Home / Browse projects / Mumbai City, Maharashtra / Lodha Bellevue
Lodha Bellevue
RG-MH-44463 · RERA P51900046567 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 30 cases
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lodha Bellevue is a Residential / Group Housing project by Lodha Developers Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900046567 on 13 Aug 2022. Possession is promised by 30 Sep 2028. 217 of the 360 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameLodha Bellevue
- TypeResidential / Group Housing
- Location
- Byculla
- Mumbai City
- 400011
- Pincode400011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900046567
- ReraGenie IDRG-MH-44463
Builder
- NameLodha Developers Limited
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- WtdRaunika Malhotra
- Other registrations178 more →
- Completed16 of 179
- No longer live3 lapsed, de-registered or revoked
- Past their filed date3
- Declared earlier projects22 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Aug 2022
- Promised completion30 Sep 2028
- Revised completionNone
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 1 | NA | 59 | 57 | 360 | 0 | 360 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 62%.
Wing 1: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 62% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 32% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed605
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Money Magnum Nest Private Limited | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing 1 | NA | Rs 323.58 cr | Rs 187.30 cr |
| - | NA | Rs 174.23 cr | Rs 100.85 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Architect | Pradeepmkamble and associates |
| Engineer | K C SHAH DESIGNS LLP |
| Engineer | Amol Paranjkar |
| Chartered Accountant | Chirag |
| Chartered Accountant | M S K A & Associates |
| Partner | Role in project |
|---|---|
| Lodha Developers Limited | - |
Litigation declared30
| Case | Court | Status |
|---|---|---|
| WP/7099/2016/2016 | High Court of Bombay | Not related to Bradbury project |
| CP/160/2016/2016 | High Court of Bombay | Not related to Bradbury project |
| WP/13037/2017/2016 | High Court of Bombay | Not related to Bradbury project |
| Suit No/100030/2019/2019 | High Court of Bombay | Not related to Bradbury project |
| Suit No/101804/2018/2018 | City Civil Court Mumbai | Not related to Bradbury project |
| Misc Crim Application No 385 of 2016/2016 | JMFC Court Two Thane | Not related to Bradbury project |
| M C A/259/2019/2019 | District and Sessions Court Pune | Not related to Bradbury project |
| R C S/676/2019/2019 | Civil Court Senior Division Pune | Not related to Bradbury project |
| WP/3494/2019/2019 | High Court of Bombay | Not related to Bradbury project |
| WP/2238/2019/2019 | High Court of Bombay | Not related to Bradbury project |
| WP/2218/2019/2019 | High Court of Bombay | Not related to Bradbury project |
| CC/2/2017/2017 | High Court of Bombay | Not related to Bradbury project |
| S/117/2014/2014 | High Court of Bombay | Not related to Bradbury project |
| SUIT/100807/2021/2021 | City Civil Court Mumbai | Not related to Bradbury project |
| Notice Of Motion/102139/2021/2021 | City Civil Court Mumbai | Not related to Bradbury project |
| Notice Of Motion/101874/2021/2021 | City Civil Court Mumbai | Not related to Bradbury project |
| Notice Of Motion/101401/2021/2021 | City Civil Court Mumbai | Not related to Bradbury project |
| TER/106/2021/2021 | Small Causes Court Dhobi Talao Mumbai | Ongoing |
| R Appeal/214/2019/2019 | Small Causes Court Dhobi Talao Mumbai | Filed by landowning entity against former tenant |
| R A D Suit no 1250 of 2018/2018 | Small Causes Court Mumbai | Filed by alleged tenant against landowning entity |
| L C Suit No 8840 of 2019/2019 | Bombay City Civil Court | Disposed Case |
| T E R Suit No 106 of 2021/2021 | Small Causes Court at Mumbai | Filed by landowning entity against former tenant |
| T E Suit L No 1127/2021/2021 | Small Causes Court at Mumbai | Filed by landowning entity against former tenant |
| Appeal No 214 of 2019/2019 | Small Causes Court at Mumbai | Filed by landowning entity against former tenant |
| Writ Petition L no 24535 of 2021/2021 | High Court of Bombay | Disposed Case |
| Writ Petition No 2859 of 2021/2021 | High Court of Bombay | Disposed Case |
| Commercial Arbitration Petition No 1238 of 2019/2019 | High Court of Bombay | Not relevant to Bradbury project or land owning entity |
