Home / Browse projects / Mumbai City, Maharashtra / South Tower
South Tower
RG-MH-55433 · RERA P51900015854 · Last updated on MahaRERA portal: 24 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 12 complaints at MahaRERA
- Rs 1,000.00 crore secured on the land, in favour of yes bank
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
South Tower is a Residential / Group Housing project by Glider Buildcon Realtors in Mumbai City, Maharashtra, registered with MahaRERA as P51900015854 on 28 Mar 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 307 of the 376 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 12 complaints are on record with the regulator.
At a glance
Project
- NameSouth Tower
- TypeResidential / Group Housing
- Location
- G.B. Satkal Marg and Kamlakant Singh Marg Dhobighat
- Saatrasta
- Mumbai - 400 011
- Saatraasta
- Mumbai City
- 400011
- Pincode400011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900015854
- ReraGenie IDRG-MH-55433
Builder
- NameGlider Buildcon Realtors
- Entity typeCompany
- CINU70200MH2015PTC265844
- GSTIN27AAGCG0288B1ZU
- DirectorPankaj S Mundada
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Mar 2018
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed250 files
Current status
Figures as on 24 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| South Tower - Tower 1 | NA | 60 | 49 | 376 | 0 | 376 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
South Tower - Tower 1: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed571
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Gliders Buildon Realtors Pvt ltd | Mumbai City | Mumbai City |
| Omkar realtors projects private limited | Kurla | Mumbai Suburban |
| Padmalaya Realty LLP | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| South Tower - Tower 1 | NA | Rs 642.45 cr | Rs 516.24 cr |
| - | NA | Rs 74.42 cr | Rs 52.15 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anand Vishnu Dhokay |
| Engineer | WTP Cost Advisory Services India Pvt. Ltd |
| Engineer | Kishor Parmar |
| Chartered Accountant | SRBC & CO LLP |
| Chartered Accountant | D B Ketkar & Co |
| Partner | Role in project |
|---|---|
| Glider Buildcon Realtors Private Ltd | - |
Litigation declared30
| Case | Court | Status |
|---|---|---|
| 1234/2015 | Consumer Disputes Redressal Commission | Disposed off |
| 855/2016 | Bombay City Civil Court | Pending for hearing |
| 1775/2016 | Bombay City Civil Court | ONGOING |
| 1423/2015 | Bombay City Civil Court | Pending for hearing |
| 2255/2016 | Bombay City Civil Court | Pending for hearing |
| 2582/2015 | Bombay City Civil Court | Dismissed in Default |
| 645/2017 | Bombay City Civil Court | Disposed off |
| 1423/2017 | Bombay City Civil Court | Duplicate Entry to be ignored |
| 2146/2016 | Bombay City Civil Court | for issues |
| 1434/2017 | Bombay City Civil Court | Pending for hearing |
| 199/2018 | Bombay City Civil Court | Notice of Motion Reply Rejoinder |
| 2147/2015 | Bombay City Civil Court | For writ of summons |
| 1207/2016 | Bombay City Civil Court | Notice of Motion for Hearing |
| 105749/2007 | Bombay City Civil Court | For Order on Chamber Summons |
| 7887/2018 | High Court of Judicature at Bombay | For Order |
| 312/2017 | Before Grievance Redressal Committee SRA Bandra Mumbai | For Hearing |
| 368/2018 | Before Additional Collector Mumbai City | For Hearing |
| 1817/2018 | High Court of Judicature at Bombay | For Admission |
| 680/2017 | Bombay City Civil Court | For Hearing |
| 3610/2019 | High Court of Judicature at Bombay | For Hearing |
| 35886/2018 | High Court of Judicature at Bombay | For Admission |
| 30608/2018 | High Court of Judicature at Bombay | Disposed off |
| 30699/2018 | High Court of Judicature at Bombay | Pre admission |
| 30685/2018 | High Court of Judicature at Bombay | ONGOING |
| 54/2018 | Bombay City Civil Court | For Hearing |
| 147/2016 | Bombay City Civil Court | for Hearing |
| 2347/2019 | Bombay City Civil Court | Pending for Hearing |
| 9681/2019 | Bombay City Civil Court | Disposed off |
| 2637/2019 | Bombay City Civil Court | Pending for Hearing |
| 1247/2019 | High Court of Judicature at Bombay | PreAdmission |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193972 | Mudhit Gupta | Glider Buildcon Realtors Private Limited | 14/09/2020 |
| CC006000000079278 | AFTAB S SHAIKH | GLIDER BUILDCON REALTORS PRIVATE LIMITED | 13/05/2019 |
| CC006000000193400 | Vikram B. Sanghani | Glider Buildcon Developers Pvt. Ltd | 10/07/2020 |
| CC006000000193662 | Mr. Raghvendra Singhania and Mrs. Shilpa Singhania | Glider Buildcon Realtors Private Limited | 13/08/2020 |
| CC006000000193814 | Neelam R Shirkar | Glider Buildcon Realtors / Piramal Mahalaxmi | 24/08/2020 |
| CC006000000198315 | Sanjeev S Mahajan | M/s. Glider Buildcon Realtors Pvt. Ltd. | 10/09/2021 |
| CC006000000199144 | DEVDAS MELETHIL | GLIDER BUILDCON REALTORS PVT LTD | 24/11/2021 |
