Registered No litigation declared Residential / Group Housing project

MONTESOUTH ZERMATT-1

By SWAYAM REALTORS & TRADERS LLP

RG-MH-53082 · RERA P51900033347 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2030Possession promisedmoved 54 months from the original
1 of 11Construction stages donefurthest along: Excavation, 70%
256 of 396Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 236 documents Report an error

MONTESOUTH ZERMATT-1 is a Residential / Group Housing project by SWAYAM REALTORS & TRADERS LLP in BAHYCULLA, 400011, registered with MahaRERA as P51900033347 on 16 Feb 2022. Possession is promised by 30 Dec 2030. The completion date has moved by 54 months from the original filing. 140 of the 396 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMONTESOUTH ZERMATT-1
  • TypeResidential / Group Housing
  • Location
    • BABURAO JAGTAP MARG
    • BAHYCULLA
    • 400011
  • Pincode400011
  • RERA no.P51900033347
  • ReraGenie IDRG-MH-53082

Builder

  • NameSWAYAM REALTORS & TRADERS LLP
  • Entity typePartnership
  • GSTIN27ACEFS2816A1ZI
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSUNIL BALAKRISHNA SHARMA
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2022First promiseJun 2026Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Feb 2022
  • Promised completion30 Dec 2030
  • Revised completionRevised to 30 Dec 2030 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed236 files

Current status

35%140 of 396 units booked
21.9%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg. No.1 (Wing-C)Bldg. NO.1 (Wing-C)70573960396

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 70%.

Bldg. No.1 (Wing-C) · wing Bldg. NO.1 (Wing-C): 35% average across the applicable activities

ActivityProgress
Excavation70%
Basement (if any)60%
Podiums (if any)51%
Plinth100%
Stilt Floor56%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed778

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots778
Closed/Covered678
Open Space100

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area33,179 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2024

Approvals and building plan

Permissible FSI39275.1
Proposed, not sanctioned39,275 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, RAGHUVANSHI MILLS COMPOUND, SENAPATI BAPAT MARG, LOWER PAREL (WEST), MUMBAI – 400 013
Estimated costRs 657.92 cr
Cost incurredRs 144.03 cr
Work done21.89%
BuildingWingEstimatedIncurred
Bldg. No.1 (Wing-C)Bldg. NO.1 (Wing-C)Rs 588.86 crRs 132.86 cr
-NARs 69.07 crRs 11.17 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantoshkumar Premchandra Dubey
EngineerUrvesh Virendra Mehta
Chartered AccountantKaushal Chaulawala
Chartered AccountantAnkit Shah
Chartered AccountantB R Nagda & Co. Chartered Accountants
Chartered AccountantDinesh Ganpat Pai
Chartered AccountantSamip Kiritkumar Shah
PartnerRole in project
SWAYAM REALTORS & TRADERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900025205Jun 2026 → Dec 2030

Reason as filed by the promoterDear sir According to RERA Order No.50/2024 dated 10th January, 2024 further floors above 30th floor upto 63rd floor or more floors are merged/added in the Real Estate Project namely “Monte South Zermatt-1”. In view thereof, the revised date of project completion is 31st December, 2030. kindly please revised RERA CERTIFICATE .

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503969Daksha Rajesh JainSWAYAM REALTORS & TRADERS LLP12/11/2025
CC12504640Suresh Prakash PoojariSWAYAM REALTORS & TRADERS LLP27/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2030

