Home / Browse projects / Pune, Maharashtra / YashONE Infinitee - Phase II
YashONE Infinitee - Phase II
By Vilas Javdekar Infinitee Developers Pvt. Ltd.
RG-MH-17511 · RERA P52100029042 · Last updated on MahaRERA portal: 16 Jan 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YashONE Infinitee - Phase II is a Others project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100029042 on 23 Apr 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 1 complaint is on record with the regulator.
At a glance
Project
- NameYashONE Infinitee - Phase II
- TypeOthers
- Location
- Punawale
- Kate Wasti
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100029042
- ReraGenie IDRG-MH-17511
Builder
- NameVilas Javdekar Infinitee Developers Pvt. Ltd.
- Entity typeCompany
- CINU70109PN2020PTC195347
- GSTIN27AAHCV6956A1Z5
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsAditya Vilas Javdekar, Aditya Vilas Javdekar
- Other registrations10 more →
- Completed4 of 11
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Apr 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings3 building records
- Documents filed128 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1-A2 | NA | 31 | 0 | 0 | 0 | 0 |
| B1-B2 | NA | 31 | 0 | 0 | 0 | 0 |
| Commercial 1 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 16 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
A1-A298%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B1-B2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Commercial 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
Parking filed57
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Vilas Javdekar Infinitee Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500928 | Vilas Javdekar Infinitee Developers Pvt. Ltd. | Rahul Lalit Maniyar (Allottee) | 17/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Apr 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Jan 2025
Documents filed128
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: Declaration about cc Infinitee 2 12082024_signed.pdf | 16 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashone Infinitee Building A1-A2- Society Registration Certificate.pdf | 11 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory Infinitee ph 2_signed.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Infinitee phase 2 31-12-24_signed.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Infinitee Ph-2_signed.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Infinitee phase 2 31-12-24_signed.pdf | 10 Jan 2025 |
| Other - TechnicalFile: Completion declaration_InfiniteeII_signed.pdf | 10 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Infinitee 2_signed.pdf | 9 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building A1-A2.pdf | 9 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_Building B1-B2_compressed.pdf | 9 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Commercial 1.pdf | 9 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 24_Yashone Infinitee Comm Bldg 1.pdf | 3 Dec 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 24_YASHONE INFINITEE B1-B2.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH YASHONE INFINITEE PH 2_signed.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_Infinitee Ph-2_signed.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Infinitee 2_signed.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY INFINITEE PH 2signed.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 12_Form 5 VJ Infinitte Phase 2 Sign_signed.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 8_Form 2A_Infinitee2_31032024.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY YASHONE INFINITEE PHASE 2_signed.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_yashone_infinitee_ph_2_signed.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Infinitee Phase II_signed.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_certificate_Yashone_infinitee_ph_2_signed.pdf | 4 Jul 2024 |
| Declaration about Commencement CertificateFile: YashOne infinitee ph-2 commencement certificate 28032024_signed.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8_Architect_Infinitee2_PS_31032024_signed.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8_Engineer Certificate_Infinitee PH-2_signed.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 8_Form 2A_Infinitee2_31032024.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 8_Infinitee2_Inventory_31032024_signed.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate_Infinitee Ph-2_signed.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20 Architect_Infinitee II_31122023.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 Engineer Certificate_Infinitee Ph-2.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 20 Sold Unsold_Infinitee II_31122023_signed.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20 Sold Unsold_Infinitee II_31122023_signed.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20 CA Certificate_Infinitee Ph-2_compressed.pdf | 15 Jan 2024 |
| OtherFile: Y1 Infinitee PH 2.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Infinitee Ph-2_compressed.pdf | 10 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Y1I 2_compressed.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Eternitee Ph 2_Sept 2023_signed.pdf | 7 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Infinitee Ph 2_Sept 2023_signed.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Infinitee Ph-2.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Infinitee Ph-2.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJIDPL RERA NUMBER P52100029042_Infinitee Ph2.pdf | 16 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Infinitee Ph-2_compressed.pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: yashone infinitee ph 2 sold unsold_compressed.pdf | 14 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Infinitee Ph-2.pdf | 13 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashone_infinitee_ph_2_june23.pdf | 12 Jul 2023 |
| OtherFile: Y1_I2.pdf | 12 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Y1IN PH 2.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: yashone_infinitee_2.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA_Y1_INFINITEE_P2.pdf | 15 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Y1_infinitee_ph2_compressed.pdf | 14 Apr 2023 |
| Layout approvalFile: 01_compressed.pdf | 10 Apr 2023 |
| Building plan approvalFile: 02_A1A2_BASEMENT_GROUND_compressed.pdf | 10 Apr 2023 |
| Building plan approvalFile: 05_A1A2_2ND_FLOOR_compressed.pdf | 10 Apr 2023 |
| Building plan approvalFile: 09_B1B2_1ST_FLOOR__compressed.pdf | 10 Apr 2023 |
| Building plan approvalFile: 10_B1B2_ODD_EVEN_FLOOR_PLAN_compressed.pdf | 10 Apr 2023 |
| Building plan approvalFile: 25- GROUND FLOOR - COMM 1_compressed.pdf | 10 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 01_compressed.pdf | 10 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_A1A2_BASEMENT_GROUND_compressed.pdf | 10 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 05_A1A2_2ND_FLOOR_compressed.pdf | 10 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 09_B1B2_1ST_FLOOR__compressed.pdf | 10 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_B1B2_ODD_EVEN_FLOOR_PLAN_compressed.pdf | 10 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 25- GROUND FLOOR - COMM 1_compressed.pdf | 10 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 10 Apr 2023 |
| Declaration about Commencement CertificateFile: DECLARATION_CC_Y1I_P2.pdf | 10 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_Y1I_P2.pdf | 8 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_Infinitee Ph-2.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Infinitee Ph-2_compressed.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArY1IPh2_311222.pdf | 16 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_Cert_Infinitee_Ph2_Sep22.pdf | 6 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashone infinitee P02_compressed.pdf | 24 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Infinitee Ph II_Sept 2022.pdf | 24 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Infinitee Phase-2.pdf | 3 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: SI_Infinitee II_June 2022.pdf | 10 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: ARCH_INFINITEE PH2_JUNE 2022.pdf | 8 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_INFINITEE PH2_JUNE 2022.pdf | 1 Aug 2022 |
| Details of encumbrancesFile: Infinitee Phase II_encumbrance_TATA Capital_compressed.pdf | 22 Mar 2022 |
| CERSAI detailsFile: CERSAI_Acknowledgemnt_TATA_19032022.pdf | 22 Mar 2022 |
| Layout approvalFile: Layout_12012022.pdf | 4 Feb 2022 |
| Building plan approvalFile: Refuge Floor_A1A2.pdf | 4 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 128 filed documents as one ZIP, foldered, with a manifest
Keep YashONE Infinitee - Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kate Wasti13,700+ in Pune
Filed coordinates, straight-line distance. 217 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.
Vilas Javdekar Infinitee Developers Pvt. Ltd. has 11 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if YashONE Infinitee - Phase II is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YashONE Infinitee - Phase II?
The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YashONE Infinitee - Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against YashONE Infinitee - Phase II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for YashONE Infinitee - Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in YashONE Infinitee - Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback