Shubh Tristar Wing-A

By Shubh Housing

RG-MH-74403 · RERA P52100052695 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
27 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

Shubh Tristar Wing-A is a Others project by Shubh Housing in Pune, Maharashtra, registered with MahaRERA as P52100052695 on 22 Sep 2023. Possession is promised by 31 Dec 2027. 85 of the 112 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameShubh Tristar Wing-A
  • TypeOthers
  • Location
    • Opposite Lonkar Madhyamic Vidyalaya
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411014
  • Pincode411014
  • RERA no.P52100052695
  • ReraGenie IDRG-MH-74403

Builder

  • NameShubh Housing
  • Entity typePartnership
  • GSTIN27ADOFS6881Q1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSuraj Sumerchand Agarwal, Vishal Sumerchand Agarwal, Rajesh Satyanarayan Mittal, Anuj Balkrishan Agarwal, Jagmohan Satyanarayan Mittal, Sachin Ramkumar Agarwal
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredSep 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed134 files

Current status

76%85 of 112 units booked
29.8%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WingANA34271048112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

WingA: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed274

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots274
Closed/Covered274

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,457 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI27909.74
Proposed, not sanctioned17,862 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG 01 B, WORLD TRADE CENTER TOWER 1, ICICI BANK LTD, OPP EAON FREE ZONE, KHARADI, PUNE, MAHARASHRA, 411014
Estimated costRs 112.43 cr
Cost incurredRs 33.50 cr
Work done29.79%
BuildingWingEstimatedIncurred
WingANARs 95.57 crRs 28.47 cr
-NARs 16.86 crRs 5.02 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerMUBIN SHAIKH
EngineerSunil Sonawane
Chartered AccountantAGARWAL SARAWGI AND ASSOCIATES
Chartered AccountantPATEL AND SHARMA CHARTERED ACCOUNTANTS
Chartered AccountantDIPALI SHELAR & COMPANY
PartnerRole in project
SHUBH HOUSING-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Tristar Wing A June 26.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Tristar Wing A June 26.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 Tristar Wing A June 26_11zon.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 Tristar A Mar 26.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 Tristar Wing A Mar 26.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Tristar Wing A Mar 26 final _11zon.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 Tristar A Dec 25.pdf26 Mar 2026
Withdrawal Update Form 2File: Form 2 Tristar A Dec 25.pdf26 Mar 2026
Withdrawal Update Form 3File: Form 3 Tristar A Dec 25.pdf26 Mar 2026
Layout approvalFile: 00 Layout Approval - Highlighted.pdf12 Dec 2025
Layout approvalFile: Basement 2 & 3 Plan - Wing A, B, C.pdf12 Dec 2025
Layout approvalFile: Ground Floor & Basement 1 Plan- Wing A, B, C.pdf12 Dec 2025
Layout approvalFile: Podium Floor 1 & 2 Plan.pdf12 Dec 2025
Layout approvalFile: Podium Floor 3 & 4 Plan.pdf12 Dec 2025
Building plan approvalFile: Wing A - Elevation.pdf12 Dec 2025
Building plan approvalFile: Wing A - Floor Plan.pdf12 Dec 2025
Building plan approvalFile: Wing A - Ground Floor & Mezzanine.pdf12 Dec 2025
Withdrawal Update Form 1File: Form-1 Tristar A Sept 25.pdf12 Nov 2025
Withdrawal Update Form 2File: Form-2 Tristar A Sept 25.pdf12 Nov 2025
Withdrawal Update Form 3File: Form-3 Tristar A Sept 25.pdf12 Nov 2025
Form 2A (FY 2024-2025)File: A wing Form 2A.pdf14 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 FY 23-24 - uploaded.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 A wing- Signed.pdf9 Oct 2025
Withdrawal Update Form 1File: Form-1 Wing A june 25.pdf30 Jul 2025
Withdrawal Update Form 2File: Form-2 June 25 wing A.pdf30 Jul 2025
Withdrawal Update Form 3File: Form-3 Tristar Wing-A june 25.pdf30 Jul 2025
Form 1File: sept 23.pdf15 Jul 2025
Form 2File: Form-2-A, 30-09-2023.pdf15 Jul 2025
Form 3File: Form-3 Sept 23.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: A Wing SoldUnsold- 30-09-2023.pdf15 Jul 2025
Form 1File: A wing 31-12-2023.pdf15 Jul 2025
Form 2File: Form-2-A, 31-12-2023.pdf15 Jul 2025
Form 3File: Form-3 Dec 23.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: A Wing Soldunsold 31-12-2023.pdf15 Jul 2025
Form 1File: A wing 31-03-2024.pdf15 Jul 2025
Form 2File: Form-2-A, 31-03-2024.pdf15 Jul 2025