Documents filed236

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 236 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arc Cert Zermatt 1 Mar 2026 Sign.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 Eng Cert Zermatt 1 Mar 2026 Sign.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 CA Cert Zermatt Mar 2026.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 Arc Cert Zermatt Dec 2025.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 Eng Cert Zermatt 1 Dec 2025.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 CA cert Zermatt Dec 2025 Sign 1.pdf20 May 2026
Form 2A (FY 2025-2026)File: Form 2A Zermatt Mar 2026.pdf21 Apr 2026
Layout approvalFile: LAYOUT01.pdf6 Feb 2026
Layout approvalFile: layout.pdf3 Feb 2026
Building plan approvalFile: 1st basement.pdf3 Feb 2026
Building plan approvalFile: 3rd basement.pdf3 Feb 2026
Building plan approvalFile: 1st parking flr.pdf3 Feb 2026
Building plan approvalFile: 2nd parking flr.pdf3 Feb 2026
Building plan approvalFile: 3rd parking flr.pdf3 Feb 2026
Building plan approvalFile: 4th parking flr.pdf3 Feb 2026
Building plan approvalFile: 5th parking flr.pdf3 Feb 2026
Building plan approvalFile: 5th-1 parking flr.pdf3 Feb 2026
Building plan approvalFile: 6th podium flr.pdf3 Feb 2026
Building plan approvalFile: ground flr.pdf3 Feb 2026
Building plan approvalFile: lower gr.pdf3 Feb 2026
Building plan approvalFile: C Wing 7th 8th 14th Terrace Floor Plan-compressed.pdf3 Feb 2026
Building plan approvalFile: C Wing 9th 10th compressed.pdf3 Feb 2026
Building plan approvalFile: C Wing 11th to 13th 15th to 20th 22nd to 27th 29th to 34th Floor Plan-compressed.pdf3 Feb 2026
Building plan approvalFile: C Wing 21st 28th 35th to 42nd Floor Plan-compressed (1).pdf3 Feb 2026
Building plan approvalFile: C Wing 43rd to 62nd Floor Plan-compressed.pdf3 Feb 2026
Building plan approvalFile: C Wing-63rd pt Terrace Floor Plan-compressed.pdf3 Feb 2026
Form 2A (FY 2021-2022)File: Form 2 A Zermatt 2022.pdf29 Jan 2026
Form 2A (FY 2022-2023)File: FORM-2A ZERMATT 1_ MAR-2023.pdf29 Jan 2026
Form 2A (FY 2023-2024)File: FORM-2A ZERMATT 1_ MAR-2024.pdf29 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Zermatt Mar 2025.pdf29 Jan 2026
Building plan approvalFile: 6 Project Information.pdf18 Dec 2025
Building plan approvalFile: 7 Project Information.pdf18 Dec 2025
Building plan approvalFile: 7 Project Information.pdf18 Dec 2025
Building plan approvalFile: 8 Project Information.pdf18 Dec 2025
Building plan approvalFile: 9 Project Information.pdf18 Dec 2025
Building plan approvalFile: 10 Project Information.pdf18 Dec 2025
Building plan approvalFile: 11 Project Information.pdf18 Dec 2025
Withdrawal Update Form 1File: Q2_ AC_Form-1_Zermatt-1_2025.pdf18 Dec 2025
Withdrawal Update Form 1File: Q2_ AC_Form-1_Zermatt-1_2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engg Cert Zermatt 1 Sep 2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Form 2 Engg Cert Zermatt 1 Sep 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: 202506 RERA Certificate Montesouth Tower C Zermatt 1 - Form 3.pdf18 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Cert Zermatt 1 Sep 2025 upload.pdf18 Dec 2025
Withdrawal Update Form 1File: Q1_AC_Form-1_Zermatt-1_2025.pdf16 Dec 2025
Withdrawal Update Form 2File: Form 2 Eng Cert Zermatt Jun 2025.pdf16 Dec 2025
Withdrawal Update Form 3File: 202506 RERA Certificate Montesouth Tower C Zermatt 1 - Form 3.pdf16 Dec 2025
Form 5 (FY 2021-2022)File: Form 5 Zermatt 1 2021-22.pdf16 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 Zermatt 1 2022-23 (2).pdf16 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 Zermatt 23-24.pdf16 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Zermatt 1 2024-25.pdf11 Dec 2025
Form 1File: Form 1 Arc Cert Zermatt Mar 2022.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert Zermatt Mar 2022.pdf8 Dec 2025
Form 3File: Form 3 Ca Cert Zermatt Mar 2022.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclousre Sold Unsold Zermatt Mar 2022.pdf8 Dec 2025
Form 1File: AC_Form-1_Zermatt-1_2022.pdf8 Dec 2025
Form 2File: Form 2 Engineer's Certificate Zermatt Jun 2022.pdf8 Dec 2025
Form 3File: Form 3 Ca Cert Zermatt 1 Jun 2022.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Zermatt 1 Jun 2022.pdf8 Dec 2025
Form 1File: Q2_AC_Form-1_Zermatt-1_2022.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert Zermatt Sep 2022.pdf8 Dec 2025
Form 3File: Form 3 CA Cert Zermatt Sep 2022.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Zermatt Sep 2022.pdf8 Dec 2025
Form 1File: Q1_AC_Form-1_Zermatt_2022.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert Zermatt Dec 2022.pdf8 Dec 2025
Form 3File: Form 1 CA Cert Zermatt Dec 2022.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discloure Sold Unsold Inentory Zermatt Dec 2022.pdf8 Dec 2025
Form 1File: Q4_AC_Form-1_Zermatt-1_2023.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert Zermatt Mar 2023.pdf8 Dec 2025
Form 3File: Form 3 CA Cert Zermatt Mar 2023.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosur Sold Unsold Inventory Zermatt Mar 2023.pdf8 Dec 2025
Form 1File: AC_Form-1_Zermatt-1_2023.pdf8 Dec 2025
Form 2File: Zermatt-1 RERA Eng certificate till 3-08-2023.pdf8 Dec 2025
Form 3File: Form 3 Ca Cert Zermatt 1 Jun 2023.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Zermatt 1 Jun 2023.pdf8 Dec 2025
Form 1File: Q2_AC_Form-1_Zermatt-1_2023.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert Zermatt-1 September-2023.pdf8 Dec 2025
Form 3File: Form 3 CA Cert Zermatt 1 Sep 2023.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclousre sold unsold Zermatt 1 Sep 2023.pdf8 Dec 2025
Form 1File: Q3_AC_Form-1_Zermatt-1_2023.pdf8 Dec 2025
Form 2File: Form 2 Engg Cert zermatt 1 Dec 2023.pdf8 Dec 2025

Keep MONTESOUTH ZERMATT-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAHYCULLA

Builder: SWAYAM REALTORS & TRADERS LLP

SWAYAM REALTORS & TRADERS LLP has 9 registrations on MahaRERA, including MONTESOUTH-1 and MONTESOUTH-2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if MONTESOUTH ZERMATT-1 is delayed beyond 30 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MONTESOUTH ZERMATT-1?

The registered promoter entity is SWAYAM REALTORS & TRADERS LLP, a partnership as per the filing. Its GSTIN 27ACEFS2816A1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MONTESOUTH ZERMATT-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MONTESOUTH ZERMATT-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MONTESOUTH ZERMATT-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MONTESOUTH ZERMATT-1?

The professionals named in the filing: Architect: Santoshkumar Premchandra Dubey; Engineer: Urvesh Virendra Mehta; Chartered Accountant: Kaushal Chaulawala; Chartered Accountant: Ankit Shah; Chartered Accountant: B R Nagda & Co. Chartered Accountants; Chartered Accountant: Dinesh Ganpat Pai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MONTESOUTH ZERMATT-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MONTESOUTH ZERMATT-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MONTESOUTH ZERMATT-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.