Home / Browse projects / Pune, Maharashtra / Princeville - A2, C2 and Conv Shop 2

Completed No litigation declared Others project

Princeville - A2, C2 and Conv Shop 2

By Kumar Agro Products Pvt Ltd

RG-MH-58340 · RERA P52100018603 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Princeville - A2, C2 and Conv Shop 2 is a Others project by Kumar Agro Products Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100018603 on 22 Nov 2018. The registration is recorded completed; possession was promised by 25 Jun 2023.

At a glance

Project

  • NamePrinceville - A2, C2 and Conv Shop 2
  • TypeOthers
  • Location
    • Moshi Shiv Road
    • Moshi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018603
  • ReraGenie IDRG-MH-58340

Builder

  • NameKumar Agro Products Pvt Ltd
  • Entity typeCompany
  • CINU45100PN1991PTC064416
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsKewalkumar Kesarimal Jain, Ameya Inderkumar Jain
  • Other registrations8 more →
  • Completed8 of 9
  • Declared earlier projects9 →

Key dates

this monthRegisteredNov 2018PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Nov 2018
  • Promised completion25 Jun 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2NA130000
C2NA140000
Conv Shop 2NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Conv Shop 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Closed/Covered67
Open Space22
BuildingClosed/CoveredOpen SpaceTotal
A2281442
C239847

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,339 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7212.37
Proposed, not sanctioned6,162 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society General Thimayya Road, East Street Camp Pune - 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Kumar Agro Products Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2023

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 24_Princeville - A2 C2 and Conv Shop 2.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: 14_230421_Arch Certificate_Form 4.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2.pdf21 Apr 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf21 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13_230421_OC_A2, C2, Conv shop 2.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Jan 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (1).pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
Certificates of CA (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 24_Princeville - A2 C2 and Conv Shop 2.pdf13 Oct 2022
Details of encumbrances concerned to LegalFile: 220722_Encumbrances Certificate_Legal.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2_Disclosure of Sold Inventory.pdf22 Jul 2022
CERSAI detailsFile: 220722_CERSAI Report.pdf22 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 220722_Separate Bank Account Details.pdf22 Jul 2022
Deviation Report with respect to Allotment letterFile: 220722_Deviation Report_Allotment Letter.pdf22 Jul 2022
Deviation Report with respect to model copy of AgreementFile: 220722_Deviation Report_Agreement for Sale.pdf22 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 220512_Form 5_A2 C2 and Conv Shop 2.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf5 May 2022
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2_Disclosure of Sold Inventory_compressed.pdf5 May 2022
Certificates of CA (Form 3)File: 3_CA Certificate.pdf5 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PRINCEVILLE -A2,C2 AND CONV SHOPS 2 - FORM 5_0001.pdf3 Feb 2022
Disclosure of sold/ booked inventoryFile: 7_211012_Princeville - A2 C2 and Conv Shop 2_Disclosure of Sold Inventory.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: 7_Princeville - A2 C2 and Conv Shop 2_Disclosure of Sold Inventory.pdf22 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_CA Certificate_compressed.pdf8 Oct 2021
Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf8 Oct 2021
Declaration about Commencement CertificateFile: 22_Princeville - A2 C2 and Conv Shop 2.pdf7 Oct 2021
Building plan approvalFile: 210331_Building Plan_1_A2.pdf1 Apr 2021
Building plan approvalFile: 210331_Building Plan_1_C2.pdf1 Apr 2021
Building plan approvalFile: 210331_Building Plan_2_A2.pdf1 Apr 2021
Building plan approvalFile: 210331_Building Plan_2_C2.pdf1 Apr 2021
Building plan approvalFile: 210331_Building Plan_3_C2.pdf1 Apr 2021
Layout approvalFile: 210331_Layout_compressed.pdf1 Apr 2021
Copy of Layout Approval (in case of layout)File: 210331_Layout_compressed.pdf1 Apr 2021
Building Plan Approval (IOD)File: 210331_Building Plan_1_A2.pdf1 Apr 2021
Building Plan Approval (IOD)File: 210331_Building Plan_1_C2.pdf1 Apr 2021
Building Plan Approval (IOD)File: 210331_Building Plan_2_A2.pdf1 Apr 2021
Building Plan Approval (IOD)File: 210331_Building Plan_2_C2.pdf1 Apr 2021
Building Plan Approval (IOD)File: 210331_Building Plan_3_C2.pdf1 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: 210331_Commencement Certificate.pdf1 Apr 2021
Proforma of Allotment letterFile: 210331_A2 C2_Agreement for Sale_R2.pdf1 Apr 2021
Copy of the legal title reportFile: 200613_Continuation Title Opinion_compressed.pdf23 Sep 2020
Proforma of Allotment letterFile: 200922_A2 C2_Agreement for Sale_R1.pdf23 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: 200824_Form 4 and Completion Certificate.pdf24 Aug 2020
Annual Audit Report of Statutory CA (Form 5)File: 190920_Form 5_Annual Audit Report.pdf21 Sep 2019
Proforma of Allotment letterFile: 5_Allotment and Agreement For Sale.pdf19 Oct 2018
Declaration in FORM BFile: 6_Form B_Declaration.pdf17 Oct 2018
OtherFile: 14_Self Declaration_R1.pdf17 Oct 2018
Building plan approvalFile: 13_Building Plans_1.pdf10 Oct 2018
Building plan approvalFile: 13_Building Plans_2.pdf10 Oct 2018
Building plan approvalFile: 13_Building Plans_3.pdf10 Oct 2018
Layout approvalFile: 4_Layout.pdf10 Oct 2018
PAN CardFile: 1_Pan Card.pdf10 Oct 2018
Copy of the legal title reportFile: 2_Legal Title_1.pdf10 Oct 2018
Copy of the legal title reportFile: 2_Legal Title_2.pdf10 Oct 2018
Copy of the legal title reportFile: 2_Legal Title_3.pdf10 Oct 2018
Details of encumbrancesFile: 2_Legal Title_3.pdf10 Oct 2018
Copy of Layout Approval (in case of layout)File: 4_Layout.pdf10 Oct 2018
Building Plan Approval (IOD)File: 13_Building Plans_1.pdf10 Oct 2018
Building Plan Approval (IOD)File: 13_Building Plans_2.pdf10 Oct 2018
Building Plan Approval (IOD)File: 13_Building Plans_3.pdf10 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: 12_Commencement Certificate.pdf10 Oct 2018
Certificates of CA (Form 3)File: 8_CA Certificate.pdf10 Oct 2018

