Registration lapsed No litigation declared Residential / Group Housing project

South Tower

By Glider Buildcon Realtors

RG-MH-55433 · RERA P51900015854 · Last updated on MahaRERA portal: 24 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 12 complaints at MahaRERA
  • Rs 1,000.00 crore secured on the land, in favour of yes bank

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
69 of 376Units unsoldnot recorded sold or booked
12Complaints at MahaRERAon this registration
Jump to the 250 documents Report an error

South Tower is a Residential / Group Housing project by Glider Buildcon Realtors in Mumbai City, Maharashtra, registered with MahaRERA as P51900015854 on 28 Mar 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 307 of the 376 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 12 complaints are on record with the regulator.

At a glance

Project

  • NameSouth Tower
  • TypeResidential / Group Housing
  • Location
    • G.B. Satkal Marg and Kamlakant Singh Marg Dhobighat
    • Saatrasta
    • Mumbai - 400 011
    • Saatraasta
    • Mumbai City
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900015854
  • ReraGenie IDRG-MH-55433

Builder

  • NameGlider Buildcon Realtors
  • Entity typeCompany
  • CINU70200MH2015PTC265844
  • GSTIN27AAGCG0288B1ZU
  • DirectorPankaj S Mundada
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMar 2018PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Mar 2018
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed250 files

Current status

82%307 of 376 units booked
79.3%Work done, per cost certificate

Figures as on 24 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
South Tower - Tower 1NA60493760376

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

South Tower - Tower 1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed571

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots571
Closed/Covered571

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area27,697 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofyes bank
Secured amountRs 1,000.00 crore
CERSAI search filedYes
Declared on29 Dec 2025
LandownerVillageDistrict
Gliders Buildon Realtors Pvt ltdMumbai CityMumbai City
Omkar realtors projects private limitedKurlaMumbai Suburban
Padmalaya Realty LLPKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI49350.99
Proposed, not sanctioned49,351 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndiabulls Financial Centre, Lower parel, Mumbai - 400011
Estimated costRs 716.88 cr
Cost incurredRs 568.39 cr
Work done79.29%
BuildingWingEstimatedIncurred
South Tower - Tower 1NARs 642.45 crRs 516.24 cr
-NARs 74.42 crRs 52.15 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnand Vishnu Dhokay
EngineerWTP Cost Advisory Services India Pvt. Ltd
EngineerKishor Parmar
Chartered AccountantSRBC & CO LLP
Chartered AccountantD B Ketkar & Co
PartnerRole in project
Glider Buildcon Realtors Private Ltd-

Litigation declared30

CaseCourtStatus
1234/2015Consumer Disputes Redressal CommissionDisposed off
855/2016Bombay City Civil CourtPending for hearing
1775/2016Bombay City Civil CourtONGOING
1423/2015Bombay City Civil CourtPending for hearing
2255/2016Bombay City Civil CourtPending for hearing
2582/2015Bombay City Civil CourtDismissed in Default
645/2017Bombay City Civil CourtDisposed off
1423/2017Bombay City Civil CourtDuplicate Entry to be ignored
2146/2016Bombay City Civil Courtfor issues
1434/2017Bombay City Civil CourtPending for hearing
199/2018Bombay City Civil CourtNotice of Motion Reply Rejoinder
2147/2015Bombay City Civil CourtFor writ of summons
1207/2016Bombay City Civil CourtNotice of Motion for Hearing
105749/2007Bombay City Civil CourtFor Order on Chamber Summons
7887/2018High Court of Judicature at BombayFor Order
312/2017Before Grievance Redressal Committee SRA Bandra MumbaiFor Hearing
368/2018Before Additional Collector Mumbai CityFor Hearing
1817/2018High Court of Judicature at BombayFor Admission
680/2017Bombay City Civil CourtFor Hearing
3610/2019High Court of Judicature at BombayFor Hearing
35886/2018High Court of Judicature at BombayFor Admission
30608/2018High Court of Judicature at BombayDisposed off
30699/2018High Court of Judicature at BombayPre admission
30685/2018High Court of Judicature at BombayONGOING
54/2018Bombay City Civil CourtFor Hearing
147/2016Bombay City Civil Court for Hearing
2347/2019Bombay City Civil CourtPending for Hearing
9681/2019Bombay City Civil CourtDisposed off
2637/2019Bombay City Civil CourtPending for Hearing
1247/2019High Court of Judicature at BombayPreAdmission

