.pdf22 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VERVE 31122023.pdf8 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 31122023.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VERVE 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VERVE 30092023.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: INVENTORY VERVE 30092023.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VERVE 30092023.pdf20 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VTP SIERRA PHASE 3P52100076811Sus, Pune152Jun 2024OngoingJun 2028Not due yet
VTP SIERRA PHASE-2P52100029394Sus, Pune361May 2021OngoingDec 2026Registered original: Dec 2025Not due yet
VTP Sierra Phase1P52100028378Sus, Pune515Feb 2021OngoingJun 2026Not delivered

How this compares with Pune

92%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP Verve on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus13,700+ in Pune

Builder: PRASANNA DEVELOPERS

PRASANNA DEVELOPERS has 7 registrations on MahaRERA, including PRASANNA I SQUARE and PRASANNA TULSHIBAUG. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP Verve is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP Verve?

The registered promoter entity is PRASANNA DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFM0462A1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP Verve?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP Verve?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP Verve?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP Verve?

The professionals named in the filing: Architect: VK design & projects Pvt. Ltd.; Engineer: VINAYAK BOGA; Chartered Accountant: SPAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP Verve?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP Verve. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP Verve to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.