Home / Browse projects / Pune, Maharashtra / SAMRUDDHI SUYOG

Registered No litigation declared Residential / Group Housing project

SAMRUDDHI SUYOG

By SAMRUDDHEE CONSTRUCTIONS

RG-MH-64443 · RERA PR1260002500638 · Last updated on MahaRERA portal: 26 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
2 of 8Construction stages donefurthest along: Slabs of Super Structure, 70%
10 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 17 documents Report an error

SAMRUDDHI SUYOG is a Residential / Group Housing project by SAMRUDDHEE CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as PR1260002500638 on 25 Aug 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 7 of the 17 units on this registration are recorded sold or booked, and 2 of 8 construction stages are filed complete.

At a glance

Project

  • NameSAMRUDDHI SUYOG
  • TypeResidential / Group Housing
  • Location
    • AJMERA ROAD
    • PIMPRI WAGHERE
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002500638
  • ReraGenie IDRG-MH-64443

Builder

  • NameSAMRUDDHEE CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27AEOFS6369A1ZO
  • Authorized Signatory PartnerPRATIK PRASHANT KHULE
  • Authorized PartnerADESH NILKANTH LONDHE
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2025First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2025
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed17 files

Current status

41%7 of 17 units booked
37.6%Work done, per cost certificate

Figures as on 26 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA6517017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 8 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

BUILDING 1: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Stilt / Ground30

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area558 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
SUYOG CO OPERATIVE HOUSING SOCIETY LTDPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI1358.35
Proposed, not sanctioned1,358 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI CHINCHWAD LINK ROAD CHINCHWAD GAON PUNE MAHARASHTRA 411033
Estimated costRs 5.40 cr
Cost incurredRs 2.03 cr
Work done37.65%
BuildingWingEstimatedIncurred
BUILDING 1NARs 5.00 crRs 2.03 cr
-NARs 40.00 lakhRs 50,000

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshok Pawar
EngineerKIRAN SHISODE
EngineerKISHOR GHODKE
EngineerDHANANJAY DESHMUKH
Chartered AccountantVINIT D Achha
Chartered AccountantPankaj Surana AND Co
PartnerRole in project
SAMRUDDHEE CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1260002500638/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed17

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A 2025-2026.pdf26 Aug 2026
Form 5 (FY 2025-2026)File: Form 5.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jul 2026
Withdrawal Update Form 1File: Rera Form 1 Arch Certificate Samruddhi Suyog-31032026_compressed.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Samruddhi Suyog Form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: Samruddhi Suyog Eng Certificate Rera Form -2_11zon.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 Suyog Dec 2025_11zon.pdf16 Jan 2026
Withdrawal Update Form 1File: Form-1.pdf17 Oct 2025
Withdrawal Update Form 2File: Form-2.pdf17 Oct 2025
Withdrawal Update Form 3File: form 3.pdf17 Oct 2025
Layout approvalFile: suyog Plan 1.pdf4 Aug 2025
Building plan approvalFile: suyog Plan 2.pdf4 Aug 2025
Declaration and undertaking (Annexure A)File: Order No 50.pdf4 Aug 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITEDP52100050177PIMPRI WAGHERE, Pune35Mar 2023OngoingDec 2025Registered original: May 2025Not delivered

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMRUDDHI SUYOG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPRI WAGHERE13,700+ in Pune

2 kmSAMRUDDHI SUYOGCompleted 39Lapsed / revoked 20Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: SAMRUDDHEE CONSTRUCTIONS

SAMRUDDHEE CONSTRUCTIONS has 3 registrations on MahaRERA, including SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITED and SAMRUDDHI SUYOG. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAMRUDDHI SUYOG is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMRUDDHI SUYOG?

The registered promoter entity is SAMRUDDHEE CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27AEOFS6369A1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMRUDDHI SUYOG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMRUDDHI SUYOG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMRUDDHI SUYOG?

The professionals named in the filing: Architect: Ashok Pawar; Engineer: KIRAN SHISODE; Engineer: KISHOR GHODKE; Engineer: DHANANJAY DESHMUKH; Chartered Accountant: VINIT D Achha; Chartered Accountant: Pankaj Surana AND Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMRUDDHI SUYOG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRUDDHI SUYOG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRUDDHI SUYOG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.