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000193972Mudhit GuptaGlider Buildcon Realtors Private Limited14/09/2020
CC006000000079278AFTAB S SHAIKHGLIDER BUILDCON REALTORS PRIVATE LIMITED13/05/2019
CC006000000193400Vikram B. SanghaniGlider Buildcon Developers Pvt. Ltd10/07/2020
CC006000000193662Mr. Raghvendra Singhania and Mrs. Shilpa SinghaniaGlider Buildcon Realtors Private Limited13/08/2020
CC006000000193814Neelam R ShirkarGlider Buildcon Realtors / Piramal Mahalaxmi24/08/2020
CC006000000198315Sanjeev S MahajanM/s. Glider Buildcon Realtors Pvt. Ltd.10/09/2021
CC006000000199144DEVDAS MELETHILGLIDER BUILDCON REALTORS PVT LTD24/11/2021
CC006000000209694Emran Husamuddin KapasiGlider Buildcon Realtors Pvt. Ltd.02/02/2022
CC006000000395507Juhi GodambeGlider Buildcon Realtors Pvt Ltd Co03/05/2023
CC006000000396643Ranu RoyMessers Glider Buildcon Realtors Private Limited09/07/2023
CC006000000397504Santosh M GawadeGlider Buildcon Realtors Pvt17/09/2023
CC12602821Nimesh Shashikant MehtaGlider Buildcon Realtors Private Ltd14/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2025

Documents filed250

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 250 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf24 Feb 2026
Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf24 Feb 2026
Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf24 Feb 2026
Withdrawal Update Form 1File: Piramal Mahalaxmi T1 ST Form 1 December 2024.pdf24 Feb 2026
Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf24 Feb 2026
Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf24 Feb 2026
Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf24 Feb 2026
Withdrawal Update Form 2File: Piramal Mahalaxmi ST Form 2 December 2024.pdf24 Feb 2026
Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf24 Feb 2026
Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf24 Feb 2026
Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf24 Feb 2026
Withdrawal Update Form 3File: Mahalaxmi South Tower.pdf24 Feb 2026
Form 1File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf20 Nov 2025
Form 2File: Piramal Mahalaxmi ST Form 2, December'2024.pdf20 Nov 2025
Form 3File: Mahalaxmi South Tower.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf20 Nov 2025
OthersFile: ST.pdf20 Nov 2025
Form 1File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf20 Nov 2025
Form 2File: Piramal Mahalaxmi ST Form 2, December'2024.pdf20 Nov 2025
Form 3File: Mahalaxmi South Tower.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf20 Nov 2025
OthersFile: ST.pdf20 Nov 2025
Form 2A (FY 2024-2025)File: South Tower.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Mahalaxmi ST.pdf30 Sep 2025
Details of encumbrancesFile: Encumbrances ST_17042025171638.PDF17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf20 Jan 2025
OtherFile: ST.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf20 Jan 2025
OtherFile: ST.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi T1 ST Form 1, December'2024.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf20 Jan 2025
Certificates of CA (Form 3)File: Mahalaxmi South Tower.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi ST Form 2, December'2024.pdf20 Jan 2025
OtherFile: ST.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Piramal Mahalaxmi South Tower.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Piramal Mahalaxmi ST Sold Unsold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf18 Oct 2024
Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf18 Oct 2024
Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Mahalaxmi_ST Form 1, Sept'2024.pdf18 Oct 2024
Certificates of CA (Form 3)File: Piramal Mahalaxmi_ST Form 3, Sept'2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Mahalaxmi_ST Form 2, Sept'2024.pdf18 Oct 2024
OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf17 Oct 2024
OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf17 Oct 2024
OtherFile: 03 Piramal Mahalaxmi ST, FSI Declaration.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 04 Piramal Mahalaxmi ST, Sold Unsold Inventory.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 ST 2023-2024.pdf7 Oct 2024
Details of encumbrancesFile: South Tower.pdf5 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_8 MAY 2024_Mahalaxumi_compressed.pdf5 Aug 2024
Certificates of CA (Form 3)File: M_ST_merged.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalaxmi_ST_Form 2_June 24 .pdf19 Jul 2024
Details of encumbrancesFile: Encumbrance Certificate - Piramal Mahalaxmi.pdf18 Jul 2024
CERSAI detailsFile: CERSAI_Piramal Mahalaxmi.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Mahalaxmi ST.pdf18 Jul 2024
OtherFile: Mahalaxmi_South_FSI_June 24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalaxmi South.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: South Tower_SoldUnsold.pdf4 Jul 2024
OtherFile: Mahalxmi South_FsiC_June 24 .pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ST EC.pdf19 Apr 2024
Certificates of CA (Form 3)File: ST CA.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ST AC.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: ST SOLD UNSOLD.pdf16 Apr 2024
OtherFile: ST FSI.pdf16 Apr 2024

How this compares with Mumbai City

82%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep South Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Saatraasta780+ in Mumbai City

2 kmSouth TowerCompleted 19Lapsed / revoked 36Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: Glider Buildcon Realtors

Glider Buildcon Realtors has 3 registrations on MahaRERA, including South Tower and Central Tower - Tower 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that South Tower shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if South Tower is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of South Tower?

The registered promoter entity is Glider Buildcon Realtors, a company as per the filing. Its CIN U70200MH2015PTC265844 and GSTIN 27AAGCG0288B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in South Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against South Tower?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for South Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at South Tower?

The professionals named in the filing: Architect: Anand Vishnu Dhokay; Engineer: WTP Cost Advisory Services India Pvt. Ltd; Engineer: Kishor Parmar; Chartered Accountant: SRBC & CO LLP; Chartered Accountant: D B Ketkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in South Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About South Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save South Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.