Completed No litigation declared Residential / Group Housing project

PRESTIGE JASDAN CLASSIC

By PRESTIGE ESTATES PROJECTS LIMITED

RG-MH-30770 · RERA P51900031285 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 71%
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

PRESTIGE JASDAN CLASSIC is a Residential / Group Housing project by PRESTIGE ESTATES PROJECTS LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900031285 on 15 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NamePRESTIGE JASDAN CLASSIC
  • TypeResidential / Group Housing
  • Location
    • 556 N M JOSHI MARG
    • BYCULLA
    • Mumbai City
    • 400011
  • Pincode400011
  • RERA no.P51900031285
  • ReraGenie IDRG-MH-30770

Builder

  • NamePRESTIGE ESTATES PROJECTS LIMITED
  • Entity typeCompany
  • CINL07010KA1997PLC022322
  • GSTIN27AABCP8096K1ZT
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsZAYED NOAMAN RAZACK, REZWAN SATTAR RAZACK
  • Managing DirectorIRFAN SATTAR RAZACK
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Oct 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed132 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
West Tower - Wing ANA5045000
East Tower - Wing BNA5045000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 71%.

West Tower - Wing A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure71%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
East Tower - Wing B57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure69%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
West Tower - Wing A11
East Tower - Wing B11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,692 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI33325.3
Proposed, not sanctioned33,325 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCommercial Branch, Bangalore

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMQA
EngineerHRE VENKATADR ASSOCIATES
Chartered AccountantMs. BHUVANA BHAT & ASSOCIATES
Chartered AccountantMUNIYAL PADMANABHA BHAT
PartnerRole in project
PRESTIGE ESTATES PROJECTS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Jul 2025

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Q3 Jasdan_Form 1.pdf3 Feb 2026
Form 2File: Q3 Form 2_Jasdan.pdf3 Feb 2026
Form 3File: Q3 Jasdan_Form 1.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Q3_Sold Unsold_Jasdan.pdf3 Feb 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 250527_Full OC for Wings ABC.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jasdan Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jasdan Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jasdan Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Jasdan Q4.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jasdan Form 1 Q3.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jasdan Form 3 Q3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jasdan Form 2 Q3.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: Jasdan Sold Unsold Q3.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Prestige Jasdan Classic.pdf20 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Prestige Jasdan Classic.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jasdan Form 1 Q2.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jasdan Form 3 Q2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PTC Form 2 Q2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jasdan Form 2 Q2.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Jasdan Sold Unsold Q2.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PJC - Form 1 FY 24-25.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PJC Form 2 FY 24-25.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PJC Form 2 FY 24-25.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: PJC sold unsold FY-24-25.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PJC Form 3FY 24-25.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2- Form 1 PJC.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3- Form 1 PJC.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate Q4.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2- Form 2- PJC.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3- Form 2 PJC.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jasdan Classic CE certificate Form-02.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: Q1- Sold-Unsold PJC.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: Q2- Sold-Unsold PJC.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: Q3- Sold-Unsold PJC.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: List of sold unsold.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2- Form 3 PJC.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3- Form 3 PJC.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jasdan classic Form 3.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2024.pdf31 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jasdan - Q4.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PJC - Form 2A FY 21-22.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PJC - Form 2A FY 22-23.pdf31 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PJC - Form 2A FY 23-24.pdf31 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Mar 2024.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf31 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf31 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MRera certificate PJC_compressed.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jasdan Classic-Form-02-as on 31Mar 22_compressed.pdf25 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jasdan classic Form-02-as on 30 Jun 22_compressed.pdf25 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prestige_Jasdan_Classic_Form_3_Comp.pdf25 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prestige_Jasdan_classic_30 Jun 22_comp.pdf25 Jul 2022
Details of encumbrancesFile: No Encumbrance - 18 Jul 22.pdf18 Jul 2022
CERSAI detailsFile: PJC CERSAI 18 Jul 22.pdf18 Jul 2022
Building plan approvalFile: 1.pdf16 May 2022
Building plan approvalFile: 2.pdf16 May 2022
Building plan approvalFile: 3.pdf16 May 2022
Building plan approvalFile: 4.pdf16 May 2022
Building plan approvalFile: 5.pdf16 May 2022
Building plan approvalFile: 6.pdf16 May 2022
Building plan approvalFile: 7.pdf16 May 2022
Building plan approvalFile: 8.pdf16 May 2022
Building plan approvalFile: 9.pdf16 May 2022
Building plan approvalFile: 10.pdf16 May 2022
Details of encumbrancesFile: 0059_220516220444_001.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf16 May 2022
Commencement Certificates / NA Order for plotted developmentFile: 0066_220517010254_001 comp.pdf16 May 2022
Declaration about Commencement CertificateFile: 0062_220517003442_001.pdf16 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 0064_220517003736_001comp.pdf16 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prestige_Jasdan_Classic_Form_3_Comp.pdf16 May 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRESTIGE BAGMANE TEMPLE BELLSSy No 54 55 56 1 56 2 56 3 56 4 57 2 Hosekerahalli Village Uttarahalli Hobli Bangalore South968CompletedSep 2019Jun 2019
PRESTIGE DEJAVUKhata No 51 1 Promenade Road Coles Road Frazer Town Bangalore40CompletedAug 2019Aug 2019

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRESTIGE JASDAN CLASSIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BYCULLA780+ in Mumbai City

Builder: PRESTIGE ESTATES PROJECTS LIMITED

PRESTIGE ESTATES PROJECTS LIMITED has 3 registrations on MahaRERA, including PRESTIGE JASDAN CLASSIC and PRESTIGE DAFFODILS CHSL. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if PRESTIGE JASDAN CLASSIC is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRESTIGE JASDAN CLASSIC?

The registered promoter entity is PRESTIGE ESTATES PROJECTS LIMITED, a company as per the filing. Its CIN L07010KA1997PLC022322 and GSTIN 27AABCP8096K1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRESTIGE JASDAN CLASSIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRESTIGE JASDAN CLASSIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRESTIGE JASDAN CLASSIC?

The professionals named in the filing: Architect: MQA; Engineer: HRE VENKATADR ASSOCIATES; Chartered Accountant: Ms. BHUVANA BHAT & ASSOCIATES; Chartered Accountant: MUNIYAL PADMANABHA BHAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRESTIGE JASDAN CLASSIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRESTIGE JASDAN CLASSIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRESTIGE JASDAN CLASSIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.