YashONE Infinitee - Phase III
By Vilas Javdekar Infinitee Developers Pvt. Ltd.
RG-MH-22271 · RERA P52100030825 · Last updated on MahaRERA portal: 13 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YashONE Infinitee - Phase III is a Others project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100030825 on 14 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 144 of the 150 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.
At a glance
Project
- NameYashONE Infinitee - Phase III
- TypeOthers
- Location
- Punawale
- Kate wasti
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100030825
- ReraGenie IDRG-MH-22271
Builder
- NameVilas Javdekar Infinitee Developers Pvt. Ltd.
- Entity typeCompany
- CINU70109PN2020PTC195347
- GSTIN27AAHCV6956A1Z5
- DirectorsAditya Vilas Javdekar, Aditya Vilas Javdekar
- Other registrations10 more →
- Completed4 of 11
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Sep 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed139 files
Current status
Figures as on 13 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Inclusive Housing Building | NA | 14 | 12 | 104 | 0 | 104 |
| Commercial Building 2 | NA | 5 | 3 | 0 | 46 | 46 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.
Inclusive Housing Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Commercial Building 274%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 13 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 60% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 0% |
Parking filed380
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Inclusive Housing Building | 260 | 10 | 270 |
| Commercial Building 2 | 110 | 0 | 110 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Inclusive Housing Building | NA | Rs 13.05 cr | Rs 13.05 cr |
| Commercial Building 2 | NA | Rs 9.14 cr | Rs 9.14 cr |
| - | NA | Rs 4.85 cr | Rs 4.85 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sameer Valimbe |
| Architect | Neha Bagayatkar |
| Engineer | Sagar kale |
| Chartered Accountant | Sunil Nimbalkar |
| Chartered Accountant | Abhijit Mundada |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Infinitee Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed139
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Completion Certificate_21 Punawale Comm-2_Dated- 11122025.pdf | 13 Dec 2025 |
| Occupational CertificateFile: Completion Certificate 21P MHADAand Comm-2 12 shops- dated 13082024.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: Architect certificate Infinitee PH 3 30-09-25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate Infinitee phase 3 30-09-25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate Infinitee PH 3 30-09-25.pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: VJIDPL_Form 5_P52100030825_Infinitee3.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Architect certificate Infinitee PH 3 21-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate Infinitee PH 3 21-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 3File: CA certificate Infinitee PH 3 22-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: Architech Certificate Infinitee phase 3 30-06-25.pdf | 19 Aug 2025 |
| Withdrawal Update Form 2File: Architech Certificate Infinitee phase 3 30-06-25.pdf | 19 Aug 2025 |
| Withdrawal Update Form 3File: VJIDPL- YASHONE INFINITEE PH-3.pdf | 19 Aug 2025 |
| Withdrawal Update Form 1File: Infinitee3_Architect_31032025_Signed.pdf | 1 Jul 2025 |
| Withdrawal Update Form 2File: Infinitee3_Engineer_31032025_Signed.pdf | 1 Jul 2025 |
| Withdrawal Update Form 3File: Infinitee3_CA_ 31032025_Signed.pdf | 1 Jul 2025 |
| Form 2A (FY 2024-2025)File: Infinitee3_Form2A_31032025_Signed.pdf | 25 Jun 2025 |
| Form 1File: Infinitee3_Architect_31032025_Signed.pdf | 6 May 2025 |
| Form 2File: Infinitee3_Engineer_31032025_Signed.pdf | 6 May 2025 |
| Form 3File: Infinitee3_CA_ 31032025_Signed.pdf | 6 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Infinitee3_Sold Inventory_31032025_Signed.pdf | 6 May 2025 |
| OthersFile: Infinitee3_Form2A_31032025_Signed.pdf | 6 May 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 4) Yashone Infinitee IHP- Society Registration Certificate.pdf | 26 Apr 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 04) Yashone Infinitee Comm Bldg 1 Society Reg Certificate.pdf | 26 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Infinitee3_Form2A_31032025_Signed.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Infinitee3_Architect_31032025_Signed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Infinitee3_Engineer_31032025_Signed.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Infinitee3_Sold Inventory_31032025_Signed.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_revised_Infinitee Ph-3_Signed_.pdf | 4 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration about cc Infinitee 3 12082024_signed.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory Infinitee ph 3_signed.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Infinitee phase 3 31-12-24_signed.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Infinitee Ph-3.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Infinitee phase 3 31-12-24_signed.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH YASHONE INFINITEE PH 3_signed.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_Infinitee Ph-3_signed.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER YASHONE INFINITEE PH 3_signed.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 13_Form 5 VJ Yashone infinitee phase -3_signed.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory_Infinitee3_30062024_signed.pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: pdf24_merged YASHONE INFINITEE PHASE-3.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 9_Form 2A_Infinitee3_31032024.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 9_Form 2A_Infinitee3_31032024.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY YASHONE INFINITEE PHASE 3_signed.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_yashone_infinitee_ph_3_signed.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Infinitee Phase III_signed.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_certificate_Yashone_infinitee_ph_3_signed.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9_Architect_Infinitee3_PS_31032024_signed.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9_Engineer Certificate_Infinitee PH-3_signed.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 9_Form 2A_Infinitee3_31032024.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 9_Infinitee3_Inventory_31032024_signed.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9_CA Certificate_Infinitee PH-3_signed.pdf | 15 Apr 2024 |
| Building plan approvalFile: 14- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 15- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 16- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Layout approvalFile: 01- Layout Plan_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 02- Basement,Ground Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 03- 1ST Parking Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 04- Ground Parking Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 05- Typical Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building plan approvalFile: 17- Commercial -2 Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 01- Layout Plan_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 02- Basement,Ground Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 03- 1ST Parking Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 04- Ground Parking Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 05- Typical Floor Plan_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 14- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 15- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 16- Commercial -2 and Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 17- Commercial -2 Inclusive Housing_compressed.pdf | 10 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Dated- 28032024.pdf | 10 Apr 2024 |
| Declaration about Commencement CertificateFile: Infinitee Ph 3_CC declaration_28032024_signed.pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 21 Architect_Infinitee III_31122023.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21 Engineer Certificate_Infinitee PH-3.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 21 Sold Unsold_Infinitee III_31122023_signed.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 21 CA Certificate_Infinitee Ph-3_compressed.pdf | 15 Jan 2024 |
| OtherFile: Y1 Infinitee PH 3.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Infinitee Ph-3_compressed.pdf | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold_ YashONE Infinitee ph 3.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Infinitee Ph 3_Sept 2023_signed.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Infinitee Ph-3.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJIDPL RERA NUMBER P52100030825_Infinitee Ph 3.pdf | 16 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 139 filed documents as one ZIP, foldered, with a manifest
Keep YashONE Infinitee - Phase III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kate wasti13,700+ in Pune
Filed coordinates, straight-line distance. 234 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.
Vilas Javdekar Infinitee Developers Pvt. Ltd. has 11 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if YashONE Infinitee - Phase III is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YashONE Infinitee - Phase III?
The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YashONE Infinitee - Phase III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YashONE Infinitee - Phase III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YashONE Infinitee - Phase III?
The professionals named in the filing: Architect: Sameer Valimbe; Architect: Neha Bagayatkar; Engineer: Sagar kale; Chartered Accountant: Sunil Nimbalkar; Chartered Accountant: Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YashONE Infinitee - Phase III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.