Red flags

  • Litigation declared, 3 cases
  • 54 complaints at MahaRERA
  • Completion date moved by 36 months
  • 3 extensions taken
  • Encumbrance declared on the project land, in favour of ASIA PRAGATI REAL ESTATE INVESTMENT FUND

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
18 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 99%
68 of 372Units unsoldnot recorded sold or booked
54Complaints at MahaRERAon this registration
Jump to the 391 documents Report an error

MINERVA is a Residential / Group Housing project by Lokhandwala Kataria Construction Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900008204 on 18 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 304 of the 372 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 54 complaints are on record with the regulator.

At a glance

Project

  • NameMINERVA
  • TypeResidential / Group Housing
  • Location
    • J R BORICHA MARG
    • LOWER PAREL
    • Ward GSouth
    • Mumbai City
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900008204
  • ReraGenie IDRG-MH-24612

Builder

  • NameLokhandwala Kataria Construction Private Limited
  • Entity typeCompany
  • CINU45200MH1998PTC117468
  • GSTIN27AAACL5105A1Z7
  • DirectorALIASGAR MOHAMMED LOKHANDWALA

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed391 files

Current status

82%304 of 372 units booked
94.5%Work done, per cost certificate

Figures as on 17 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MINERVA 1A 1-39NA42252000200
MINERVA 1B 40-65NA26221240124
MINERVA 1C 66-79NA141448048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 99%.

MINERVA 1A 1-3999%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
MINERVA 1B 40-6578%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
MINERVA 1C 66-7971%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 17 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes40%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%

Parking filed882

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots882
Closed/Covered882
BuildingClosed/CoveredTotal
MINERVA 1A 1-39467467
MINERVA 1B 40-65296296
MINERVA 1C 66-79119119

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area7,908 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofASIA PRAGATI REAL ESTATE INVESTMENT FUND
CERSAI search filedYes
Declared on25 Sep 2024

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI62319.17
Proposed, not sanctioned62,319 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDr A B Road Worli MUMBAI 400018
Estimated costRs 1,056
Cost incurredRs 998
Work done94.55%
BuildingWingEstimatedIncurred
MINERVA 1A 1-39NARs 656Rs 612
MINERVA 1B 40-65NARs 258Rs 250
MINERVA 1C 66-79NARs 142Rs 136

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT THORAT
EngineerAVINASH DATTATRAY WAGHMARE
Chartered AccountantHARE K PANDA AND CO
Chartered AccountantNEHA AMIT AND ASSOCIATES
PartnerRole in project
Lokhandwala Kataria Construction Private Limited-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900018187Dec 2023 → Dec 2024

Reason as filed by the promoterAs per letter attached.

EXT51900024786Dec 2023 → Dec 2025

Reason as filed by the promoter1) Delays due to Government Authorities 2) Other Impediments 3) Covid -19

EA25122518993Dec 2023 → Dec 2026

Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing no. P51900008204 to 31st December 2026. 1. We have obtained Occupation Certificate in respect of all habitable floors and units in the Project as under :- (a) Part Occupation Certificate from the Slum Rehabilitation Authority bearing no. SRA/ENG/2375/ GS/ML/AP dated 6th January, 2023 upto 39th Level as per the sanctioned plans. (b) Further we have obtained Part Occupation Certificate from Slum Rehabilitation Authority bearing no. SRA/ENG/2375/GS/ML/AP from 40th Level to 79th Level. 2. Upon receipt of Occupation Certifica

Litigation declared3

CaseCourtStatus
793/2016NATIONAL CONSUMER COURT NEW DELHIClosed
1570/2016NATIONAL CONSUMER COURT NEW DELHIClosed
198/2022BOMBAY HIGH COURTPENDING

