Home / Browse projects / Pune, Maharashtra / Swapnalok Township Amenity Building

Registered Litigation declared Others project

Swapnalok Township Amenity Building

By SWAPNALOK DEVELOPERS

RG-MH-11643 · RERA P52100004288 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 120 months
  • 4 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 120 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 28%
20 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 170 documents Report an error

Swapnalok Township Amenity Building is a Others project by SWAPNALOK DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100004288 on 9 Aug 2017. Possession is promised by 31 Mar 2029. The completion date has moved by 120 months from the original filing. 26 of the 46 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSwapnalok Township Amenity Building
  • TypeOthers
  • Location
    • NH 65
    • NASARAPUR
    • Nasrapur
    • Bhor
    • Pune
    • 412213
  • Pincode412213
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004288
  • ReraGenie IDRG-MH-11643

Builder

  • NameSWAPNALOK DEVELOPERS
  • Entity typeOthers
  • PartnersMANISH PRAMODRAI SOLANKI, PRAMODRAI RAGHAVJI SOLANKI, MUKUND KRISHNALAL PARMAR, BHASKAR RAMANASUNDARAM, GARVA DEVELOPERS PRIVATE LIMITED
  • Named personsPankaj Parmar, Manish Solanki, Bhaskar Ramanasundaram, Pramodrai R Solanki, RGBS INFRASTRUCTURE LLP, ABHISHEK MUKUND PARMAR
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed170 files

Current status

57%26 of 46 units booked
53.7%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMENITY BUILDINGNA6304646

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 28%.

AMENITY BUILDING: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered126
Open Space40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,919 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI2914.12
Proposed, not sanctioned2,914 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBramha Majestic, Nibm Road, Kondhwa, Pune 411048
Estimated costRs 5.92 cr
Cost incurredRs 3.18 cr
Work done53.71%
BuildingWingEstimatedIncurred
AMENITY BUILDINGNARs 5.42 crRs 2.85 cr
-NARs 49.96 lakhRs 32.83 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Hardikar
EngineerVilas Purandare
EngineerSNEHAL SABLE
EngineerAbhijeet Shyamrao Fargade
Chartered AccountantVijaykumar S Fathepur
Chartered AccountantCA Anup Kelkar
PartnerRole in project
SWAPNALOK DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006336Mar 2019 → Dec 2020

Reason as filed by the promoterTo, MAHARERA, Sir/Mam, We are constructing a Hospital building on the Amenity Space of our project known as Swapnalok Township, which is situated at Village Nasrapur, which is about 35 Km from Pune city. We started the construction of this building in 2012. The RCC work, external walls and external plastering works is complete. We have spent a huge amount of money to construct this building out of our own pocket. All the internal works are not done because it can be constructed as per plans and specification of the buyer. We have been trying to sell this Hospital building for the past eight ye

EXT52100001746Mar 2019 → Mar 2020

Reason as filed by the promoterThere is no sales during the period of registration, hence we need to extend timeline for next one year. we are trying to sell said amenity building but no one has shown interest as on date. we have completed RCC and External walls only for the said project. the balance work will be carried out as per the requirements of the purchaser,

EXT52100010683Mar 2019 → Dec 2025

Reason as filed by the promoterSir/Mam, We are constructing a Hospital building on the Amenity Space of our project known as Swapnalok Township, which is situated at Village Nasrapur, which is about 35 Km for Pune city. We started the construction of this building in 2012. The RCC work, external walls and external plastering works is complete. We have spent a huge amount of money to construct this building out of our own pocket. All the internal works are not done because it can be constructed as per plans and specification of the buyer. We reserved shops for the hospital us. and medical use. some of stock kept unsold which

EA26062621555Mar 2019 → Mar 2029

Reason as filed by the promoterSir/Mam, We are constructing a hospital building on the Amenity Space of our project known as Swapnalok Township, which is situated at Village Nasrapur, which is about 35 Km for Pune city. We started the construction of this building in 2012. The RCC work, external walls and external plastering works is complete. We have spent a huge amount of money to construct this building out of our own pocket. All the internal works are not done because it can be constructed as per plans and specification of the buyer. We have taken part completion for the project from competent authority name “Pune Metro

Litigation declared2

CaseCourtStatus
1685/2015/2015Civil Court Senior Division PuneIssues
975/2016/2016Civil Court Senior Division PuneAwaiting summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2022