Form 3File: Form-3 Mar 24.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: A Wing SoldUnsold- 31-03-2024.pdf15 Jul 2025
Form 1File: A wing 30-06-2024.pdf15 Jul 2025
Form 2File: Form-2-A, 30-06-2024.pdf15 Jul 2025
Form 3File: Form-3 June 24.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: A Wing SoldUnsold- 30-06-2024.pdf15 Jul 2025
Form 1File: A wing 30-09-2024.pdf15 Jul 2025
Form 2File: Form-2-A, 30-09-2024.pdf15 Jul 2025
Form 3File: Shubh Tristar Wing A.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: A Wing SoldUnsold- 30-09-2024.pdf15 Jul 2025
Form 1File: Form1 Shubh Tristar.pdf15 Jul 2025
Form 2File: Form2 Shubh Tristar Wing-A.pdf15 Jul 2025
Form 3File: Form3 Shubh Tristar Wing-A.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold A wing Tristar.pdf15 Jul 2025
Form 1File: Architect certificate Tristar.pdf15 Jul 2025
Form 2File: Engineer's certificate wing-A.pdf15 Jul 2025
Form 3File: CA certificate Tristar Wing-A.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Tristar Wing-A booked inventory.pdf15 Jul 2025
Withdrawal Update Form 1File: Architect certificate Tristar.pdf7 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s certificate wing-A.pdf7 Jul 2025
Withdrawal Update Form 3File: CA certificate Tristar Wing-A.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Tristar.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Tristar Wing-A.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate wing-A.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Tristar Wing-A booked inventory.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Account change (1) (1).pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Shubh Tristar.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Shubh Tristar Wing-A.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Shubh Tristar Wing-A.pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold A wing Tristar.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A wing 31-03-2024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A wing 30-06-2024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A wing 30-09-2024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A wing 31-12-2023.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-A, 30-06-2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-A, 30-09-2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-A, 31-03-2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-A, 31-12-2023.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-A, 30-09-2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: A Wing SoldUnsold- 30-09-2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: A Wing Soldunsold 31-12-2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: A Wing SoldUnsold- 31-03-2024.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: A Wing SoldUnsold- 30-06-2024.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: A Wing SoldUnsold- 30-09-2024.pdf16 Dec 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shubh Tristar Wing-BP52100055763Mundhwa, Pune9Apr 2024OngoingDec 2028Not due yet
Atulyam-Inclusive HousingP52100053569Mundhwa, Pune28Nov 2023OngoingDec 2027Not due yet
Shubh ShagunSr No 28 4B old Mundhwa road opposite Bollywood square theatre Tukaram nagar Kharadi Pune 411014317-CompletedDec 2026Mar 2022

How this compares with Pune

76%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shubh Tristar Wing-A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

Builder: Shubh Housing

Shubh Housing has 10 registrations on MahaRERA, including SHIV ZEN WORLD - PHASE I and SHUBH SHAGUN. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shubh Tristar Wing-A is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubh Tristar Wing-A?

The registered promoter entity is Shubh Housing, a partnership as per the filing. Its GSTIN 27ADOFS6881Q1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubh Tristar Wing-A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shubh Tristar Wing-A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubh Tristar Wing-A?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: MUBIN SHAIKH; Engineer: Sunil Sonawane; Chartered Accountant: AGARWAL SARAWGI AND ASSOCIATES; Chartered Accountant: PATEL AND SHARMA CHARTERED ACCOUNTANTS; Chartered Accountant: DIPALI SHELAR & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubh Tristar Wing-A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubh Tristar Wing-A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubh Tristar Wing-A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.