Complaints filed with MahaRERA54

Case no.ComplainantRespondentFiled
CC006000000055828UPASNA BAJAJLOKHANDWALA KATARIA CONSTRUCTION PRIVATE LIMITED16/08/2018
CC006000000056191KARUNA KISHORE MANGHARAMLOKHANDWALA KATARIA CONSTRUCTION PRIVATE LIMITED18/09/2018
CC006000000056240Moneyam NatesanLokhandwala Kataria Construction Pvt Ltd18/09/2018
CC006000000056506Sanjay Kumar Ramniklal GhaghdaLokhandwala Kataria Constructions Pvt. Ltd.09/10/2018
CC006000000057728Mayank Chemiplast Pvt. Ltd.Lokhandwala Kataria Construction Pvt. Ltd.18/01/2019
CC006000000057771KANCHAN A. PARIKHLokhandwala Kataria Construction Pvt. Ltd22/01/2019
CC006000000079369Hena S. AggarwalLokhandwala Kataria Construction Pvt. Ltd.03/06/2019
CC006000000110734Shashi Sumeet Productions Pvt. Ltd.LOKHANDWALA KATARIA CONSTRUCTION PVT LTD28/08/2019
CC006000000197697Mr. Harshad C ParekhLokhandwala Kataria Construction Pvt Ltd23/07/2021
CC006000000171537Mr. Esoof Shoeb ContractorLokhandwala Kataria Constructions Pvt Ltd14/11/2019
CC006000000171880MRS. RITA ANIL PARMAR AND MR. ANIL RATILAL PARMARLOKHANDWALA KATARIA CONSTRUCTION PRIVATE LIMITED16/12/2019
CC006000000197027SHAILESH PARDIWALALOKHANDWALA KATARIA CONSTRUCTION PRIVATE LIMITED21/05/2021
CC006000000197043SHAILESH PARDIWALALOKHANDWALA KATARIA CONSTRUCTION PRIVATE LIMITED21/05/2021
CC006000000171883Anil GehaniLokhandwala Kataria Construction Pvt Ltd16/12/2019
CC006000000192279Mr. Ali Mazhar LailaM/s Lokhandwala Kataria Construction Pvt. Ltd.24/01/2020
CC006000000194241Lalchnd Jewellers Private LimitedLokhandwala Kataria Constructions Private Limtied05/10/2020
CC006000000194512LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDMAYANK CHEMIPLAST PVT LTD17/10/2020
CC006000000195243LOKHANDWALA KATARIA CONSTRUCTIONS PVT LTDKANCHAN AZAD PARIKH15/12/2020
CC006000000194623Manju DhariwalLokhandwala kataria constructions22/10/2020
CC006000000194634prithviraj dhariwalLokhandwala kataria constructions22/10/2020
CC006000000196924Deepak MaheshwariLokhandwala Kataria Construction Pvt. Ltd.07/05/2021
CC006000000408127Deepak MaheshwariLokhandwala Kataria Infrastructure Pvt Ltd16/11/2023
CC006000000198052Sundeep DhawanM/s. Lokhandwala Kataria Construction Pvt. Ltd.20/08/2021
CC006000000199347VIJAY ARJUNDAS GURWADALOKHANDWALA KATARIA CONSTRUCTION PVT LTD08/12/2021
CC006000000199348RITA VIJAY GURWADALOKHANDWALA KATARIA CONSTRUCTION PVT LTD08/12/2021
CC006000000210195Indu PoddarLokhandwala Kataria Construction Pvt Ltd.28/02/2022
CC006000000333904Indua PoddarLokhandwala Kataria Construction Pvt Ltd07/01/2023
