Samraat Nucleus - Project 01

By M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

RG-MH-00792 · RERA P51600001208 · Last updated on MahaRERA portal: 23 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
39 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

Samraat Nucleus - Project 01 is a Others project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600001208 on 27 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.

At a glance

Project

  • NameSamraat Nucleus - Project 01
  • TypeOthers
  • Location
    • Bhabha Nagar Road
    • Bhabha Nagar
    • Nashik
    • 422011
  • Pincode422011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600001208
  • ReraGenie IDRG-MH-00792

Builder

  • NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
  • Entity typeCompany
  • CINU55100MH2005PTC155493
  • GSTIN27AAJCS4306F1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSujoy Jayant Gupta
  • DirectorSUDHIR CHANDRAKANT METKAR
  • Other registrations14 more →
  • Completed8 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredJul 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings4 building records
  • Documents filed144 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A -WING ANA140000
BUILDING A - WING BNA140000
BUILDING A- WING CNA140000
BUILDING CNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 23 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A -WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A - WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A- WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed268

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots268
Closed/Covered214
Open Space54
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A -WING A39948
BUILDING A - WING B153348
BUILDING A- WING C361248
BUILDING C1240124

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,235 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14397.74
Proposed, not sanctioned14,398 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai Plaza Nashik-Pune Highway Near Bitco College Nashik Road Nashik

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Soyuz Talib
ArchitectAr Tapasya Hemant Bendale
EngineerSudhir Metkar
EngineerSTRUDCOM
Chartered AccountantBCS AND ASSOCIATES LLP
Chartered AccountantKALE & ASSOCITES
PartnerRole in project
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2021

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate.pdf23 May 2023
Proforma of Agreement for saleFile: 1 Proforma of AFS.pdf23 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nuc 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Form 1_ Nucleus 01.pdf20 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part1.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part2.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part3.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part4.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part5.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part6.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part7.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part7.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part8.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part9.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part10.pdf25 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEED OF DECLARATION - NUCLEUS_compressed_Part11.pdf25 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nucleus 1.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nucleus 1.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3 - Nucleus Project 1 062020.pdf3 Mar 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION CERTIFICATE SAMRAAT NUCLEUS.pdf18 Feb 2021
Building plan approvalFile: SHEET 1_compressed.pdf16 Feb 2021
Building plan approvalFile: SHEET 2.pdf16 Feb 2021
Building plan approvalFile: SHEET 3.pdf16 Feb 2021
Building plan approvalFile: SHEET 4.pdf16 Feb 2021
Building plan approvalFile: SHEET 5.pdf16 Feb 2021
Building Plan Approval (IOD)File: SHEET 1_compressed.pdf16 Feb 2021
Building Plan Approval (IOD)File: SHEET 2.pdf16 Feb 2021
Building Plan Approval (IOD)File: SHEET 3.pdf16 Feb 2021
Building Plan Approval (IOD)File: SHEET 4.pdf16 Feb 2021
Building Plan Approval (IOD)File: SHEET 5.pdf16 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NUCLEUS PART COMPLETION COMMERCIAL.pdf16 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nucleus project_01.pdf30 Jan 2021
Certificates of CA (Form 3)File: NUCLEUS PROJECT 1.pdf8 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NUCLEUS PROJECT 1.pdf8 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nucleus Project01 1 Engineers Cert_ Form 2_compressed.pdf12 Oct 2020
Certificates of CA (Form 3)File: Form 3 - Nucleus Project 1 032020_compressed.pdf1 Oct 2020
Certificates of CA (Form 3)File: Form 3 - Nucleus Project 1 Dec 2019.pdf9 Jul 2020
Certificates of CA (Form 3)File: Form 3 - Nucleus Project 1 Sept 2019.pdf9 May 2020
Certificates of CA (Form 3)File: Form 3 - Nucleus Project 1 June 2019.pdf16 Jan 2020
Certificates of Architect (Form 4)File: Form 4 Architect Certificate Nucleus 01 Bldg C.pdf21 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nucleus Eng RERA Certificate Project 1 Mar19.pdf3 Oct 2019
Certificates of CA (Form 5)File: Nucleus P-I.pdf30 Sep 2019
Certificates of CA (Form 3)File: FORM 3 NUCLEUS PROJECT 1.pdf17 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement for Commercial Wing D _ E_290519.pdf16 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nucleus RERA Certificate Project-1 30062019.pdf16 Jul 2019
OtherFile: NUCLEUS FIRE FINAL NOC( Building A )300719.pdf8 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate _60719.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part1.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part2.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part3.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part4.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part5.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part6.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part7.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part8.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part9.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part10.pdf6 Jul 2019
Status of ConveyanceFile: DEED OF DECLARATION - NUCLEUS_compressed_Part11.pdf6 Jul 2019
Building plan approvalFile: Sheet no1_290519.pdf5 Jun 2019
Building plan approvalFile: Sheet no2_290519.pdf5 Jun 2019
Building plan approvalFile: Sheet no 3 290519.PDF5 Jun 2019
Building plan approvalFile: Sheet no4_290519.pdf5 Jun 2019
Building plan approvalFile: Sheet no5_290519.pdf5 Jun 2019
Building Plan Approval (IOD)File: Sheet no1_290519.pdf5 Jun 2019
Building Plan Approval (IOD)File: Sheet no2_290519.pdf5 Jun 2019
Building Plan Approval (IOD)File: Sheet no 3 290519.PDF5 Jun 2019
Building Plan Approval (IOD)File: Sheet no4_290519.pdf5 Jun 2019
Building Plan Approval (IOD)File: Sheet no5_290519.pdf5 Jun 2019
Building plan approvalFile: Sheet 01.pdf21 Feb 2019
Building plan approvalFile: Sheet 02.pdf21 Feb 2019
Building plan approvalFile: Sheet 03.PDF21 Feb 2019
Building plan approvalFile: Sheet 04.PDF21 Feb 2019
Building plan approvalFile: Part ComplComm Nucleus 04022019.pdf21 Feb 2019
Building Plan Approval (IOD)File: Sheet 01.pdf21 Feb 2019
Building Plan Approval (IOD)File: Sheet 02.pdf21 Feb 2019
Building Plan Approval (IOD)File: Sheet 03.PDF21 Feb 2019
Building Plan Approval (IOD)File: Sheet 04.PDF21 Feb 2019
Building Plan Approval (IOD)File: Part ComplComm Nucleus 04022019.pdf21 Feb 2019
Certificates of CA (Form 3)File: Form 3 - Samraat Nucleus 092018.pdf2 Jan 2019
Building plan approvalFile: Nucleus Rev Approval 101218 sheet1.pdf19 Dec 2018

