Home / Browse projects / Nashik, Maharashtra / Samraat Apna Ghar Phase-II

Completed No litigation declared Others project

Samraat Apna Ghar Phase-II

By M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

RG-MH-93340 · RERA P51600020657 · Last updated on MahaRERA portal: 7 May 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
100 of 121Construction stages doneacross 11 buildings; furthest along: Internal walls, 32%
0Complaints at MahaRERAon this registration
Jump to the 232 documents Report an error

Samraat Apna Ghar Phase-II is a Others project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600020657 on 30 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSamraat Apna Ghar Phase-II
  • TypeOthers
  • Location
    • Canal Road
    • Someshwar Satpur Link Road Near DJ Reva Meadows
    • Satpur
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600020657
  • ReraGenie IDRG-MH-93340

Builder

  • NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
  • Entity typeCompany
  • CINU55100MH2005PTC155493
  • GSTIN27AAJCS4306F1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSujoy Jayant Gupta
  • DirectorSUDHIR CHANDRAKANT METKAR
  • Other registrations14 more →
  • Completed8 of 15
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredApr 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Apr 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings11 building records
  • Documents filed232 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building F - Wing F1NA90000
Building F - Wing F2NA90000
Building G - Wing G1NA90000
Building G -Wing G2NA90000
Building G - Wing G3NA90000
Building G- Wing G4NA90000
Building H -Wing H1NA90000
Building H - Wing H2NA90000
Building H - Wing H3NA90000
Building H - Wing H4NA90000
Building H - Wing H5NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

100 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Internal walls, at 32%.

Building F - Wing F191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building F - Wing F291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building G - Wing G191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building G -Wing G291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building G - Wing G391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building G- Wing G491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building H -Wing H150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building H - Wing H250%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.2%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building H - Wing H391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building H - Wing H491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building H - Wing H591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes60%
Open ParkingNoNot applicable

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered149
BuildingClosed/CoveredTotal
Building F - Wing F12222
Building F - Wing F22222
Building G - Wing G11818
Building G -Wing G288
Building G - Wing G388
Building G- Wing G41818
Building H -Wing H11818
Building H - Wing H288
Building H - Wing H388
Building H - Wing H411
Building H - Wing H51818

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,370 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI25925.0
Proposed, not sanctioned16,390 sq m
Buildings approved11
Buildings sanctioned11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIcici Bank Ltd Plot No 7 Satpur Midc Area, Trimbak Road Satpur Nasik - 422007, Maharashtra

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr.Sumit Kumath
EngineerMr Sudhir Metkar
EngineerMr Jayant Inamdar
EngineerMr VIkram ENdait
EngineerMr Anil Wagh
Chartered AccountantA K Chordia and Associates
PartnerRole in project
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600018217Dec 2023 → Dec 2024

Reason as filed by the promoterWe here by applying for Extension of our RERA registered Project- Samraat Apna Ghar Phase II vide its RERA Registration No. P51600020657 dated 18/05/2020, said project constructed on Survey No. 50/2 area admeasuring 24,500 square meters, having CTS No. 2383/1 & Survey No. 48/2/A area admeasuring 5,100 square meters situate at Gangapur, Taluka Nashik, District Nashik. We here by writing to you a detailed explanation regarding the delays encountered in the completion of the registered project bearing vide Registration No. P51600020657. We here by clears that we have already completed Buildings F

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2025

Documents filed232

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 232 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: FORM IV APNA GHAR PHASE II.pdf7 May 2025
Other - TechnicalFile: RERA form IIA APG-II.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form II Apna ghar ph II march .pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form II Apna ghar ph II June.pdf15 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form II Apna ghar ph II Sep .pdf15 Mar 2025
Disclosure of sold/ booked inventoryFile: APG PII QIV 2324.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: APG PII QI 2425.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: APG PII QII 2425.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: APG PII QIII 2425.pdf12 Mar 2025
Certificates of CA (Form 3)File: APNA GHAR PHASE II FORM III QIII.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Apna Ghar Phase II FORM II QIII.pdf28 Feb 2025
Certificates of CA (Form 3)File: PHASE II - FORM III.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM ONE PHASE II.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM ONE PHASE II.pdf23 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM FOUR APNA GHAR PHASE II.pdf23 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC WING H1 AND H2.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf7 Jan 2025
Certificates of CA (Form 3)File: FORM 3 PHASE II.pdf6 Jan 2025
Certificates of CA (Form 3)File: FORM 3 AG II.pdf30 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form One Apna Ghar Phase Two.pdf5 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM ONE PHASE TWO QUARTER FOUR.pdf3 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM TWO FOR APNA GHAR TWO QUARTER THREE.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM TWO A AG PHASE II.pdf27 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERT.pdf29 Feb 2024
Declaration in FORM BFile: Affidavit cum undertaking.pdf12 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Apna Ghar Phase II Q2.pdf6 Feb 2024
Certificates of CA (Form 3)File: Form-III Apna Ghar II Q3.pdf3 Feb 2024
Details of encumbrancesFile: INDEX II OF RECONVENCE OF TATA CAPITAL.pdf20 Jan 2024
Details of encumbrancesFile: Index II ICICI Mortgage Deed.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Commencement Certificate.pdf16 Jan 2024
Declaration about Commencement CertificateFile: Declaration for commencement year-2021.pdf16 Jan 2024
Declaration about Commencement CertificateFile: Declaration for coemmencment year-2023.pdf16 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 APG PH II Jan 2024.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5- FY-2021-22.pdf28 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY-2022-23.pdf28 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion Application H1 and H2 wing.pdf28 Dec 2023
Form 2AFile: APG-II RERA form 2A -1 .pdf26 Dec 2023
Form 2AFile: APG-II RERA form 2A -2.pdf26 Dec 2023
Form 2AFile: APG-II RERA form 2A -3.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Inventories Apna Ghar Phase II.pdf26 Dec 2023
Certificates of CA (Form 3)File: Form III Apna GHAR II Q2.pdf26 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Self Declaration for Part Completion Certificate.pdf23 Dec 2023
Copy of the legal title reportFile: TITLE REPORT DATED 10-11-2023.pdf6 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - SAMRAAT APNA GHAR PHASE II- Q1 2023-24.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: INVENTORY -APNA GHAR -Q1-2023-24.pdf11 Oct 2023
Certificates of CA (Form 3)File: CA Certificate Q1 23-24 Apna Ghar II_ Form 3.pdf11 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 APN Oct 2023.pdf2 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory-APN- 2022-23- Q4.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Apna Ghar II - Q1 2023-24.pdf6 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Apna Ghar II Q1 2324.pdf6 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised Form 2 Apna Ghar II Q4 2223.pdf30 Jun 2023
Certificates of CA (Form 3)File: Form 3 Apna Ghar II Q4 2223.pdf26 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 13 Form 2A.pdf17 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: APG-II -RERA form 2A certificate- 17.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 APG II March 2023.pdf13 Jun 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement For Sale.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest by Directors 31012023.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 APG PH II.pdf10 Apr 2023
Form 2AFile: APG-II -RERA form 2A certificate- 17.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Cert Apna Ghar Phase II Dec 2022.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: Nuc Q1 2223.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: APG II Q1 2223.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: APG II Q2 2223.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: APG II Q3 2223.pdf3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Cert Apna Ghar Phase II Dec 2022.pdf2 Mar 2023
Disclosure of sold/ booked inventoryFile: Apna Ghar 2 Q4 2122.pdf2 Mar 2023
Certificates of CA (Form 3)File: Apna Ghar 2 Q1 2223.pdf2 Mar 2023
Certificates of CA (Form 3)File: Apna Ghar 2 Q2 2223.pdf2 Mar 2023
Certificates of CA (Form 3)File: Apna Ghar II Q3 2223.pdf2 Mar 2023
Certificates of CA (Form 3)File: CA Certificate Apna Ghar II Q4.pdf23 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: APG PH II FORM 2 Oct 2022.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: APG PH II Form 1.pdf10 Jan 2023
Form 2AFile: APG-II RERA FORM 2A-16.pdf5 Jan 2023
Form 2AFile: APG-II Form 2A Certificate -15.pdf18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Arch Cert APG Phase II Sep2022.pdf7 Oct 2022
Building plan approvalFile: Sheet-01.pdf20 Sep 2022
Building plan approvalFile: Sheet-02.pdf20 Sep 2022
Building plan approvalFile: Sheet-03.pdf20 Sep 2022
Building plan approvalFile: Sheet-04.pdf20 Sep 2022
Building plan approvalFile: Sheet-05.pdf20 Sep 2022

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise10 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Samraat Apna Ghar Phase-IP51600020299Someshwar -Satpur link Road near DJ Reva Meadows, Nashik-Apr 2019CompletedJun 2023Nov 2022
Samraat Symphony Project 02IndiraNagar Nashik Maharashtra28-CompletedDec 2019Mar 2019
Samraat Gokuldham Project 01Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra241-CompletedDec 2019Oct 2018
Samraat VrindavanOm Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003240-CompletedMar 2017Late, Jun 2017
SignatureSerene Meadows Gangapur Road Anandwali Nashik 42201360-CompletedDec 2016Late, Jun 2017
Samraat Symphony Project 03NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009112-CompletedDec 2016Late, Jul 2017
Samraat Symphony Project 01Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 42200984-CompletedDec 2016Late, Jul 2017
Samraat Tropicano 01Serene Meadows Gangapur Road Anandwali Nashik 422013460-CompletedOct 2016Late, Jul 2017
Dream GrandeurMatoshri Nagar Tidke Colony Nashik 42200216-CompletedJun 2012Late, Nov 2012
Dream NestNear Ryan International School Old Wadala Road Nashik 422006104-CompletedMar 2012Late, May 2012
Dream VillaasGanesh baba Nagar Nashik-Pune Highway Nashik 42201156-CompletedDec 2011Late, Mar 2012
Dream CastleMadhuban Colony Makhamalabad Road Panchavati Nashik 422003106-CompletedDec 2010Late, Apr 2011
Dream FlowerNashik-Pune Highway Opposite Inox MultiPlex Nashik 42200694-CompletedNov 2010Late, Mar 2011

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samraat Apna Ghar Phase-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Someshwar Satpur Link Road Near DJ Reva Meadows4,100+ in Nashik

2 kmSamraat Apna Ghar Phase-Completed 42Lapsed / revoked 10Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Samraat Apna Ghar Phase-II is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samraat Apna Ghar Phase-II?

The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samraat Apna Ghar Phase-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samraat Apna Ghar Phase-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samraat Apna Ghar Phase-II?

The professionals named in the filing: Architect: Ar.Sumit Kumath; Engineer: Mr Sudhir Metkar; Engineer: Mr Jayant Inamdar; Engineer: Mr VIkram ENdait; Engineer: Mr Anil Wagh; Chartered Accountant: A K Chordia and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samraat Apna Ghar Phase-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samraat Apna Ghar Phase-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samraat Apna Ghar Phase-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.