Home / Browse projects / Pune, Maharashtra / YashONE Eternitee Phase 1
YashONE Eternitee Phase 1
By Vilas Javdekar Infinitee Developers Pvt. Ltd.
RG-MH-58363 · RERA P52100046122 · Last updated on MahaRERA portal: 30 Oct 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YashONE Eternitee Phase 1 is a Residential / Group Housing project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100046122 on 20 Jun 2022. The registration is recorded completed; possession was promised by 30 Apr 2026. 382 of the 382 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameYashONE Eternitee Phase 1
- TypeResidential / Group Housing
- Location
- Maan
- Man
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046122
- ReraGenie IDRG-MH-58363
Builder
- NameVilas Javdekar Infinitee Developers Pvt. Ltd.
- Entity typeCompany
- CINU70109PN2020PTC195347
- GSTIN27AAHCV6956A1Z5
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsAditya Vilas Javdekar, Aditya Vilas Javdekar
- Other registrations10 more →
- Completed4 of 11
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on20 Jun 2022
- Promised completion30 Apr 2026
- Revised completionNone
- Buildings2 building records
- Documents filed160 files
Current status
Figures as on 30 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building C - 22 floors | NA | 25 | 22 | 195 | 0 | 195 |
| Building D - 22 floors | NA | 25 | 22 | 187 | 0 | 187 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.
Building C - 22 floors90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Building D - 22 floors89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 30 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 65% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 40% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 40% |
Parking filed499
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building C - 22 floors | 255 | 255 |
| Building D - 22 floors | 244 | 244 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sukhwani Infracon LLP | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building C - 22 floors | NA | Rs 41.46 cr | Rs 38.89 cr |
| Building D - 22 floors | NA | Rs 41.38 cr | Rs 39.37 cr |
| - | NA | Rs 29.50 cr | Rs 21.33 cr |
Certifying professionals and partners13
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Priya Saddalgi |
| Architect | Ninad Kulkarni |
| Architect | Anuja Joshi |
| Architect | Shrutika Hadimani |
| Architect | Kunal Navale |
| Architect | Sameer Murari Valimbe |
| Architect | Ar. Surendra Gade |
| Architect | Sameer Valimbe |
| Engineer | Sagar Kale |
| Engineer | Nitin Tarange |
| Chartered Accountant | Sunil Nimbalkar |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Infinitee Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600611 | Vilas Javdekar Infinitee Developers Pvt. Ltd. | Bharat Kumar O Tawari | 02/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed160
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: YashONE Eternitee Phase 1 -Completion Certificate_Building C & D_Dated-16102025.pdf | 30 Oct 2025 |
| Withdrawal Update Form 1File: Architect certificate Eternitee PH 1 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate Eternitee phase 1 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate Eternitee PH 1 30-09-25.pdf | 11 Oct 2025 |
| Form 5 (FY 2024-2025)File: VJIDPL_FORM 5_P52100046122_Eternitee1.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Architech Certificate Eternitee 1 30-06-25.pdf | 14 Jul 2025 |
| Withdrawal Update Form 2File: Architech Certificate Eternitee 1 30-06-25.pdf | 14 Jul 2025 |
| Withdrawal Update Form 3File: VJIDPL -YASHONE ETERNITEE PH-1.pdf | 14 Jul 2025 |
| Form 2A (FY 2024-2025)File: Eternitee1_Form2A_31032025_Signed.pdf | 25 Jun 2025 |
| Form 1File: Eternitee1_Architect_31032025_Signed.pdf | 6 May 2025 |
| Form 2File: Eternitee1_Engineer_31032025_Signed.pdf | 6 May 2025 |
| Form 3File: Eternitee1_CA_ 31032025_Signed.pdf | 6 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Eternitee1_Sold Inventory_31032025.pdf | 6 May 2025 |
| OthersFile: Eternitee1_Form2A_31032025_Signed.pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eternitee1_Form2A_31032025_Signed.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eternitee1_Architect_31032025_Signed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eternitee1_Engineer_31032025_Signed.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Eternitee1_Sold Inventory_31032025.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_Eternitee_Signed_.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Eternitee phase 2 03-02-25_signed.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Eternitee phase 1 03-02-25_signed.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_Eternitee_signed.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Eternitee phase 1 03-02-25_signed.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Eternitee Ph-123-1-25_signed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Eternitee PH 1 22-01-25_signed.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Eternitee Ph-1_signed13-01-25.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Eternitee PH 1 12-01-25_signed.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory Eternitee 1_signed.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Eternitee phase 1 31-12-24_signed.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Eternitee_ph 1_signed.