Home / Browse projects / Nashik, Maharashtra / Samraat Apna Ghar Phase-III
Samraat Apna Ghar Phase-III
By M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
RG-MH-13975 · RERA P51600029928 · Last updated on MahaRERA portal: 10 Jan 2024
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 28 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samraat Apna Ghar Phase-III is a Others project by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600029928 on 15 Jul 2021. Possession was promised by 30 Jun 2024 and is now 28 months past that date.
At a glance
Project
- NameSamraat Apna Ghar Phase-III
- TypeOthers
- Location
- Canal Road
- Satpur Link Road
- Nashik
- 422013
- Pincode422013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600029928
- ReraGenie IDRG-MH-13975
Builder
- NameM/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
- Entity typeCompany
- CINU55100MH2005PTC155493
- GSTIN27AAJCS4306F1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorSujoy Jayant Gupta
- DirectorSUDHIR CHANDRAKANT METKAR
- Other registrations14 more →
- Completed8 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on15 Jul 2021
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings22 building records
- Documents filed111 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| I-1 | NA | 9 | 0 | 0 | 0 | 0 |
| I-2 | NA | 9 | 0 | 0 | 0 | 0 |
| I-3 | NA | 9 | 0 | 0 | 0 | 0 |
| I-4 | NA | 9 | 0 | 0 | 0 | 0 |
| I-5 | NA | 9 | 0 | 0 | 0 | 0 |
| J-1 | NA | 9 | 0 | 0 | 0 | 0 |
| J-2 | NA | 9 | 0 | 0 | 0 | 0 |
| J-3 | NA | 9 | 0 | 0 | 0 | 0 |
| J-4 | NA | 9 | 0 | 0 | 0 | 0 |
| J-5 | NA | 9 | 0 | 0 | 0 | 0 |
| K-1 | NA | 9 | 0 | 0 | 0 | 0 |
| K-2 | NA | 9 | 0 | 0 | 0 | 0 |
| K-3 | NA | 9 | 0 | 0 | 0 | 0 |
| K-4 | NA | 9 | 0 | 0 | 0 | 0 |
| K-5 | NA | 9 | 0 | 0 | 0 | 0 |
| L-1 | NA | 9 | 0 | 0 | 0 | 0 |
| L-2 | NA | 9 | 0 | 0 | 0 | 0 |
| L-3 | NA | 9 | 0 | 0 | 0 | 0 |
| L-4 | NA | 9 | 0 | 0 | 0 | 0 |
| L-5 | NA | 9 | 0 | 0 | 0 | 0 |
| L-6 | NA | 9 | 0 | 0 | 0 | 0 |
| F3 | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 10 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 22 buildings; the table lists the first 20.
34 of 242 construction stages are filed complete across 22 buildings. The stage furthest along is Basement (if any), at 90%.
I-125%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
I-227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
I-345%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 18% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
I-446%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 18% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
I-545%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
J-127%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
J-227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
J-340%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
J-440%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
J-540%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
K-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
K-20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
K-30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
K-40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
K-50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | Yes | 0% |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| I-1 | 1 | 1 |
| I-2 | 1 | 1 |
| I-3 | 1 | 1 |
| I-4 | 1 | 1 |
| I-5 | 1 | 1 |
| J-1 | 1 | 1 |
| J-2 | 1 | 1 |
| J-3 | 1 | 1 |
| J-4 | 1 | 1 |
| J-5 | 1 | 1 |
| K-1 | 1 | 1 |
| K-2 | 1 | 1 |
| K-3 | 1 | 1 |
| K-4 | 1 | 1 |
| K-5 | 1 | 1 |
| L-1 | 1 | 1 |
| L-2 | 1 | 1 |
| L-3 | 1 | 1 |
| L-4 | 1 | 1 |
| L-5 | 1 | 1 |
| L-6 | 1 | 1 |
| F3 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar.Sumit Kumath |
| Engineer | Mr Sudhir Metkar |
| Engineer | Mr Jayant Inamdar |
| Engineer | Mr VIkram ENdait |
| Engineer | Mr Anil Wagh |
| Chartered Accountant | KALE AND ASSOCIATES |
| Chartered Accountant | BCS AND ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 FY-2021-22 Samraat Apna Ghar Phase III.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APG PH III Jan 2024.pdf | 9 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-2022-23 Samraat Apna Ghar Phase III.pdf | 5 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certifcate Apna Ghar Phase III Q4-2022-23.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certifcate Apna Ghar Phase III Q1-2023-24.pdf | 5 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certifcate Apna Ghar Phase III Q2-2023-24.pdf | 5 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 APN Ph III July 2023.pdf | 4 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 APN Ph III Oct 2023.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Q1-FY-2022-23.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q-2-FY-2022-23.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q3-FY-2022-23.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q4-2022-23.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q1-2023-24.pdf | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-2023-24.pdf | 4 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest by Directors 31012023.pdf | 26 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 APG PH III Mar2023.pdf | 10 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: APG-III-RERA form 2A certificate- 08.pdf | 5 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q2 2122.pdf | 20 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q3 2122.pdf | 20 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q4 2122.pdf | 20 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q1 2223.pdf | 20 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q2 2223.pdf | 20 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: APG III Q3 2223.pdf | 20 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q2 2122.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q3 2122.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q4 2122.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q1 2223.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q2 2223.pdf | 17 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate AG3 Q3 2223.pdf | 17 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engr Cert Apna Ghar Phase III Dec 2022.pdf | 2 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: APG PH III FORM 2 Oct 2022.pdf | 11 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APG-III RERA FORM 1.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: APG-III- RERA form 2A -5.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: APG-III Form 2A Certificate -6.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: APG-III RERA FORM 2A-7.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA- from 2A- APG-III -2.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Apna Ghar Phase III_compressed.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: APG-III RERA form 2A -4.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: APG-III RERA form 2A -4.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: APG-III Form 2A Certificate -6.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert APG PH 3 Sep2022.pdf | 7 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apna ghar ph-3 June 22.pdf | 30 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Cert 04072022_APG Ph III.pdf | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: APG-III- RERA form 2A -5.pdf | 30 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apna ghar ph 3 Sept 21.pdf | 22 Apr 2022 |
| Details of encumbrancesFile: APNA GHAR UNCUMB.pdf | 18 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apna ghar phase 3 Mar 22.pdf | 11 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch's Cert 02042022_APG III.pdf | 7 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: APG-III RERA form 2A -4.pdf | 6 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAMRAAT APNA GHAR FORM 3.pdf | 28 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apna ghar phase 3 DEC 2021.pdf | 27 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Apna Ghar Phase III_compressed.pdf | 10 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Apna Ghar Ph 3_compressed.pdf | 7 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (Format D)Phase III.pdf | 5 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architect certificate_Samraat Apna Ghar Phase-III 2992021.pdf | 4 Oct 2021 |
| Building plan approvalFile: 01_Rev AG S No 50 .pdf | 30 Sep 2021 |
| Building plan approvalFile: 02_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building plan approvalFile: 03_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building plan approvalFile: 04_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building plan approvalFile: 05_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 01_Rev AG S No 50 .pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 03_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 04_Rev AG S No 50.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 05_Rev AG S No 50.pdf | 30 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT Rev AG S No 50 22092021.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA- from 2A- APG-III -2.pdf | 30 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (Format D).pdf | 9 Jul 2021 |
| Layout approvalFile: Apna Ghar CTScompressed.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 1S No 50.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 2.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 3.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 4.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 5.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 6.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 7.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 8.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 9.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 10.pdf | 7 Jul 2021 |
| Building plan approvalFile: Sheet 11.pdf | 7 Jul 2021 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Samraat Apna Ghar Phase-IIP51600020657 | Someshwar Satpur Link Road Near DJ Reva Meadows, Nashik | - | Apr 2019 | Completed | Dec 2023 | Late, Jan 2025 |
| Samraat Apna Ghar Phase-IP51600020299 | Someshwar -Satpur link Road near DJ Reva Meadows, Nashik | - | Apr 2019 | Completed | Jun 2023 | Nov 2022 |
| Samraat Symphony Project 02 | IndiraNagar Nashik Maharashtra | 28 | - | Completed | Dec 2019 | Mar 2019 |
| Samraat Gokuldham Project 01 | Hirawadi Mumbai Agra Highway 422003 Nashik Maharashtra | 241 | - | Completed | Dec 2019 | Oct 2018 |
| Samraat Vrindavan | Om Nagar Opp Swami Narayan temple Mumbai-Agra Highway Nashik 422003 | 240 | - | Completed | Mar 2017 | Late, Jun 2017 |
| Signature | Serene Meadows Gangapur Road Anandwali Nashik 422013 | 60 | - | Completed | Dec 2016 | Late, Jun 2017 |
| Samraat Symphony Project 03 | NAGARE NAGAR BEHIND SEVEN HEAVEN HOTEL MUMBAI-AGRA HIGHWAY Nashik 422009 | 112 | - | Completed | Dec 2016 | Late, Jul 2017 |
| Samraat Symphony Project 01 | Nagare Nagar behind Seven Heaven Hotel MubaiAgra Road Nashik 422009 | 84 | - | Completed | Dec 2016 | Late, Jul 2017 |
| Samraat Tropicano 01 | Serene Meadows Gangapur Road Anandwali Nashik 422013 | 460 | - | Completed | Oct 2016 | Late, Jul 2017 |
| Dream Grandeur | Matoshri Nagar Tidke Colony Nashik 422002 | 16 | - | Completed | Jun 2012 | Late, Nov 2012 |
| Dream Nest | Near Ryan International School Old Wadala Road Nashik 422006 | 104 | - | Completed | Mar 2012 | Late, May 2012 |
| Dream Villaas | Ganesh baba Nagar Nashik-Pune Highway Nashik 422011 | 56 | - | Completed | Dec 2011 | Late, Mar 2012 |
| Dream Castle | Madhuban Colony Makhamalabad Road Panchavati Nashik 422003 | 106 | - | Completed | Dec 2010 | Late, Apr 2011 |
| Dream Flower | Nashik-Pune Highway Opposite Inox MultiPlex Nashik 422006 | 94 | - | Completed | Nov 2010 | Late, Mar 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
Keep Samraat Apna Ghar Phase-III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Satpur Link Road4,100+ in Nashik
Filed coordinates, straight-line distance. 80 registered projects within 2 km.
Samraat AmOzon
M/S Shweta Infrastructure & Housing (I) Pv
ELYSIAN
ROONGTA HOMES LLP
HAPPY LIFE AT APNA GHAR PHASE III
M/S Shweta Infrastructure & Housing (I) Pv
SKY53
SKY53
ROONGTA ROSEWOOD APARTMENT
SHREE TIRUMALA BUILDCON
ROONGTA EMINENCE APARTMENT
SHREE TIRUMALA BUILDCON
See every Nashik project, with the district possession charts
Builder: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.
M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. has 15 registrations on MahaRERA, including Samraat Nucleus - Project 01 and Samraat Gokuldham Project 01. Its filings disclose 14 earlier MahaRERA projects: declares 3 of 14 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that Samraat Apna Ghar Phase-III shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Samraat Apna Ghar Phase-III is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samraat Apna Ghar Phase-III?
The registered promoter entity is M/S Shweta Infrastructure & Housing (I) Pvt. Ltd., a company as per the filing. Its CIN U55100MH2005PTC155493 and GSTIN 27AAJCS4306F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samraat Apna Ghar Phase-III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samraat Apna Ghar Phase-III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samraat Apna Ghar Phase-III?
The professionals named in the filing: Architect: Ar.Sumit Kumath; Engineer: Mr Sudhir Metkar; Engineer: Mr Jayant Inamdar; Engineer: Mr VIkram ENdait; Engineer: Mr Anil Wagh; Chartered Accountant: KALE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samraat Apna Ghar Phase-III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback