Home / Browse projects / Seventh Avenue

Registered Litigation declared Others project

Seventh Avenue

By Rubberwala Housing & Infradevelopment LLP

RG-MH-39975 · RERA P51900048564 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 18%
200 of 320Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Seventh Avenue is a Others project by Rubberwala Housing & Infradevelopment LLP in Byculla, Mumbai, 400011, registered with MahaRERA as P51900048564 on 6 Jan 2023. Possession is promised by 31 Dec 2026. 120 of the 320 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSeventh Avenue
  • TypeOthers
  • Location
    • Ganesh Hari Parundekar Marg
    • Byculla
    • Mumbai
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900048564
  • ReraGenie IDRG-MH-39975

Builder

  • NameRubberwala Housing & Infradevelopment LLP
  • Entity typePartnership
  • GSTIN27ABFFR7450R1ZD
  • PartnersRubberwala Housing and Infrastructure Limited, AVF Builders LLP, Hilton Realtors LLP

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

38%120 of 320 units booked
74.4%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA343131010320

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 18%.

Wing A: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed337

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots337
Closed/Covered110
Open Space227

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,254 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI16582.1
Proposed, not sanctioned13,940 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch82, CYRUS AVENUE, KHATIJA MANSION, DR AR NAIR RD, MUMBAI CENTRAL, MUMBAI 400008
Estimated costRs 129.66 cr
Cost incurredRs 96.48 cr
Work done74.41%
BuildingWingEstimatedIncurred
Wing ANARs 126.50 crRs 96.48 cr
-NARs 3.16 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHAMMED ALI SHAIKH
EngineerIDRISH DOHADWALA
EngineerDipesh Joshi
EngineerAFTAB SHAIKH
Chartered AccountantMOHAN L GUPTA
PartnerRole in project
Rubberwala Housing & Infradevelopment LLP-

Litigation declared2

CaseCourtStatus
3628/2022High Court MumbaiPending
10909/2022High Court MumbaiPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Cert lbc mar26.pdf25 May 2026
Withdrawal Update Form 2File: Eng_cert_lbc_mar26.pdf25 May 2026
Withdrawal Update Form 3File: CA seventh 31326.pdf25 May 2026
Withdrawal Update Form 1File: Arch cet lbc dec25.pdf24 Apr 2026
Withdrawal Update Form 1File: Arch cet lbc dec25.pdf24 Apr 2026
Withdrawal Update Form 2File: ENG CER LBC DEC25.pdf24 Apr 2026
Withdrawal Update Form 2File: ENG CER LBC DEC25.pdf24 Apr 2026
Withdrawal Update Form 3File: CA seventh 31326.pdf24 Apr 2026
Withdrawal Update Form 3File: CA seventh 31326.pdf24 Apr 2026
Withdrawal Update Form 1File: ARCH CERT LBC JUN25.pdf13 Jan 2026
Withdrawal Update Form 1File: ARCH CERT LBC JUN25.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch cert_lbc sep 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Arch cert_lbc sep 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: ENG CERLBC JUNE25.pdf13 Jan 2026
Withdrawal Update Form 2File: ENG CERLBC JUNE25.pdf13 Jan 2026
Withdrawal Update Form 2File: Eng Cert sep25_lbc.pdf13 Jan 2026
Withdrawal Update Form 2File: Eng Cert sep25_lbc.pdf13 Jan 2026
Withdrawal Update Form 3File: CA LBC JUN25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA LBC JUN25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CERT_LBC SEP25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CERT_LBC SEP25.pdf13 Jan 2026
Form 1File: ARCH CERT LBC JUN25.pdf5 Aug 2025
Form 2File: ENG CERLBC JUNE25.pdf5 Aug 2025
Form 3File: CA LBC JUN25.pdf5 Aug 2025
Self-declaration of Quarterly ProgressFile: Document_250715_120851.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: disc sold june25-lbc.pdf5 Aug 2025
Form 1File: ARCH CERT LBC MAR25.pdf21 Jul 2025
Form 2File: Eng Cert LBC mar25 (2).pdf21 Jul 2025
Form 3File: CA CERT LBC MAR25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disc_sold book.pdf21 Jul 2025
Self-declaration of Quarterly ProgressFile: QPR_LBC (1).pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA LBC MAR25.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT LBC MAR25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert LBC mar25 (2).pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CER dec24 LBC_compressed.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA LBC SEP24_compressed.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert LBCsep24.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert LBC Dec24.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT_LBC_DEC24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT LBC SEP24.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CER MAR24-LBC_compressed.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT JUNE24 LBC_compressed.pdf14 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalid_CC_upto june 2025.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_mar24_LBC.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_jun24_LBC.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Seventh Avenue as on March 2024.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Seventh Avenue as on June 2024.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-23-24-Seventh Avenue.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_LBC2024.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng cert-2024_lbc.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Seventh Avenue as on Dec 2023.pdf4 Mar 2024
Layout approvalFile: Drawing 1 2_compressed.pdf13 Feb 2024
Layout approvalFile: Drawing 3 4.pdf13 Feb 2024
Layout approvalFile: 567_compressed.pdf13 Feb 2024
Copy of Layout Approval (in case of layout)File: Drawing 1 2_compressed.pdf13 Feb 2024
Copy of Layout Approval (in case of layout)File: Drawing 3 4.pdf13 Feb 2024
Copy of Layout Approval (in case of layout)File: 567_compressed.pdf13 Feb 2024
Building plan approvalFile: Amended approval letter 05122023.pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended approval letter 05122023.pdf16 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Acc Declaration_Format A_Seventh Av.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: upto March_compressed.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_Cert 7th Avenue 572023_compressed.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_ Cert_7th Avenue 3102023_compressed.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Seventh Avenue as on 2022-23.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 R H I LLP.pdf30 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation till 15-06-24.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 3-10-2023.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30-09-2023.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 30-09-2023.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on March 2023_compressed.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on June 2023_compressed.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2023_compressed.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on June 2023_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on March 2023_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on June 2023_compressed.pdf27 Sep 2023
Layout approvalFile: Final Rubberwala_1-1.pdf23 Dec 2022
Building plan approvalFile: Final Rubberwala_2-3.pdf23 Dec 2022
Building plan approvalFile: Final Rubberwala_4-5_11zon.pdf23 Dec 2022
Building plan approvalFile: Final Rubberwala_6-7.pdf23 Dec 2022
Copy of Layout Approval (in case of layout)File: Final Rubberwala_1-1.pdf23 Dec 2022

Keep Seventh Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Byculla, Mumbai

2 kmSeventh AvenueCompleted 9Lapsed / revoked 16Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Rubberwala Housing & Infradevelopment LLP

Rubberwala Housing & Infradevelopment LLP has 1 registration on MahaRERA, including Seventh Avenue. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Seventh Avenue is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Seventh Avenue?

The registered promoter entity is Rubberwala Housing & Infradevelopment LLP, a partnership as per the filing. Its GSTIN 27ABFFR7450R1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Seventh Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Seventh Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Seventh Avenue?

The professionals named in the filing: Architect: MOHAMMED ALI SHAIKH; Engineer: IDRISH DOHADWALA; Engineer: Dipesh Joshi; Engineer: AFTAB SHAIKH; Chartered Accountant: MOHAN L GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Seventh Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Seventh Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Seventh Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.