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Eternitee phase 1 31-12-24_signed.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH YASHONE ETERNITEE PH 1_signed.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Eternitee Ph-1_signed_compressed.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER YASHONE ETERNITEE PH 1_signed.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY ETERNITEE PH 1-signed.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 14_Form 5 VJ Yashone Eternitee Phase I_signed.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Eternitee Phase I Updated_signed_compressed 11.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Eternitee Phase I Updated_signed (1).pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 10_Form 2A_Eternitee1_31032024.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY YASHONE ETERNITEE PHASE 1_signed.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_yashwin_eternitee_ph_1_signed.pdf | 13 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_yashwin_eternitee_ph_1_signed.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Eternitee Phase I Updated_signed_compressed 11.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_certificate_Yashone_eternitee_ph_1_signed.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10_Architect_Eternitee1_AJ_31032024_signed.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10_Engineer Certificate_Eternitee Ph-1_signed.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 10_Form 2A_Eternitee1_31032024.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 10_Eternitee1_Inventory_31032024_signed.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10_CA Certificate_Eternitee Ph-1_signed_compressed.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 22 Architect_Eternitee 1_31122023.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 22 Engineer Certificate_Eternitee Ph-1.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 22 Sold Unsold_Eternitee 1_31122023_signed.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 22 CA Certificate_Eternitee PH-1_compressed.pdf | 15 Jan 2024 |
| OtherFile: Eternitee Ph1.pdf | 20 Oct 2023 |
| Layout approvalFile: 1-Layout_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 15-Building C-First and Typical Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 16-Building C-Refuge and Terrace Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 19-Building D-First and Second Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 20-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 21-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: 22-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: 1-Layout_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 15-Building C-First and Typical Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-Building C-Refuge and Terrace Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 19-Building D-First and Second Floor Plan_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 20-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 21-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 22-Building D-Floor Plans_compressed_compressed.pdf | 19 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC dated 05-09-2023_compressed_compressed.pdf | 19 Oct 2023 |
| Declaration about Commencement CertificateFile: Eternitee Phase 1_CC declaration_signed.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Yashone Eternitee Ph-1_signed.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA- YashONE Eternitee ph 1_compressed.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Y1E 1_compressed.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Eternitee Ph 1_Sept 2023_signed.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJIDPL RERA NUMBER P52100046122_Eternitee Phase 1.pdf | 16 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Eternitee Phase-1.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Eternitee Phase-1_compressed.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Yashone Eternitee phase1 Sold unsold_compressed.pdf | 14 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashone_eternitee_phase_1_june23.pdf | 12 Jul 2023 |
| OtherFile: Y1_ETERNITEE_1.pdf | 12 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 160 filed documents as one ZIP, foldered, with a manifest
Keep YashONE Eternitee Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Maan13,700+ in Pune
Filed coordinates, straight-line distance. 50 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.
Vilas Javdekar Infinitee Developers Pvt. Ltd. has 11 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if YashONE Eternitee Phase 1 is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YashONE Eternitee Phase 1?
The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YashONE Eternitee Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against YashONE Eternitee Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for YashONE Eternitee Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YashONE Eternitee Phase 1?
The professionals named in the filing: Architect: Priya Saddalgi; Architect: Ninad Kulkarni; Architect: Anuja Joshi; Architect: Shrutika Hadimani; Architect: Kunal Navale; Architect: Sameer Murari Valimbe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YashONE Eternitee Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback