Completed Litigation declared Residential / Group Housing project

Peninsula - D

By Kumar Agro Products Pvt Ltd

RG-MH-49806 · RERA P52100049664 · Last updated on MahaRERA portal: 8 Oct 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Rs 295.00 crore secured on the land, in favour of Piramal Trusteeship Services Private Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 99%
0 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Peninsula - D is a Residential / Group Housing project by Kumar Agro Products Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100049664 on 22 Feb 2023. The registration is recorded completed; possession was promised by 31 Oct 2025. 44 of the 44 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePeninsula - D
  • TypeResidential / Group Housing
  • Location
    • Baner Pashan Link Road
    • Pashan
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049664
  • ReraGenie IDRG-MH-49806

Builder

  • NameKumar Agro Products Pvt Ltd
  • Entity typeCompany
  • CINU45100PN1991PTC064416
  • DirectorsKewalkumar Kesarimal Jain, Ameya Inderkumar Jain
  • Other registrations8 more →
  • Completed8 of 9
  • Declared earlier projects9 →

Key dates

this monthRegisteredFeb 2023PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Feb 2023
  • Promised completion31 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

100%44 of 44 units booked
82.3%Work done, per cost certificate

Figures as on 8 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA131144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

D: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.44%

Progress on shared amenities15

As on 8 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes75%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered88

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,783 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofPiramal Trusteeship Services Private Limited
Secured amountRs 295.00 crore
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
Kumar Peninsula Cooperative Housing SocietyPune (CB)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI6634.87
Proposed, not sanctioned6,635 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society Gen Thimayya Road East Street Camp Pune
Estimated costRs 23.70 cr
Cost incurredRs 19.50 cr
Work done82.28%
BuildingWingEstimatedIncurred
DNARs 19.25 crRs 15.96 cr
-NARs 4.45 crRs 3.54 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal Deshpande
EngineerMahesh Rasal
EngineerHarshad Pendse
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantGMKS & Co.
PartnerRole in project
Kumar Agro Products Pvt Ltd-

Litigation declared3

CaseCourtStatus
102/2018Civil Judge Senior Division PunePending
BhuAKra1/PBhu10/TRKra67/2020City Survey OfficePending
BhuAKra1/PBhu10/TRKra67/2020City Survey OfficeOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 251007_OC.pdf8 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Pen D_Signed.pdf23 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf18 Apr 2025
Declaration in FORM BFile: 250214_Form B_Declaration_R3.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 53_Peninsula - D.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 13_Peninsula - D.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: 13_Peninsula - D.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Oct 2023
Layout approvalFile: 231012_Layout.pdf18 Oct 2023
Building plan approvalFile: 231012_Sheet 8 of 11_D_Flr Plan.pdf18 Oct 2023
Building plan approvalFile: 231012_Sheet 9 of 11_D_Flr Plan.pdf18 Oct 2023
Building plan approvalFile: 231012_Sheet 10 of 11_D_Flr Plan.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: 231012_Layout.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 231012_Sheet 8 of 11_D_Flr Plan.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 231012_Sheet 9 of 11_D_Flr Plan.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 231012_Sheet 10 of 11_D_Flr Plan.pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 231012_Commencement Certificate.pdf18 Oct 2023
Proforma of Agreement for saleFile: 231012_AFS_R1.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 53_Peninsula - D.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: 13_Peninsula - D.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA certificate.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: 35_Peninsula - D.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Apr 2023
Other - TechnicalFile: 230210_Declaration with Extract of Conveyance.pdf10 Feb 2023
Other - TechnicalFile: 230206_NCLT ORDER.pdf6 Feb 2023
Other - TechnicalFile: 230206_Conveyance Deed.pdf6 Feb 2023
Declaration about Commencement CertificateFile: 230125_Format D_Declaration about CC.pdf25 Jan 2023
Declaration in FORM BFile: 230125_Form B_Declaration.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 230105_Kewalkumar Jain_R1.pdf5 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 230105_Ameya Jain_R1.pdf5 Jan 2023
CERSAI detailsFile: 230103_CERSAI_Declaration.pdf3 Jan 2023
CERSAI detailsFile: 221213_CERSAI Report_R1.pdf13 Dec 2022
Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Finanace.pdf25 Nov 2022
Details of encumbrances concerned to FinanceFile: 3_Encumbrance Certificate_Legal.pdf25 Nov 2022
Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Finanace.pdf25 Nov 2022
Details of encumbrances concerned to LegalFile: 3_Encumbrance Certificate_Legal.pdf25 Nov 2022
Proforma of Agreement for saleFile: 5_Agreement for Sale.pdf25 Nov 2022
PAN CardFile: 1_Pan Card.PDF23 Nov 2022
Copy of the legal title reportFile: 2_Legal Title Report_Format A.pdf23 Nov 2022
Deviation Report with respect to Allotment letterFile: 16_Deviation Report_AL.pdf23 Nov 2022
Deviation Report with respect to model copy of AgreementFile: 17_Deviation Report_AG.pdf23 Nov 2022
Layout approvalFile: 4_Layout.pdf21 Nov 2022
Building plan approvalFile: 13_Building Plan 1.pdf21 Nov 2022
Building plan approvalFile: 13_Building Plan 2.pdf21 Nov 2022
Building plan approvalFile: 13_Building Plan 3.pdf21 Nov 2022
Copy of the legal title reportFile: 2_Legal Title Report 1.pdf21 Nov 2022
Copy of the legal title reportFile: 2_Legal Title Report 2.pdf21 Nov 2022
Copy of the legal title reportFile: 2_Legal Title Report 3.pdf21 Nov 2022
Copy of Layout Approval (in case of layout)File: 4_Layout.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan 1.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan 2.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 13_Building Plan 3.pdf21 Nov 2022

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kumar Pratham - A B C and ShopsP52100022486Moshi - Borhadewadi, Pune222Sep 2019CompletedFeb 2025Mar 2024
Peninsula CP52100028012Pashan, Pune44Jan 2021CompletedOct 2024Feb 2024
Kumar Pratham - F MhadaP52100049685Moshi, Pune53Feb 2023CompletedMar 2024Mar 2024
Priyadarshan - JP52100029119Jai Bhavani Nagar, Pune28Apr 2021CompletedJan 2024Late, Feb 2024
Princeville - A2, C2 and Conv Shop 2P52100018603Moshi, Pune93Nov 2018CompletedJun 2023Jun 2022
Princeville - B4 and B5P52100015685Borhadewadi, Pune92Mar 2018CompletedFeb 2022Jun 2021
Primus - AP52100004518Hadapsar Industrial Estate, Pune-Aug 2017CompletedDec 2021Registered original: Dec 2019Aug 2021
Picasso Phase IIP52100000104Sade Satra Nali, Hadapsar, Pune88Jul 2017CompletedDec 2019Sep 2018
Princeville - B3 and C1P52100000755Pimpri Chinchawad (M Corp.), Pune94Jul 2017CompletedMay 2019Mar 2019

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Peninsula - D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashan13,700+ in Pune

2 kmPeninsula - DCompleted 108Lapsed / revoked 40Other 131Dot size: filed unitsN

Filed coordinates, straight-line distance. 279 registered projects within 2 km.

Builder: Kumar Agro Products Pvt Ltd

Kumar Agro Products Pvt Ltd has 9 registrations on MahaRERA, including Princeville - A2, C2 and Conv Shop 2 and Kumar Pratham - A B C and Shops. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Peninsula - D is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Peninsula - D?

The registered promoter entity is Kumar Agro Products Pvt Ltd, a company as per the filing. Its CIN U45100PN1991PTC064416 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Peninsula - D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Peninsula - D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Peninsula - D?

The professionals named in the filing: Architect: Vishal Deshpande; Engineer: Mahesh Rasal; Engineer: Harshad Pendse; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Peninsula - D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Peninsula - D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Peninsula - D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.