CC006000000282191SHREE SAISIDHI EXPORT LLPLOKHANDWALA KATARIA CONSTRUCTION PVT. LTD.03/08/2022
CC006000000303304Ashok VenkatramaniLokhandwala Kataria Pvt. Ltd.11/11/2022
CC006000000354463LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDKanchan A. Parikh23/02/2023
CC006000000364550LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDHARSHAD PAREKH & ANR01/03/2023
CC006000000364552LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDDeepak Maheshwari and Neetu Maheshwari01/03/2023
CC006000000364553LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDANIL GEHANI & ANR01/03/2023
CC006000000364554LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDSUNDEEP DHAWAN & ORS01/03/2023
CC006000000364556LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDLALCHAND JEWELLERS PRIVATE LIMITED01/03/2023
CC006000000408490LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDVijay Arjundas Gurwada and Rita Vijay Gurwada18/12/2023
CC006000000408497LOKHANDWALA KATARIA CONSTRUCTIONS PRIVATE LIMITEDRita Vijay Gurwada and Vijay Arjundas Gurwada18/12/2023
CC006000000375273ashish agarwallokhandwala kataria constructions pvt ltd14/04/2023
CC006000000396546MADHU BHAGWAN TOLANILokhandwala Kataria Construction Private Limited04/07/2023
CC006000000397229Vandana JainLokhandwala Kataria Constructions Pvt Ltd25/08/2023
CC006000000397289Faisal S RashidLokhandwala Kataria Construction Pvt. Ltd.29/08/2023
CC006000000397548Faisal S RashidLokhandwala Kataria Construction Pvt. Ltd.21/09/2023
CC006000000397398Jinita chetan rakaLokhandwala Kataria Private Limited08/09/2023
CC006000000429328Upasna BajajLokhandwala Kataria Construction Pvt Ltd19/02/2024
CC12400418Lokhandwala Kataria Construction Private LimitedHena Aggarwal15/10/2024
CC12501008Gautam BakhshiLokhandwala Kataria Construction Private Limited23/03/2025
CC12501175amit musaddyLokhandwala Kataria Construction Private Limited08/04/2025
CC12502267RAJESH YOGENDRANATH DUBEYLokhandwala Kataria Construction Private Limited06/07/2025
CC12503066Sunil Ramchand KanalLokhandwala Kataria Construction Private Limited01/09/2025
CC12600163KARISHMA SINGHLokhandwala Kataria Construction Private Limited10/01/2026
CC12600223KARISHMA SINGHLokhandwala Kataria Construction Private Limited13/01/2026
CC12602086Lokhandwala Kataria Construction Private LimitedNIDHI KEJRIWAL AND DHRUV KEJRIWAL09/04/2026
CC12602389Gaurav Suraj DagaLokhandwala Kataria Construction Private Limited23/04/2026
CC12604163Bipin Taro VaziraniLokhandwala Kataria Construction Private Limited03/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jan 2023