| Commercial Arbitration Petition No 1307 of 2019/2019 | High Court of Bombay | Not relevant to Bradbury project or land owning entity |
| Commercial Arbitration Petition No 1406 of 2019/2019 | High Court of Bombay | Disposed Case |
| Commercial Arbitration Petition No 1407 of 2019/2019 | High Court of Bombay | Disposed Case |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000292406 | Urban Infrastructure Trustees Ltd | macrotech developers limited | 22/08/2022 |
| CC006000000303651 | Shailesh Palande | Macrotech Developers Limited | 12/12/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2028
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A - Lodha Bellevue - P51900046567.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Lodha Bellevue Tower 1 - Form1 - Mar 26 - P51900046567 -okk---.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Lodha Bellevue Tower 1 - Form1 - Mar 26 - P51900046567 -okk---.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Bellevue Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Bellevue Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Bellevue Form 3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Bellevue Form 3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form -1 Bellevue T-1 Dec-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Bellevue T1 Form 2.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Bellevue T1 Form-3.pdf | 23 Jan 2026 |
| Layout approvalFile: 01-25 - Layout.pdf | 12 Dec 2025 |
| Building plan approvalFile: 02-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 03-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 04-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 05-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 06-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 07-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 08-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 09-25.pdf | 12 Dec 2025 |
| Building plan approvalFile: 10-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: Lodha Bellevue-scan.pdf | 26 Oct 2025 |
| Withdrawal Update Form 2File: Lodha Bellevue - Form 2.pdf | 26 Oct 2025 |
| Withdrawal Update Form 3File: Lodha Bellevue - Form 3.pdf | 26 Oct 2025 |
| Form 5 (FY 2024-2025)File: Lodha Bellevue - 46567.pdf | 14 Oct 2025 |
| Form 2A (FY 2024-2025)File: Lodha Mahalakshmi- Tower 4-Renamed to Lodha Bellevue - P51900046567 - Form 2A.pdf | 25 Jul 2025 |
| Commencement certificateFile: Sold Unsold - Lodha Bellevue - Junu002725.pdf | 19 Jul 2025 |
| Form 1File: Form 1- Lodha Bellevue Mar-25.pdf | 28 May 2025 |
| Form 2File: Form2 - Lodha Bellevue- Mar-25.pdf | 28 May 2025 |
| Form 3File: Form3 - Lodha Bellevue- Mar-25.pdf | 28 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - Lodha Bellevue- Mar-25.pdf | 28 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Bellevue.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bellevue T1 Dec 24.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bellevue T1 Dec 24.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Bellevue T1 Dec 24.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha bellevue.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sign Bellevue T1.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sign Bellevue T1 - Lodha Bellevue.pdf | 30 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Bellevue T1.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Bellevue.pdf | 5 Nov 2024 |
| Layout approvalFile: 2024 02 09 Bradbury RG on ground layout approval Dwg - Layout.pdf | 22 Oct 2024 |
| Building plan approvalFile: wing 1 and 2 - 1-1 - wing 1 - 6 - 15.pdf | 22 Oct 2024 |
| Building plan approvalFile: wing 1 and 2 - 2-2 - Wing 1 7 - 15.pdf | 22 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: 2024 02 09 Bradbury RG on ground layout approval Dwg - Layout.pdf | 22 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2024 05 22_Bradbury FCC_Wing 1 3 full CC.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: wing 1 and 2 - 1-1 - wing 1 - 6 - 15.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: wing 1 and 2 - 2-2 - Wing 1 7 - 15.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51900046567 - Lodha Bellevue.pdf | 18 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Mahalakshmi- Tower 4-Renamed to Lodha Bellevue - P51900046567.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Mahalakshmi- Tower 4-Renamed to Lodha Bellevue - P51900046567 - June24.