Documents filed170

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 170 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - June 2026.pdf10 Jul 2026
Withdrawal Update Form 1File: Form 1 - June 2026.pdf10 Jul 2026
Withdrawal Update Form 2File: Form 2 - June 2026.pdf10 Jul 2026
Withdrawal Update Form 2File: Form 2 - June 2026.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM 3 - MARCH 2026.pdf10 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf10 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A - Rera FY - 2025-26.pdf6 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 - CA - 31 March 2026.pdf3 Jul 2026
Withdrawal Update Form 1File: FORM 1 - MARCH 2026.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2 - MARCH 2026.pdf8 Apr 2026
Withdrawal Update Form 3File: FORM 3 - MARCH 2026.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Certificate Nasa Amenity Bld Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 ENG CERTI Nasa Amenity Bld Dec 25.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Nasa Amenity Bld DEC 2025.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Swapnalok Developers - 31-03-2025.pdf15 Oct 2025
Withdrawal Update Form 1File: Form - 1 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Form - 1 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Form - 1 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form - 3 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form - 3 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form - 3 - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Form1 - June 2025.pdf16 Jul 2025
Withdrawal Update Form 1File: Form1 - June 2025.pdf16 Jul 2025
Withdrawal Update Form 2File: rera Form - 2 - June 25.pdf16 Jul 2025
Withdrawal Update Form 2File: rera Form - 2 - June 25.pdf16 Jul 2025
Withdrawal Update Form 3File: Form3 - June 2025.pdf16 Jul 2025
Withdrawal Update Form 3File: Form3 - June 2025.pdf16 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (New)- DEC 2024.pdf12 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- March 2025.pdf12 Apr 2025
Certificates of CA (Form 3)File: Form 3 (New) - DEC 2024.pdf12 Apr 2025
Certificates of CA (Form 3)File: Form 3- March 2025.pdf12 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2(New) -DEC 2024.pdf12 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- March 2025.pdf12 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1(New) -DEC 2024.pdf15 Jan 2025
Certificates of CA (Form 3)File: Form 3 (New)- DEC 2024.pdf15 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (New) - DEC 2024.pdf15 Jan 2025
Certificates of CA (Form 5)File: Form 5 - 2024- Nasarapur Amenity Building, Pune.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Update Sept 2024.pdf15 Oct 2024
Certificates of CA (Form 3)File: Form 3- Update Sept 2024.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Update Sept 2024.pdf15 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect- June 24.pdf18 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineers - June 24.pdf18 Jul 2024
Certificates of CA (Form 3)File: Form 3- CA - June 24.pdf18 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect.pdf4 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - March 24.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Rera.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A - march 24.pdf4 May 2024
Certificates of CA (Form 3)File: Form 3 - CA.pdf4 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Scan-Format A - AMENITY BUILDING NASARAPUR.pdf7 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Arc certificate -amenity bld dec 23.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- Eng certificate - amenity bld - dce 23.pdf19 Jan 2024
Certificates of CA (Form 3)File: FORM 3 - CA certificate - amenity bld -dec 23.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Amenity Building - FY - 2022-23.pdf4 Nov 2023
Certificates of CA (Form 3)File: Form 3- Rera -MARCH 23.pdf25 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (New) - Archetect CERTI -Nasa Amenity Bld - Sept 23.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (New) - ENG CERTI -Nasa Amenity Bld - Sept 23.pdf13 Oct 2023
Certificates of CA (Form 3)File: Form 3 (New) - CA CERTI -Nasa Amenity Bld - Sept 23.pdf13 Oct 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate June 2023.pdf14 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate June 2023.pdf14 Jul 2023
Certificates of CA (Form 3)File: CA Certificate June 2023.pdf14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Rera.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Rera-Scan.pdf2 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Swapnalok Township Amenity Building - Dec 2022.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 - Nasa Amenity bld Dec 22-.pdf23 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A - Nasa Amenity bld Dec 22-.pdf23 Jan 2023
Certificates of CA (Form 3)File: Form 3 - Swapnalok Township Amenity Building - Dec 2022.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 31-03-22 - AMENITY BLD.pdf9 Jan 2023
Certificates of CA (Form 3)File: FORM3 - MARCH 2022 - NASA AMENITY BLD.pdf2 Jan 2023
Certificates of CA (Form 3)File: Form 3 - Comm bld - Nasa - Sept 22_compressed.pdf2 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Comm bld - Nasa - Sept 22.pdf27 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Comm bld - Nasa - Sept 22.pdf27 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Comm bld - Nasa - Sept 22.pdf27 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -SCAN- AMENITY BLD JUNE 22.pdf5 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 -SCAN- AMENITY BLD JUNE 22.pdf5 Jul 2022
Certificates of CA (Form 3)File: FORM 3 -SCAN - AMENITY BLD- JUNE 22-.pdf5 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Archetect certificte march 22.pdf7 Jun 2022

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SWAPNALOK NAGARI, BHOR, BUILDING NO. 4P52100033872Swapnalok Nagari, Pune-Mar 2022CompletedDec 2027Jun 2023
SWAPNALOK DEVELOPERS, SWAPNALOK NAGARI BHOR,- PLOTS -PHASE 2P52100052233Swapnalok Nagari, Pune46Jul 2023CompletedDec 2024Jan 2024
Swapnalok Nagari, Building No -3P52100017102Swapnalok Nagari, Pune-Jul 2018CompletedJun 2024Nov 2021
Swapnalok Nagari Commercial BuildingP52100017103Swapnalok Nagari, Pune-Jul 2018CompletedJun 2024Nov 2021
SWAPNALOK NAGARI PLOTSP52100018545Swapnalok Nagari, Pune19Nov 2018CompletedMar 2019Late, May 2021
Swapnalok Nagari Building no. 34,35,36,37P52100001827SWAPNALOK NAGARI, Pune-Jul 2017CompletedDec 2018Oct 2018
Swapnalok Nagri Building no 38 to 56S No 5-3 5-4 37-6 Swapnalok Nagri Taluka Bhor District Pune228-CompletedApr 2017Apr 2017

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 120 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swapnalok Township Amenity Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASARAPUR13,700+ in Pune

2 kmSwapnalok Township AmeniCompleted 1Lapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SWAPNALOK DEVELOPERS

SWAPNALOK DEVELOPERS has 7 registrations on MahaRERA, including Swapnalok Nagari Building no. 34,35,36,37 and Swapnalok Township Amenity Building. Its filings disclose 8 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Swapnalok Township Amenity Building is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swapnalok Township Amenity Building?

The registered promoter entity is SWAPNALOK DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swapnalok Township Amenity Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swapnalok Township Amenity Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swapnalok Township Amenity Building?

The professionals named in the filing: Architect: Sandeep Hardikar; Engineer: Vilas Purandare; Engineer: SNEHAL SABLE; Engineer: Abhijeet Shyamrao Fargade; Chartered Accountant: Vijaykumar S Fathepur; Chartered Accountant: CA Anup Kelkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swapnalok Township Amenity Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swapnalok Township Amenity Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swapnalok Township Amenity Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.