Home / Browse projects / Pune, Maharashtra / Pune Baner Project-Tower 4 and 5

Registered Litigation declared Residential / Group Housing project

Pune Baner Project-Tower 4 and 5

By Goel Ganga Ventures India Private Limited

RG-MH-18722 · RERA PR1261012400049 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedmoved 12 months from the original
4 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 14%
26 of 270Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

Pune Baner Project-Tower 4 and 5 is a Residential / Group Housing project by Goel Ganga Ventures India Private Limited in Pune, Maharashtra, registered with MahaRERA as PR1261012400049 on 3 Oct 2024. Possession is promised by 29 Jun 2030. The completion date has moved by 12 months from the original filing. 244 of the 270 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePune Baner Project-Tower 4 and 5
  • TypeResidential / Group Housing
  • Location
    • BANER
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1261012400049
  • ReraGenie IDRG-MH-18722

Builder

  • NameGoel Ganga Ventures India Private Limited
  • Entity typeCompany
  • CINU45201PN2020PTC192067
  • GSTIN27AAICG3944J1ZA
  • DirectorsPraveen Kabra, Vikas Mundra, Annuj Umesh Goel
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2024First promiseJun 2029Revised toJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Oct 2024
  • Promised completion29 Jun 2030
  • Revised completionRevised to 29 Jun 2030 (originally 30 Jun 2029)
  • Buildings2 building records
  • Documents filed44 files

Current status

90%244 of 270 units booked
20.6%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-T4NA27271350135
Tower-T5NA31311350135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 14%.

Tower-T423%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure11%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower-T524%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area35,350 sq m
Land owned byThe promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Oct 2025
LandownerVillageDistrict
Sunder Narayan PujariKothrudPune
Shangrila Garden Co-Operative Housing Society LimitedBanerPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI46951.35
Proposed, not sanctioned46,951 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND AND FIRST FLOOR,MOTI MAHAL, DR. ANNIE BESANT ROAD,, NEXT TO CITY BAKERY, WORLI, MUMBAI, MAHARASHTRA-400018
Estimated costRs 486.31 cr
Cost incurredRs 100.00 cr
Work done20.56%
BuildingWingEstimatedIncurred
-NARs 170.21 crRs 35.00 cr
Tower-T4NARs 158.05 crRs 32.50 cr
Tower-T5NARs 158.05 crRs 32.50 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
ArchitectPradeep Kamble
EngineerK C SHAH DESIGNS LLP
EngineerPravakar Sahoo
EngineerPravin Patil
Chartered AccountantChirag Sarvaiya
Chartered AccountantM S K A & Associates
PartnerRole in project
Goel Ganga Ventures India Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08062621279Jun 2029 → Jun 2030

Reason as filed by the promoterWe hereby submit this application seeking an extension us 6 of the project completion date for our registered project “Pune Baner Project-Tower 4 and 5” bearing MahaRERA Registration No. PR1261012400049. The applicant promoter respectfully submits that the project has been delayed due to circumstances beyond the control of the promoter, primarily relating to issues concerning the requirement of Environmental Clearance (EC) and jurisdictional ambiguity between the Central and State authorities for granting such clearance. The project site falls within a 5-kilometre radius of PCMC Jurisdiction Z

Litigation declared1

CaseCourtStatus
245/2016Special Civil SuitOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12504078Gautam BajajGoel Ganga Ventures India Private Limited19/11/2025
CC12600268Ranjana Shirish SatheGoel Ganga Ventures India Private Limited15/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2024
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Jun 2030

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 - June26.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 June 26.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Pune Baner Project-Tower 4 and 5 - PR1261012400049.pdf23 Jun 2026
Form 1File: Pune Baner Project-Tower 4 and 5 - Form1 - Mar 26 - PR1261012400049 ----.pdf21 Apr 2026
Form 2File: Form 2.pdf21 Apr 2026
Form 3File: Form 3.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf21 Apr 2026
Form 1File: Form-1 Baner 4 and 5 Dec-25.pdf27 Jan 2026
Form 2File: Form 2 Baner T4 and T5.pdf27 Jan 2026
Form 3File: Form 3 Baner T4 and T5.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Baner T4 and T5.pdf27 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - PR1261012400049 - Pune Baner Project-Tower 4 and 5.pdf13 Oct 2025
OthersFile: Layout CC.pdf10 Oct 2025
Self-declaration of Quarterly ProgressFile: Building Plans Part -1.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Building Plans Part-2.pdf10 Oct 2025
Form 1File: Building Plans Part-3.pdf10 Oct 2025
Form 2File: Building Plans Part-4.pdf10 Oct 2025
Form 3File: blank.pdf10 Oct 2025
Form 1File: CC and Layout_-.pdf12 Sep 2025
Form 2File: Building Plan-1.pdf12 Sep 2025
Form 3File: Building Plan-1.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Building Plan-2.pdf12 Sep 2025
Self-declaration of Quarterly ProgressFile: Building Plan-3.pdf12 Sep 2025
OthersFile: Building Plan-4.pdf12 Sep 2025
Form 2A (FY 2024-2025)File: Pune Baner Project-Tower 4 and 5 - PR1261012400049 - Form 2A.pdf25 Aug 2025
Form 1File: Form-1 Pune Baner Project-Tower 4 and 5 - Form1 - June 25F.pdf18 Jul 2025
Form 2File: Form 2 - Baner T4 & T5 - Jun 25.pdf18 Jul 2025
Form 3File: Form 3 - Baner Tower 4 & 5 - Jun 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Baner T4 & T5 - Jun 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Baner T4 5 - Mar 25.pdf8 May 2025
Form 1File: Form 1 (Pune Baner T 4-5).pdf8 May 2025
Form 2File: Form 2 - Baner T4 T5 - Mar 25.pdf8 May 2025
Form 3File: Form 3 - Baner Tower 4 5 - Mar 25.pdf8 May 2025
Building plan approvalFile: Tower -4 - no 9.pdf27 Sep 2024
Building plan approvalFile: Tower -4 - no 10.pdf27 Sep 2024
Building plan approvalFile: Tower -4 - no 11.pdf27 Sep 2024
Building plan approvalFile: Tower -4 - no 12.pdf27 Sep 2024
Building plan approvalFile: T5 - 13 - Compress.pdf27 Sep 2024
Building plan approvalFile: T5 - 14 - Compress.pdf27 Sep 2024
Building plan approvalFile: T5 - 15 - Compress.pdf27 Sep 2024
Building plan approvalFile: T5 - 16 - Compress.pdf27 Sep 2024
Layout approvalFile: Tower 4 5 in green.pdf27 Sep 2024
Building plan approval or NA orderFile: BANER BUILDING PLAN CC.pdf27 Sep 2024

How this compares with Pune

90%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pune Baner Project-Tower 4 and 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANER13,700+ in Pune

2 kmPune Baner Project-TowerCompleted 153Lapsed / revoked 49Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: Goel Ganga Ventures India Private Limited

Goel Ganga Ventures India Private Limited has 2 registrations on MahaRERA, including Pune Baner Project-Tower 4 and 5 and Pune Baner Project-Tower 3. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pune Baner Project-Tower 4 and 5 is delayed beyond 29 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pune Baner Project-Tower 4 and 5?

The registered promoter entity is Goel Ganga Ventures India Private Limited, a company as per the filing. Its CIN U45201PN2020PTC192067 and GSTIN 27AAICG3944J1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pune Baner Project-Tower 4 and 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pune Baner Project-Tower 4 and 5?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pune Baner Project-Tower 4 and 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pune Baner Project-Tower 4 and 5?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Architect: Pradeep Kamble; Engineer: K C SHAH DESIGNS LLP; Engineer: Pravakar Sahoo; Engineer: Pravin Patil; Chartered Accountant: Chirag Sarvaiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pune Baner Project-Tower 4 and 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pune Baner Project-Tower 4 and 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pune Baner Project-Tower 4 and 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.