Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
8 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
146 of 815Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

NATHANI HEIGHTS SALE is a Others project by Nathani Parekh Constructions Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900011250 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 669 of the 815 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameNATHANI HEIGHTS SALE
  • TypeOthers
  • Location
    • bellasis Road
    • mumbai central
    • Mumbai City
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900011250
  • ReraGenie IDRG-MH-45718

Builder

  • NameNathani Parekh Constructions Private Limited
  • Entity typeCompany
  • Managing DirectorAbdul Hamid Abdul Majid Nathani
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed67 files

Current status

82%669 of 815 units booked
92.9%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NATHANI HEIGHTS SALENA3737120695815

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

NATHANI HEIGHTS SALE: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,301 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI19101.64
Proposed, not sanctioned19,102 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANDVI,MUMBAI
Estimated costRs 196.40 cr
Cost incurredRs 182.42 cr
Work done92.88%
BuildingWingEstimatedIncurred
NATHANI HEIGHTS SALENARs 188.84 crRs 176.91 cr
-NARs 7.56 crRs 5.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBODH TARI
EngineerZ Z CONSULTANTS
Chartered AccountantUmesh bhat
PartnerRole in project
Nathani Parekh Constructions Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519134Dec 2025 → Dec 2026

Reason as filed by the promoterincrement in FSI and additional construction activities

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate NH 10072026.pdf20 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate NH 13072026.pdf20 Jul 2026
Withdrawal Update Form 3File: MahaRERA Form 03- Nathani Heights Sales 30062026.pdf20 Jul 2026
Withdrawal Update Form 1File: The Designers..pdf16 May 2026
Withdrawal Update Form 2File: Engineers certificate Nathani Heights Q3.pdf16 May 2026
Withdrawal Update Form 3File: Form 3.pdf16 May 2026
Withdrawal Update Form 1File: Architect Certificate Nathani Heights Q3.pdf21 Jan 2026
Withdrawal Update Form 2File: Engineers certificate Nathani Heights Q3.pdf21 Jan 2026
Withdrawal Update Form 3File: MahaRERA Form-03 December 2025- Nathani Heights.pdf21 Jan 2026
Form 2A (FY 2024-2025)File: QAC NHS.pdf18 Jan 2026
Withdrawal Update Form 1File: ARC NHS.pdf27 Dec 2025
Withdrawal Update Form 1File: Nathani Heights Arch Certificate 27 Oct 25.pdf27 Dec 2025
Withdrawal Update Form 2File: ENG NHS.pdf27 Dec 2025
Withdrawal Update Form 2File: Engineers certificate Nathani Heights 03 Nov 25.pdf27 Dec 2025
Withdrawal Update Form 3File: Form-3 Nathani Heights Sale.pdf27 Dec 2025
Withdrawal Update Form 3File: MahaRERA Form 3 Nathani Heights Sales.pdf27 Dec 2025
Form 5 (FY 2024-2025)File: Rera Form-5.pdf30 Sep 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NH-RERA2025.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form-3 Nathani Heights Sale.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NH-RERA ENg.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: NH-RERA2024ENG CERT FOR QLTY.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NH-RERA2025EN CERT FOR QLTY ASS.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Nathani Heights Sales .pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Nathani Heights Sales .pdf5 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Nathani Heights Sales.pdf14 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NATHANI HEIGHTS ARC CERTIFICATE.pdf16 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nathani Heights Sale Engineer's Certificate.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nathani Heights Sale Quality Assurance Certificate.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Nathani Heights Sales- Disclosure of Sold Unsold .pdf16 May 2023
Certificates of CA (Form 3)File: RERA Form-3 Nathani Heights.pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5NathaniHeightsSalesFY202021.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5NathaniHeightsSalesFY202122.pdf28 Mar 2023
Layout approvalFile: Layout amendment .pdf19 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout amendment .pdf19 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf19 Jan 2022
Declaration about Commencement CertificateFile: Declartion of CC015.pdf19 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 engineer’s certificate.pdf19 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228403767_For_Asset_Based_Search_19_01_2022_16_22_15_717 4.pdf19 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclosure on Registar Units NH_compressed.pdf19 Jan 2022
Certificates of CA (Form 3)File: CA Certified Form-3.pdf19 Jan 2022
Certificates of CA (Form 5)File: Form V Rera 1920NH 2.pdf19 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Certificate V 1819.pdf19 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form V Rera 1920NH 2.pdf19 Jan 2022
Proforma of Allotment letterFile: Draft allotment sale agreement .pdf19 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NHS-AC_CompressPdf.pdf17 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NHS-EC_CompressPdf.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: NHS-QA_CompressPdf.pdf17 Jan 2022
Disclosure of sold/ booked inventoryFile: NHS-CAC_CompressPdf.pdf17 Jan 2022
Certificates of CA (Form 3)File: NHS-CAC_CompressPdf.pdf17 Jan 2022
Certificates of CA (Form 5)File: Nathani Heights.pdf22 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: cccc.pdf4 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 172 - Nathani Heights Sale (1).pdf4 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi sale.pdf4 Jan 2019
Certificates of CA (Form 3)File: Nathani Heights - Sales (2).pdf4 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: NH.pdf27 Mar 2018
Layout approvalFile: IOD NHS.pdf30 Jul 2017
Building plan approvalFile: IOD NHS.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE NHS.pdf30 Jul 2017
Details of encumbrancesFile: encumbranceNHS.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD NHS.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD NHS.pdf30 Jul 2017
Declaration in FORM BFile: DECLARATION NHS.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT NHS.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER NHS.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA NHS.pdf30 Jul 2017
Proforma of Allotment letterFile: ALOTTMENT NHS.pdf30 Jul 2017
Proforma of Allotment letterFile: AGREEMENT NHS.pdf30 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NATHANI HEIGHTSMUMBAI CENTRAL342OngoingDec 2021Late, Dec 2024
NATHANI RESIDENCYGELL STREET43CompletedDec 2018Late, Dec 2020

How this compares with Mumbai City

82%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATHANI HEIGHTS SALE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near mumbai central780+ in Mumbai City

2 kmNATHANI HEIGHTS SALECompleted 24Lapsed / revoked 34Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 139 registered projects within 2 km.

Builder: Nathani Parekh Constructions Private Limited

Nathani Parekh Constructions Private Limited has 3 registrations on MahaRERA, including NATHANI RESIDENCY and NATHANI HEIGHTS REHAB. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if NATHANI HEIGHTS SALE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATHANI HEIGHTS SALE?

The registered promoter entity is Nathani Parekh Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATHANI HEIGHTS SALE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATHANI HEIGHTS SALE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATHANI HEIGHTS SALE?

The professionals named in the filing: Architect: SUBODH TARI; Engineer: Z Z CONSULTANTS; Chartered Accountant: Umesh bhat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATHANI HEIGHTS SALE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATHANI HEIGHTS SALE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATHANI HEIGHTS SALE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.