Home / Browse projects / RUNWAL TIMELESS

Registered Litigation declared Residential / Group Housing project

RUNWAL TIMELESS

By RUNWAL DEVELOPERS LIMITED

RG-MH-69833 · RERA P51900005685 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Litigation declared, 1 case
  • 9 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
215 of 749Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 236 documents Report an error

RUNWAL TIMELESS is a Residential / Group Housing project by RUNWAL DEVELOPERS LIMITED in Sion East, 400022, registered with MahaRERA as P51900005685 on 11 Aug 2017. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 534 of the 749 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameRUNWAL TIMELESS
  • TypeResidential / Group Housing
  • Location
    • Pratiksha Nagar
    • Sion East
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900005685
  • ReraGenie IDRG-MH-69833

Builder

  • NameRUNWAL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINU70100MH1988PLC046631
  • GSTIN27AAACR0395J1Z8
  • DirectorSujata Rao
  • Other registrations8 more →
  • Past their filed date1
  • Declared earlier projects8 →

Key dates

1 months past promisethis monthRegisteredAug 2017PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed236 files

Current status

71%534 of 749 units booked
46.9%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUNWAL TIMELESSNA42407490749

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

RUNWAL TIMELESS: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,120 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
EASY HOME SOLUTIONS PRIVATE LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI58057.0
Proposed, not sanctioned40,989 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSION EAST MUMBAI
Estimated costRs 495.00 cr
Cost incurredRs 231.95 cr
Work done46.86%
BuildingWingEstimatedIncurred
RUNWAL TIMELESSNARs 346.50 crRs 162.36 cr
-NARs 148.50 crRs 69.58 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJATIN BHUTA
ArchitectPallavi Matkari
ArchitectNinad Mhaskar
EngineerSanjay Singh
Chartered AccountantM B Agarwal &Co
Chartered AccountantSinghi & Co. Chartered Accountants
PartnerRole in project
RUNWAL DEVELOPERS LIMITED-

Litigation declared1

CaseCourtStatus
337/2019Apex Grievance Redressal Committee SRADisposed of as withdrawn

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000195716SREERAM VISWANATHAN MELARKODEEASY HOME SOLUTIONS PRIVATE LIMITED26/01/2021
CC006000000196389Meena Vinod Melarkoderunway developers private limited17/03/2021
CC12500162Neeloy MajumderRUNWAL DEVELOPERS PRIVATE LIMITED18/01/2025
CC12500265DHRUVI CHETAN DAMANIARUNWAL DEVELOPERS PRIVATE LIMITED25/01/2025
CC12500797Prashant Bhimrao PunjarwadRUNWAL DEVELOPERS PRIVATE LIMITED08/03/2025
CC12601459Pradeep Ramanna ShettyRUNWAL DEVELOPERS LIMITED16/03/2026
CC12601527Priyanka Raju MalhotraRUNWAL DEVELOPERS LIMITED20/03/2026
CC12602139Shamji Gulshan OberaiRUNWAL DEVELOPERS LIMITED11/04/2026
CC12602314Mahendra KotechaRUNWAL DEVELOPERS LIMITED19/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed236

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 236 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jul 2026
Form 1File: Form 1.pdf27 Apr 2026
Form 2File: Form 2.pdf27 Apr 2026
Form 3File: Form 3.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf27 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf26 Mar 2026
Form 1File: Form 1.pdf28 Jan 2026
Form 2File: Form 2.pdf28 Jan 2026
Form 3File: Form 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf3 Dec 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1 June 2025.pdf30 Jul 2025
Form 2File: Form 2 June 2025.pdf30 Jul 2025
Form 3File: Form 3 June 2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2025.pdf30 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf5 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Wing A.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Wing B.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C wing form 1.pdf18 Apr 2025
Certificates of CA (Form 3)File: Form 3 18 04 2025.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 WING A Dec 24.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 WING B Dec 2024.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 WING C Dec 2024.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 2023 24.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf17 Dec 2024
Other - TechnicalFile: WADALA SALE BUILDING_PROPOSED PLAN TYPICAL FLOOR PLAN 29 11 2024.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 Sep 2024 Wing A.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2024 Wing B.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2024 Wing C.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf21 Oct 2024
Certificates of CA (Form 3)File: Form 3 Sep 2024.pdf18 Oct 2024
Proforma of Agreement for saleFile: AFS Wadala Liquidated damages dtd 08 07 2024 Part 1.pdf31 Jul 2024
Proforma of Agreement for saleFile: AFS Wadala Liquidated damages 08 08 2024 Part 2.pdf31 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Revised March 2024.pdf29 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 Revised March 2024.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 June 2024.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024 A.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024 B.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024 C.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June 2024.pdf19 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Wadala Sale Bldg dtd 28 03 24.pdf10 May 2024
Declaration about Commencement CertificateFile: TIMELESS Declaration about CC 31032024.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024 Wing A.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024 Wing B.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024 Wing C.pdf22 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 March 2024.pdf22 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory compressed.pdf23 Jan 2024
Certificates of CA (Form 3)File: Form 3 compressed.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Wing A.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Wing B.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Wing C.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Nov 2023

Keep RUNWAL TIMELESS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sion East

2 kmRUNWAL TIMELESSCompleted 22Lapsed / revoked 9Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: RUNWAL DEVELOPERS LIMITED

RUNWAL DEVELOPERS LIMITED has 9 registrations on MahaRERA, including RUNWAL TIMELESS and ZENITH. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if RUNWAL TIMELESS is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUNWAL TIMELESS?

The registered promoter entity is RUNWAL DEVELOPERS LIMITED, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUNWAL TIMELESS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUNWAL TIMELESS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUNWAL TIMELESS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUNWAL TIMELESS?

The professionals named in the filing: Architect: JATIN BHUTA; Architect: Pallavi Matkari; Architect: Ninad Mhaskar; Engineer: Sanjay Singh; Chartered Accountant: M B Agarwal &Co; Chartered Accountant: Singhi & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUNWAL TIMELESS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUNWAL TIMELESS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUNWAL TIMELESS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.