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kumar Pratham - A B C and ShopsP52100022486Moshi - Borhadewadi, Pune222Sep 2019CompletedFeb 2025Mar 2024
Peninsula CP52100028012Pashan, Pune44Jan 2021CompletedOct 2024Feb 2024
Kumar Pratham - F MhadaP52100049685Moshi, Pune53Feb 2023CompletedMar 2024Mar 2024
Priyadarshan - JP52100029119Jai Bhavani Nagar, Pune28Apr 2021CompletedJan 2024Late, Feb 2024
Princeville - B4 and B5P52100015685Borhadewadi, Pune92Mar 2018CompletedFeb 2022Jun 2021
Primus - AP52100004518Hadapsar Industrial Estate, Pune-Aug 2017CompletedDec 2021Registered original: Dec 2019Aug 2021
Picasso Phase IIP52100000104Sade Satra Nali, Hadapsar, Pune88Jul 2017CompletedDec 2019Sep 2018
Princeville - B3 and C1P52100000755Pimpri Chinchawad (M Corp.), Pune94Jul 2017CompletedMay 2019Mar 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Princeville - A2, C2 and Conv Shop 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

2 kmPrinceville - A2, C2 andCompleted 76Lapsed / revoked 36Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: Kumar Agro Products Pvt Ltd

Kumar Agro Products Pvt Ltd has 9 registrations on MahaRERA, including Princeville - A2, C2 and Conv Shop 2 and Kumar Pratham - A B C and Shops. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Princeville - A2, C2 and Conv Shop 2 is delayed beyond 25 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Princeville - A2, C2 and Conv Shop 2?

The registered promoter entity is Kumar Agro Products Pvt Ltd, a company as per the filing. Its CIN U45100PN1991PTC064416 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Princeville - A2, C2 and Conv Shop 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Princeville - A2, C2 and Conv Shop 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Princeville - A2, C2 and Conv Shop 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Princeville - A2, C2 and Conv Shop 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Princeville - A2, C2 and Conv Shop 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.