Documents filed391

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 391 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate RERA 31 12 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate 31 12 2025 Tower.pdf17 Feb 2026
Withdrawal Update Form 3File: CA Certificate RERA 31 12 2025.pdf17 Feb 2026
Building plan approvalFile: 1st to 9th Page.pdf24 Jan 2026
Building plan approvalFile: 10th to 18th Page.pdf24 Jan 2026
Building plan approvalFile: 19th to 27th Page.pdf24 Jan 2026
Building plan approvalFile: 28th to 36th Page.pdf24 Jan 2026
Building plan approvalFile: 37th to 44 Page.pdf24 Jan 2026
Layout approvalFile: LOI 1-06-21.pdf24 Jan 2026
Form 1File: Architect Certificate RERA 30 09 2025.pdf26 Nov 2025
Form 2File: Engineer certificate 30 09 2025 tower.pdf26 Nov 2025
Form 3File: CA Certificate RERA 30 09 2025.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 2025.pdf26 Nov 2025
Form 5 (FY 2020-2021)File: RERA Form 5 31 03 2021.pdf25 Nov 2025
Form 5 (FY 2019-2020)File: LKCPL RERA Form-5 31 03 2020.pdf25 Nov 2025
Form 5 (FY 2018-2019)File: LKCPL RERA Form-5 31 03 2019.pdf25 Nov 2025
Form 5 (FY 2017-2018)File: RERA form 5 31 03 2018.pdf25 Nov 2025
Form 1File: Architect Certificate RERA May 2021.pdf24 Nov 2025
Form 2File: Engineer certificate May 2021 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA May 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 06 2021.pdf24 Nov 2025
Form 1File: Architect Certificate RERA aug 2021.pdf24 Nov 2025
Form 2File: Engineer certificate aug 2021 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Aug 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 2021.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Nov 2021.pdf24 Nov 2025
Form 2File: Engineer certificate Nov 2021 Tower.pdf24 Nov 2025
Form 3File: CA Certificate RERA Nov 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 12 2021.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Feb 2022.pdf24 Nov 2025
Form 2File: Engineer certificate feb 2022 tower.pdf24 Nov 2025
Form 3File: CA Certificate RERA Feb 2022.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 03 2022.pdf24 Nov 2025
Form 1File: Architect certificate RERA May 2020.pdf24 Nov 2025
Form 2File: Engineer certificate May 2020 Tower.pdf24 Nov 2025
Form 3File: CA certificate RERA May 2020.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 06 2020.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Aug 2020.pdf24 Nov 2025
Form 2File: Engineer certificate Aug 2020 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Aug 2020.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 2020.pdf24 Nov 2025
Form 1File: Architect certificate RERA Nov 2020.pdf24 Nov 2025
Form 2File: Engineer certificate Nov 2020 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Nov 2020.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 12 2020.pdf24 Nov 2025
Form 1File: Architect Certificate RERA feb 2021.pdf24 Nov 2025
Form 2File: Engineer certificate feb 2021 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA feb 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 03 2021.pdf24 Nov 2025
Form 1File: Architect Certificate RERA May 2019.pdf24 Nov 2025
Form 2File: Engineer certificate May 2019 Tower.pdf24 Nov 2025
Form 3File: CA certificate RERA May 2019.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 06 2019.pdf24 Nov 2025
Form 1File: Architect certificate RERA Aug 2019.pdf24 Nov 2025
Form 2File: Engineer certificate Aug 2019 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Aug 2019.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 2019.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Nov 2019.pdf24 Nov 2025
Form 2File: Engineer certificate Nov 2019 Minerva.pdf24 Nov 2025
Form 3File: CA certificate RERA Nov 2019.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 12 2019.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Feb 2020.pdf24 Nov 2025
Form 2File: Engineer certificate Feb 2020 Tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Feb 2020.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 03 2020.pdf24 Nov 2025
Form 1File: Architect certificate RERA May 2018.pdf24 Nov 2025
Form 2File: Engineer Certificate may 2018 Tower.pdf24 Nov 2025
Form 3File: CA certificate RERA May 2018.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 06 2018.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Aug 2018.pdf24 Nov 2025
Form 2File: Engineer certificate aug 2018 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA aug 2018.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 2018.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Nov 2018.pdf24 Nov 2025
Form 2File: Engineer certificate Nov 2018 Tower.pdf24 Nov 2025
Form 3File: CA certificate RERA nov 2018.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 12 2018.pdf24 Nov 2025
Form 1File: Architect Certificate RERA Feb 2019.pdf24 Nov 2025
Form 2File: Engineer certificate feb 2019 tower.pdf24 Nov 2025
Form 3File: CA certificate RERA Feb 2019.pdf24 Nov 2025

How this compares with Mumbai City

82%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 36 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MINERVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LOWER PAREL780+ in Mumbai City

2 kmMINERVACompleted 19Lapsed / revoked 30Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: Lokhandwala Kataria Construction Private Limited

Lokhandwala Kataria Construction Private Limited has 1 registration on MahaRERA, including MINERVA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if MINERVA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MINERVA?

The registered promoter entity is Lokhandwala Kataria Construction Private Limited, a company as per the filing. Its CIN U45200MH1998PTC117468 and GSTIN 27AAACL5105A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MINERVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MINERVA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MINERVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MINERVA?

The professionals named in the filing: Architect: AMIT THORAT; Engineer: AVINASH DATTATRAY WAGHMARE; Chartered Accountant: HARE K PANDA AND CO; Chartered Accountant: NEHA AMIT AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MINERVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MINERVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MINERVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.