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise11 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Samraat Apna Ghar Phase-IIP51600020657Someshwar Satpur Link Road Near DJ Reva Meadows, Nashik-Apr 2019CompletedDec 2023Late, Jan 2025
Samraat Apna Ghar Phase-IP51600020299Someshwar -Satpur link Road near DJ Reva Meadows, Nashik-Apr 2019CompletedJun 2023Nov 2022
Samraat Symphony Project 02IndiraNagar Nashik Maharashtra28-CompletedDec 2019Mar 2019
Samraat Gokuldham Project 01Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra241-CompletedDec 2019Oct 2018
Samraat VrindavanOm Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003240-CompletedMar 2017Late, Jun 2017
SignatureSerene Meadows Gangapur Road Anandwali Nashik 42201360-CompletedDec 2016Late, Jun 2017
Samraat Symphony Project 03NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009112-CompletedDec 2016Late, Jul 2017
Samraat Symphony Project 01Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 42200984-CompletedDec 2016Late, Jul 2017
Samraat Tropicano 01Serene Meadows Gangapur Road Anandwali Nashik 422013460-CompletedOct 2016Late, Jul 2017
Dream GrandeurMatoshri Nagar Tidke Colony Nashik 42200216-CompletedJun 2012Late, Nov 2012
Dream NestNear Ryan International School Old Wadala Road Nashik 422006104-CompletedMar 2012Late, May 2012
Dream VillaasGanesh baba Nagar Nashik-Pune Highway Nashik 42201156-CompletedDec 2011Late, Mar 2012
Dream CastleMadhuban Colony Makhamalabad Road Panchavati Nashik 422003106-CompletedDec 2010Late, Apr 2011
Dream FlowerNashik-Pune Highway Opposite Inox MultiPlex Nashik 42200694-CompletedNov 2010Late, Mar 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samraat Nucleus - Project 01 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhabha Nagar4,100+ in Nashik

2 kmSamraat Nucleus - ProjecCompleted 180Lapsed / revoked 48Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 338 registered projects within 2 km.

Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Samraat Nucleus - Project 01 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samraat Nucleus - Project 01?

The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samraat Nucleus - Project 01?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samraat Nucleus - Project 01?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samraat Nucleus - Project 01?

The professionals named in the filing: Architect: Ar Soyuz Talib; Architect: Ar Tapasya Hemant Bendale; Engineer: Sudhir Metkar; Engineer: STRUDCOM; Chartered Accountant: BCS AND ASSOCIATES LLP; Chartered Accountant: KALE & ASSOCITES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samraat Nucleus - Project 01?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samraat Nucleus - Project 01. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samraat Nucleus - Project 01 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.