| CC006000000209694 | Emran Husamuddin Kapasi | Glider Buildcon Realtors Pvt. Ltd. | 02/02/2022 |
| CC006000000395507 | Juhi Godambe | Glider Buildcon Realtors Pvt Ltd Co | 03/05/2023 |
| CC006000000396643 | Ranu Roy | Messers Glider Buildcon Realtors Private Limited | 09/07/2023 |
| CC006000000397504 | Santosh M Gawade | Glider Buildcon Realtors Pvt | 17/09/2023 |
| CC12602821 | Nimesh Shashikant Mehta | Glider Buildcon Realtors Private Ltd | 14/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Jan 2025
Documents filed250
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 250 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf | 24 Feb 2026 |
| Form 1File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf | 20 Nov 2025 |
| Form 2File: Piramal Mahalaxmi ST Form 2, December'2024.pdf | 20 Nov 2025 |
| Form 3File: Mahalaxmi South Tower.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf | 20 Nov 2025 |
| OthersFile: ST.pdf | 20 Nov 2025 |
| Form 1File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf | 20 Nov 2025 |
| Form 2File: Piramal Mahalaxmi ST Form 2, December'2024.pdf | 20 Nov 2025 |
| Form 3File: Mahalaxmi South Tower.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf | 20 Nov 2025 |
| OthersFile: ST.pdf | 20 Nov 2025 |
| Form 2A (FY 2024-2025)File: South Tower.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Mahalaxmi ST.pdf | 30 Sep 2025 |
| Details of encumbrancesFile: Encumbrances ST_17042025171638.PDF | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf | 20 Jan 2025 |
| OtherFile: ST.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf | 20 Jan 2025 |
| OtherFile: ST.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf | 20 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf | 20 Jan 2025 |
| OtherFile: ST.pdf | 20 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf | 18 Oct 2024 |
| OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf | 17 Oct 2024 |
| OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf | 17 Oct 2024 |
| OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf | 7 Oct 2024 |
| Details of encumbrancesFile: South Tower.pdf | 5 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_8 MAY 2024_Mahalaxumi_compressed.pdf | 5 Aug 2024 |
| Certificates of CA (Form 3)File: M_ST_merged.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalaxmi_ST_Form 2_June 24 .pdf | 19 Jul 2024 |
| Details of encumbrancesFile: Encumbrance Certificate - Piramal Mahalaxmi.pdf | 18 Jul 2024 |
| CERSAI detailsFile: CERSAI_Piramal Mahalaxmi.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Mahalaxmi ST.pdf | 18 Jul 2024 |
| OtherFile: Mahalaxmi_South_FSI_June 24.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalaxmi South.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: South Tower_SoldUnsold.pdf | 4 Jul 2024 |
| OtherFile: Mahalxmi South_FsiC_June 24 .pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ST EC.pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: ST CA.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ST AC.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: ST SOLD UNSOLD.pdf | 16 Apr 2024 |
| OtherFile: ST FSI.pdf | 16 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 250 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep South Tower on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Saatraasta780+ in Mumbai City
Filed coordinates, straight-line distance. 117 registered projects within 2 km.
NATHANI HEIGHTS SALE
Nathani Parekh Constructions Private Limit
North Tower - Tower 3
Glider Buildcon Realtors
MONTESOUTH ZERMATT-1
SWAYAM REALTORS & TRADERS LLP
MINERVA
Lokhandwala Kataria Construction Private L
Lodha Bellevue
Lodha Developers Limited
Seventh Avenue
Rubberwala Housing & Infradevelopment LLP
See every Mumbai City project, with the district possession charts
Builder: Glider Buildcon Realtors
Glider Buildcon Realtors has 3 registrations on MahaRERA, including South Tower and Central Tower - Tower 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that South Tower shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if South Tower is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of South Tower?
The registered promoter entity is Glider Buildcon Realtors, a company as per the filing. Its CIN U70200MH2015PTC265844 and GSTIN 27AAGCG0288B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in South Tower?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against South Tower?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for South Tower?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at South Tower?
The professionals named in the filing: Architect: Anand Vishnu Dhokay; Engineer: WTP Cost Advisory Services India Pvt. Ltd; Engineer: Kishor Parmar; Chartered Accountant: SRBC & CO LLP; Chartered Accountant: D B Ketkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in South Tower?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback