SHUBH SHAGUN
RG-MH-34133 · RERA P52100018614 · Last updated on MahaRERA portal: 14 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHUBH SHAGUN is a Residential / Group Housing project by Shubh Housing in Kharadi, 411014, registered with MahaRERA as P52100018614 on 22 Nov 2018. Possession is promised by 30 Dec 2026.
At a glance
Project
- NameSHUBH SHAGUN
- TypeResidential / Group Housing
- Location
- Kharadi
- 411014
- Pincode411014
- RERA no.P52100018614
- ReraGenie IDRG-MH-34133
Builder
- NameShubh Housing
- Entity typePartnership
- GSTIN27ADOFS6881Q1ZS
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSuraj Sumerchand Agarwal, Vishal Sumerchand Agarwal, Rajesh Satyanarayan Mittal, Anuj Balkrishan Agarwal, Jagmohan Satyanarayan Mittal, Sachin Ramkumar Agarwal
- Other registrations9 more →
- Completed2 of 10
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2018
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings5 building records
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 18 | 0 | 0 | 0 | 0 |
| B Wing | NA | 18 | 0 | 0 | 0 | 0 |
| C Wing | NA | 18 | 0 | 0 | 0 | 0 |
| D Wing | NA | 18 | 0 | 0 | 0 | 0 |
| E Wing | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 14 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
53 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed180
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A Wing | 52 | 52 |
| B Wing | 28 | 28 |
| C Wing | 26 | 26 |
| D Wing | 50 | 50 |
| E Wing | 24 | 24 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SHUBH HOUSING | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Mar 2025
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance certificate 2019-20.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance certificate 2020-21.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: quality assurance certificate 2021-22.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance certificate 2022-23.pdf | 14 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 FY 2023-24.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality assurance certificate 2023- 24.pdf | 14 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DocScanner 09-Dec-2024 1-55 pm.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sept23.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dec23.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 mar24.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june24.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sept24.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dec24.pdf | 4 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june23.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 23.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 June 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 23.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Form-3 June 23.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 30-06-23.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 31-12-24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 30-9-24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 30-6-24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 31-3-24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 31-12-23.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shubh Shagun Form 2 30-09-23.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun Sold Unsold 30-6-23.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun Sold Unsold 30-9-23.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun Sold Unsold 31-12-23.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun Sold Unsold 31-3-24 (1).pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun Sold Unsold 30-06-24.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun sold unsold 30-9-24.pdf | 4 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Shubh Shagun sold unsold 31-12-24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: 1shubh shagun form 3 30-6-2021_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 2shubh shagun form 3 30-9-2021_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 3Shubh Shagun form 3 31-12-2021_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 4Shubh Shagun form 3 31-3-2022_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 5Shubh Shagun form 3 30-6-2022_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 6Shubh Shagun form 3 30-9-2022_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 7Shubh Shagun form 3 31 dec 2022_11zon.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: 8Shubh Shagun form 3 31-3-2023_11zon.pdf | 14 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SHUBH SHAGUN.pdf | 29 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shubh Shagun RERA Audit_2020-21.pdf | 18 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shubh Shagun RERA Audit_2021-22.pdf | 18 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Shubh Shagun(Shubh Housing)_2020-2021.pdf | 17 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Shubh Shagun(Shubh Housing)_2021-2022.pdf | 17 Jul 2023 |
| Layout approvalFile: Layout.pdf | 22 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 22 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 22 Nov 2022 |
| Building plan approvalFile: Plan.pdf | 7 Oct 2022 |
| Layout approvalFile: Layout.pdf | 7 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 7 Oct 2022 |
| Building Plan Approval (IOD)File: Plan.pdf | 7 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 23 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (2018-19).pdf | 18 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (2019-20).pdf | 18 Jan 2021 |
| Details of encumbrancesFile: Loan Sanction Letter.pdf | 19 Jun 2020 |
| Layout approvalFile: Revised Layout.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 1.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 2.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 3.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 4.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 5.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 6.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 7.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 8.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 9.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 10.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 11.pdf | 6 Oct 2019 |
| Building plan approvalFile: Revised Plan 12.pdf | 6 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: Revised Layout.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 1.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 2.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 3.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 4.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 5.pdf | 6 Oct 2019 |
| Building Plan Approval (IOD)File: Revised Plan 6.pdf | 6 Oct 2019 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Shubh Tristar Wing-BP52100055763 | Mundhwa, Pune | 9 | Apr 2024 | Ongoing | Dec 2028 | Not due yet |
| Shubh Tristar Wing-AP52100052695 | Mundhwa, Pune | 112 | Sep 2023 | Ongoing | Dec 2027 | Not due yet |
| Atulyam-Inclusive HousingP52100053569 | Mundhwa, Pune | 28 | Nov 2023 | Ongoing | Dec 2027 | Not due yet |
| Shubh Shagun | Sr No 28 4B old Mundhwa road opposite Bollywood square theatre Tukaram nagar Kharadi Pune 411014 | 317 | - | Completed | Dec 2026 | Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHUBH SHAGUN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kharadi
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Shubh Housing
Shubh Housing has 10 registrations on MahaRERA, including SHIV ZEN WORLD - PHASE I and SHUBH SHAGUN. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if SHUBH SHAGUN is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHUBH SHAGUN?
The registered promoter entity is Shubh Housing, a partnership as per the filing. Its GSTIN 27ADOFS6881Q1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHUBH SHAGUN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHUBH SHAGUN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in SHUBH SHAGUN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback