Registered No litigation declared Commercial project

SKY53

By SKY53

RG-MH-30863 · RERA P51600079201 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 78%
141 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

SKY53 is a Commercial project by SKY53 in Nashik, Maharashtra, registered with MahaRERA as P51600079201 on 14 Feb 2025. Possession is promised by 30 Jun 2027. 1 of the 142 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSKY53
  • TypeCommercial
  • Location
    • Gangapur road
    • Anandvalli
    • Aanandwali
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600079201
  • ReraGenie IDRG-MH-30863

Builder

  • NameSKY53
  • Entity typePartnership
  • PartnersAakash Anil Jain, Nilesh Deelip Bora

Key dates

this monthRegisteredFeb 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

1%1 of 142 units booked
43.7%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKY53NA11110142142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 78%.

SKY53: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed422

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots422
Closed/Covered422

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,512 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Sep 2025
LandownerVillageDistrict
SKY53AanandwaliNashik
ATHARVA CHS MEMBER RAMESH KASHINATH UPADHYENashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI14701.37
Proposed, not sanctioned14,701 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG-3 Suyojit Trade Center, Opp Rajiv Gandhi Bhavan, Sharanpur road, Nashik-422002
Estimated costRs 36.05 cr
Cost incurredRs 15.74 cr
Work done43.66%
BuildingWingEstimatedIncurred
SKY53NARs 34.10 crRs 14.51 cr
-NARs 1.95 crRs 1.23 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Darshan Sancheti from PDP Architects
ArchitectDarshan Sancheti from pdp
EngineerJW Consultants LLP
EngineerNeel Mutha from Legend Infratech
EngineerHINDURAO SHANTARAM HAMBARE
Chartered AccountantCA Anil Jain from Deshmukh Jain & Associates
Chartered AccountantDESHMUKH JAIN & ASSOCIATES
PartnerRole in project
SKY53-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: SKY53 APPROVED COMMENCEMENT CERTIFICATE.pdf29 Apr 2026
Building plan approvalFile: SKY53 APPROVED DRAWING REVISED.pdf29 Apr 2026
Withdrawal Update Form 1File: form 1 architect certificate signed sky53 mar 2026.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate signed mar2026.pdf29 Apr 2026
Withdrawal Update Form 3File: form 3 CA certificate signed sky53 March 2026 compressed.pdf29 Apr 2026
Form 2A (FY 2025-2026)File: form2A sky53 March-2026.pdf29 Apr 2026
Form 5 (FY 2025-2026)File: form 5 CA Annual certificate signed sky53 March-2026.pdf29 Apr 2026
Withdrawal Update Form 1File: form 1 ARCH CERTIFICATE dec25 sky53.pdf30 Jan 2026
Withdrawal Update Form 2File: form 2 ENGINEERS CERTIFICATE dec25 sky53.pdf30 Jan 2026
Withdrawal Update Form 3File: form3 CA CERTIFICATE dec25 sky53_compressed.pdf30 Jan 2026
Withdrawal Update Form 1File: form 1 architect certificate sky53.pdf14 Oct 2025
Withdrawal Update Form 2File: form2Engineer certificate.pdf14 Oct 2025
Withdrawal Update Form 3File: Form 3 CA certificate sky53.pdf14 Oct 2025
Building plan approvalFile: Revised APPROVED DRAWING sky53.pdf29 Sep 2025
Building plan approvalFile: sky53 APPROVED DRAWING PNo1+2+3+4 53Anandvalli.pdf11 Sep 2025
Form 1File: sky53 Form 1 Architect Certificate June 2025.pdf11 Jul 2025
Form 2File: SKY53 Form 2 Engineer Certificate June 2025.pdf11 Jul 2025
Form 3File: SKY53 FORM 3 CA CERTIFICATE JUNE 25 signed.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold disclosure.pdf11 Jul 2025
Form 1File: FORM 1 ARCHITECTS CERTIFICATE (1).pdf24 May 2025
Form 2File: FORM -2 ENGINEERS CERTIFICATE SKY53 (1).pdf24 May 2025
Form 3File: FORM 3 CA CERTIFICATE (1)_compressed.pdf24 May 2025
Form 2A (FY 2024-2025)File: FORM 2A QUALITY ASSURANCE (1).pdf24 May 2025
Form 5 (FY 2024-2025)File: FORM 5 ANNUAL REPORT ON STATEMENT CA CERTIFICATE (1).pdf24 May 2025
Other - FinanceFile: DECLARATION.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate sky53.pdf1 Jan 2025
CERSAI detailsFile: rku cersai affidavit.pdf1 Jan 2025
Copy of the legal title reportFile: TITLE REPORT SKY 53-A-2-1-4.pdf10 Dec 2024
Details of encumbrances concerned to FinanceFile: MahaRERA - SKY53 - Legal Encumberance report.pdf10 Dec 2024
Details of encumbrances concerned to LegalFile: MahaRERA - SKY53 - Legal Encumberance report.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Plan Renewal SKY 53.pdf18 Nov 2024
CERSAI detailsFile: affidavit cersai.pdf18 Nov 2024
Other - LegalFile: 7 12 EXTRACT SKY53.pdf16 Nov 2024
Declaration about Commencement CertificateFile: Building Plan Renewal SKY 53.pdf16 Nov 2024
Other - LegalFile: DEED OF ASSIGNMENT SKY53.pdf13 Aug 2024
Other - LegalFile: SKY 53 SELF CERTIFICATION OF ENCUMBRANCE LEGAL.pdf14 Jun 2024
Declaration about Commencement CertificateFile: REA51600161802.pdf14 Jun 2024
Deviation Report with respect to Allotment letterFile: SKY53 NO DEVIATION ALLOTMENT.pdf14 Jun 2024
Other - FinanceFile: SKY 53 SELF CERTIFICATION- NO ENCUMBRANCE RELATED TO FINANCE.pdf14 Jun 2024
Other - TechnicalFile: SKY 53 SELF CERTIFICATION OF ENCUMBRANCE.pdf14 Jun 2024
Other - TechnicalFile: SKY53 ANNEXURE A DECLARATION CUM UNDERTAKING.pdf14 Jun 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (2).pdf13 Jun 2024
Details of encumbrances concerned to FinanceFile: NO LEGAL ENCUMBERANCE.pdf13 Jun 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged (2).pdf13 Jun 2024
Details of encumbrances concerned to LegalFile: NO LEGAL ENCUMBERANCE.pdf13 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE1.pdf10 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE2.pdf10 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE3.pdf10 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE4.pdf10 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE5.pdf10 Jun 2024
Building plan approvalFile: SNo53BUILDINGPLANPAGE6.pdf10 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: NAORDERSNo53COMMERCIAL.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE1.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE2.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE3.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE4.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE5.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SNo53BUILDINGPLANPAGE6.pdf10 Jun 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE - SKY53.pdf1 Jun 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER - SKY53.pdf30 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account RERA.pdf30 May 2024
Deviation Report with respect to Allotment letterFile: SKY 53 NO DEVIATION.pdf30 May 2024
Deviation Report with respect to model copy of AgreementFile: deviation report - allotment letter.pdf30 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SKY53 ANNEXURE A DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS.pdf30 May 2024
Layout approvalFile: layout Anandvalli 53_1.pdf27 May 2024
Copy of Layout Approval (in case of layout)File: layout Anandvalli 53_1.pdf27 May 2024
Declaration in FORM BFile: SKY53 FORM-B AFFIDAVIT CUM DECLARATION.pdf27 May 2024
Declaration about Commencement CertificateFile: SKY 53 FORMAT -D001.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKY 53 ARCHITECTS CERTIFICATE.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sky53 RERA form 2_ENGINEER CERTIFICATE.pdf11 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate building plan - anandvalli.pdf11 May 2024
PAN CardFile: sky533 PAN.pdf7 May 2024

How this compares with Nashik

1%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY53 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Anandvalli4,100+ in Nashik

2 kmSKY53Completed 47Lapsed / revoked 12Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: SKY53

SKY53 has 1 registration on MahaRERA, including SKY53. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SKY53 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY53?

The registered promoter entity is SKY53, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY53?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY53?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY53?

The professionals named in the filing: Architect: Ar Darshan Sancheti from PDP Architects; Architect: Darshan Sancheti from pdp; Engineer: JW Consultants LLP; Engineer: Neel Mutha from Legend Infratech; Engineer: HINDURAO SHANTARAM HAMBARE; Chartered Accountant: CA Anil Jain from Deshmukh Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY53?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY53. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY53 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.