Home / Browse projects / Thane, Maharashtra / Runwal One-Tower D1

Registered Litigation declared Residential / Group Housing project

Runwal One-Tower D1

By Runwal Developers Limited

RG-MH-49962 · RERA PR1330002502798 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA
  • Rs 525.00 crore secured on the land, in favour of ICICI Bank LTD, TATA CAPITAL HOUSING FINANCE LIMITED

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2030Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 23%
228 of 282Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

Runwal One-Tower D1 is a Residential / Group Housing project by Runwal Developers Limited in Thane, Maharashtra, registered with MahaRERA as PR1330002502798 on 16 Mar 2026. Possession is promised by 30 Sep 2030. 54 of the 282 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRunwal One-Tower D1
  • TypeResidential / Group Housing
  • Location
    • Ghodbundar Road
    • Manpada
    • Sector No.5
    • Chitalsar Manpada
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1330002502798
  • ReraGenie IDRG-MH-49962

Builder

  • NameRunwal Developers Limited
  • Entity typeCompany
  • GSTIN27AAACR0395J1Z8
  • DirectorsAshok Darak, Sanjay Sharma, Sandeep Runwal
  • Non Executive Independent DirectorRupal Vora
  • Non executive Director and ChairmanH A Visweswara
  • Non executive Independent DirectorBhavesh Vora
  • Other registrations8 more →
  • Past their filed date1
  • Declared earlier projects8 →

Key dates

this monthRegisteredMar 2026PromisedSep 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Mar 2026
  • Promised completion30 Sep 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed14 files

Current status

19%54 of 282 units booked
21.3%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG. TYPE- D1NA59502820282

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 23%.

BLDG. TYPE- D1: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed493

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots493
Stilt / Ground145
Podiums / Upper Parking Floor244
Stack Parking84
Basement20

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area58,730 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank LTD, TATA CAPITAL HOUSING FINANCE LIMITED
Secured amountRs 525.00 crore
CERSAI search filedYes
Declared on13 Mar 2026

Approvals and building plan

Sanctioning authorityThane Municipal corporation
Permissible FSI32652.95
Proposed, not sanctioned32,653 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 9, 10, Mary Land Corner, Beside Next Show Room, Eastern Express High Way, Near Sion Circle, Sion, Mumabi Maharashtra.400022
Estimated costRs 246.71 cr
Cost incurredRs 52.57 cr
Work done21.31%
BuildingWingEstimatedIncurred
BLDG. TYPE- D1NARs 192.44 crRs 41.01 cr
-NARs 54.28 crRs 11.57 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNinad Mhaskar
EngineerMadhusudan Narayan
Chartered AccountantSinghi & Co.
Chartered AccountantS P Gunjal & Associates
PartnerRole in project
Runwal Developers Limited-

Litigation declared6

CaseCourtStatus
79/2011High Court At CalcuttaOngoing
12/2009High Court At CalcuttaOngoing
565/2022Civil Court S.D. ThaneOngoing
605/2009Civil Court S.D. ThaneOngoing
472/2011Civil Court S.D. ThaneOngoing
566/2022Civil Court S.D. ThaneOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604139Vishesh Kumar BabelRunwal Developers Limited02/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2030

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf30 Apr 2026
Withdrawal Update Form 3File: Runwal One TD1-Form 3.pdf30 Apr 2026
Layout approvalFile: LAYOUT-T D1-MARKING.pdf13 Mar 2026
Building plan approvalFile: TYPICAL FLOOR BLDG TYPE D1.pdf13 Mar 2026
Building plan approvalFile: GR P2 LVL FLOOR BLDG TPE D1.pdf13 Mar 2026
Building plan approvalFile: RECREATIONAL FLOOR BETWEEN 17TH AND 18TH FLOOR AND ABOVE and section.pdf13 Mar 2026
Building plan approvalFile: B1 AND B2.pdf13 Mar 2026
Building plan approvalFile: P1 P2 P3 AND P4.pdf13 Mar 2026
Building plan approvalFile: D1 parking statement.pdf13 Mar 2026
Declaration and undertaking (Annexure A)File: Annexure A.pdf9 Mar 2026

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
25HOURLIFE - Tower A1P51700053696Chitalsar Manpada, Thane590Nov 2023OngoingDec 2030Not due yet
25HOURLIFE - Tower C1P51700048278Panchpakhadi, Thane319Dec 2022OngoingDec 2029Not due yet
25HOURLIFE - Tower B1P51700048270Punchpakhadi, Thane539Dec 2022OngoingDec 2029Not due yet
ZENITHP51700046734BALKUM DHOKALI, Thane290Sep 2022OngoingSep 2028Not due yet
RUNWAL TIMELESSP51900005685Sion East441Aug 2017OngoingSep 2026Not delivered

How this compares with Thane

19%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal One-Tower D1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manpada, Sector No.57,600+ in Thane

Builder: Runwal Developers Limited

RUNWAL DEVELOPERS LIMITED has 9 registrations on MahaRERA, including RUNWAL TIMELESS and ZENITH. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Runwal One-Tower D1 is delayed beyond 30 Sep 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal One-Tower D1?

The registered promoter entity is Runwal Developers Limited, a company as per the filing. Its GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal One-Tower D1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runwal One-Tower D1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runwal One-Tower D1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal One-Tower D1?

The professionals named in the filing: Architect: Ninad Mhaskar; Engineer: Madhusudan Narayan; Chartered Accountant: Singhi & Co.; Chartered Accountant: S P Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal One-Tower D1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal One-Tower D1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal One-Tower D1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.