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Bellevue - P51900046567 - June24.pdf | 7 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Bradbury FCC_Wing 1 3 full CC.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Bellevue - P51900046567 - March 24.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lodha Bellevue - P51900046567 - March 24.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Bellevue - P51900046567 - March 24.pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Lodha Bellevue - Dec23.pdf | 16 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lodha Bellevue - P51900046567 - March 24.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lodha Bellevue - Form2 - Jan24.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lodha Bellevue - Form3 - Jan24.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - Lodha Bellevue - P51900046567 - Dec23.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Bellevue - P51900046567 - Dec23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Bellevue - P51900046567 - Sold Unsold - Dec23.pdf | 26 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Bellevue.pdf | 28 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Bellevue.pdf | 28 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Lodha Bellevue - Sep23.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Bellevue - Form1 - Sep23.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Bellevue.pdf | 16 Oct 2023 |
| Proforma of Agreement for saleFile: AFS Standard App Form [Non-RTMI Residential] - [22082022].pdf | 29 Aug 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 29 Aug 2023 |
| Proforma of Allotment letterFile: 1 Proforma of Agreement for sale (17).pdf | 29 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Lodha Bellevue.pdf | 23 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold.pdf | 28 Feb 2023 |
| Building plan approvalFile: Building Plan-5-Wing 1.pdf | 19 Aug 2022 |
| Building plan approvalFile: Building Plan-6-Wing 1.pdf | 19 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances of Concern to Legal-Bellevue - 190822.pdf | 19 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan-5-Wing 1.pdf | 19 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan-6-Wing 1.pdf | 19 Aug 2022 |
| Other - LegalFile: Declaration.pdf | 17 Aug 2022 |
| Details of encumbrances concerned to LegalFile: 0613_001.pdf | 12 Aug 2022 |
| Other - LegalFile: Supplemental Leglal Title Report Bradbury.pdf | 12 Aug 2022 |
| Other - LegalFile: 0601_001.pdf | 12 Aug 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| UPPER THANE - SERENO D AND E | 27by2 28by14 Pt Surai Bhiwandi Thane 421302 | 233 | Completed | Mar 2023 | Aug 2022 |
| LODHA AMARA - TOWER 29,31 | 63by5 64by2 65by5 68by2 68by5 at Village Balkum Thane 400607 | 323 | Completed | Jul 2022 | Mar 2020 |
| The World Towers - World One - Tier II | 443 444 2by445 446 PART ONLY Gsouth Ward Gsouth Mumbai City 400013 | 61 | Completed | Sep 2019 | Late, Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 178 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Lodha Bellevue on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Byculla780+ in Mumbai City
Filed coordinates, straight-line distance. 132 registered projects within 2 km.
NATHANI HEIGHTS SALE
Nathani Parekh Constructions Private Limit
North Tower - Tower 3
Glider Buildcon Realtors
MONTESOUTH ZERMATT-1
SWAYAM REALTORS & TRADERS LLP
South Tower
Glider Buildcon Realtors
MINERVA
Lokhandwala Kataria Construction Private L
Seventh Avenue
Rubberwala Housing & Infradevelopment LLP
See every Mumbai City project, with the district possession charts
Builder: Lodha Developers Limited
LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if Lodha Bellevue is delayed beyond 30 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lodha Bellevue?
The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lodha Bellevue?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Lodha Bellevue?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Lodha Bellevue?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lodha Bellevue?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Architect: Pradeepmkamble and associates; Engineer: K C SHAH DESIGNS LLP; Engineer: Amol Paranjkar; Chartered Accountant: Chirag; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lodha Bellevue?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.