Home / Browse projects / Pune, Maharashtra / NYATI EKAANT I
NYATI EKAANT I
RG-MH-16524 · RERA P52100027858 · Last updated on MahaRERA portal: 24 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 20 months past the filed date
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI EKAANT I is a Residential / Group Housing project by NITIN DWARKADAS NYATI in Pune, Maharashtra, registered with MahaRERA as P52100027858 on 10 Jan 2021. Possession was promised by 28 Feb 2025 and is now 20 months past that date.
At a glance
Project
- NameNYATI EKAANT I
- TypeResidential / Group Housing
- Location
- DHAYARI
- PUNE
- Dhayari (Part)
- Haveli
- 411041
- Pincode411041
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027858
- ReraGenie IDRG-MH-16524
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Jan 2021
- Promised completion28 Feb 2025
- Revised completionNone
- Buildings2 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 39 | 0 | 0 | 0 | 0 |
| WING A | NA | 39 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.
WING B23%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 83% |
| Podiums (if any) | 0% |
| Plinth | 83% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A8%
| Activity | Progress |
|---|---|
| Excavation | 75% |
| Basement (if any) | 9% |
| Podiums (if any) | 0% |
| Plinth | 9% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Swimming Pool | Yes | 0% |
Parking filed360
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| WING B | 180 | 180 |
| WING A | 180 | 180 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjeev Mukund Mehta |
| Architect | A design studio |
| Engineer | JW Consultant LLP |
| Chartered Accountant | Chirag P. Shah & Co |
| Chartered Accountant | Kushal D Jain & Associates |
| Partner | Role in project |
|---|---|
| NITIN DWARKADAS NYATI | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 8803/2021 | BOMBAY HIGH COURT | DISPOSED |
| 2978/2024 | SUPREME COURT OF INDIA | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 24 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 24 Jul 2025 |
| Declaration in FORM BFile: Form B Ekaant.pdf | 9 Jun 2025 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 9 Jun 2025 |
| CERSAI detailsFile: Cersai Undertaking.pdf | 9 Jun 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf | 9 Jun 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement.pdf | 9 Jun 2025 |
| Proforma of Agreement for saleFile: Unit Agreement dt 20012021.pdf | 2 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE signed by NDN.pdf | 31 May 2025 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE signed by NDN.pdf | 31 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NDN Disclouser signed by NDN.pdf | 31 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nyati Ekaant I.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Ekaant I.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nyati Ekaant I.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Ekaant I.pdf | 17 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Ekaant I.pdf | 18 Nov 2021 |
| Layout approvalFile: Layout.pdf | 1 Feb 2021 |
| Layout approvalFile: Layout Phase 8.pdf | 1 Feb 2021 |
| Building plan approvalFile: Basement Parking.pdf | 1 Feb 2021 |
| Building plan approvalFile: Podium 1 Parking.pdf | 1 Feb 2021 |
| Building plan approvalFile: Podium 2 Parking.pdf | 1 Feb 2021 |
| Building plan approvalFile: Podium 3 Parking.pdf | 1 Feb 2021 |
| Building plan approvalFile: Amenity A B.pdf | 1 Feb 2021 |
| Building plan approvalFile: Odd Floor Plan A B.pdf | 1 Feb 2021 |
| Building plan approvalFile: Even Floor Plan A B.pdf | 1 Feb 2021 |
| Building plan approvalFile: Section for A B.pdf | 1 Feb 2021 |
| Building plan approvalFile: Site Sections.pdf | 1 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 1 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Phase 8.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement Parking.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 1 Parking.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 2 Parking.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 3 Parking.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Amenity A B.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Odd Floor Plan A B.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Even Floor Plan A B.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Section for A B.pdf | 1 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Site Sections.pdf | 1 Feb 2021 |
| Proforma of Allotment letterFile: EKAANT I UNIT AGREE 31102020 REVISED 20012021 CLEAN.pdf | 22 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 Dec 2020 |
| PAN CardFile: NITIN NYATI.pdf | 31 Oct 2020 |
| Copy of the legal title reportFile: Certificate of Title Dt 26102020.pdf | 31 Oct 2020 |
| Proforma of Allotment letterFile: EKAANT I UNIT AGREE BY RP 28092020 FINAL 31102020 CLEAN.pdf | 31 Oct 2020 |
| Details of encumbrancesFile: Self Declaration - No Encumbrance.pdf | 30 Oct 2020 |
| Declaration in FORM BFile: Form B - Affidavit Cum Declaration Dt 29102020.pdf | 30 Oct 2020 |
| Building plan approvalFile: Site Section Plan.pdf | 17 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Site Section Plan.pdf | 17 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 9 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 4 Sep 2020 |
| Layout approvalFile: Sanction Layout.pdf | 18 Aug 2020 |
| Layout approvalFile: Sanction Layout 1.pdf | 18 Aug 2020 |
| Building plan approvalFile: A B Wing Odd Floor.pdf | 18 Aug 2020 |
| Building plan approvalFile: A B Wing Even Floor.pdf | 18 Aug 2020 |
| Building plan approvalFile: A B C D Typical Section.pdf | 18 Aug 2020 |
| Building plan approvalFile: Amenity A B.pdf | 18 Aug 2020 |
| Building plan approvalFile: Basement Plan.pdf | 18 Aug 2020 |
| Building plan approvalFile: Podium 1st Floor.pdf | 18 Aug 2020 |
| Building plan approvalFile: Podium 2nd Floor.pdf | 18 Aug 2020 |
| Building plan approvalFile: Podium 3rd Floor.pdf | 18 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf | 18 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: Sanction Layout 1.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A B Wing Odd Floor.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A B Wing Even Floor.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: A B C D Typical Section.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Amenity A B.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement Plan.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 1st Floor.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 2nd Floor.pdf | 18 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Podium 3rd Floor.pdf | 18 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 18 Aug 2020 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| NYATI ELITEP52100045651 | UNDRI VILLAGE, Pune | - | May 2022 | Certificate Signed | Jun 2024 | Jun 2024 |
| NYATI ELYSIA VP52100027025 | KHARADI | - | Nov 2020 | Certificate Signed | Sep 2023 | Sep 2023 |
| NYATI ELYSIA IVP52100021738 | KHARADI | - | Jul 2019 | Certificate Signed | Sep 2023 | Sep 2023 |
| NYATI ELYSIA IIIP52100021737 | KHARADI | - | Jul 2019 | Certificate Signed | Mar 2023 | Mar 2023 |
| NYATI ELYSIA IIP52100018643 | KHARADI | - | Nov 2018 | Certificate Signed | Mar 2023 | Mar 2023 |
| NYATI ELYSIA IP52100000860 | KHARADI | - | Jul 2017 | Certificate Signed | Mar 2022 | Mar 2022 |
| NYATI KALEIDOSCOPE IIP52100018178 | KHARADI | - | Oct 2018 | Certificate Signed | Mar 2019 | Mar 2019 |
| NYATI KALEIDOSCOPE IP52100017920 | KHARADI | - | Sep 2018 | Certificate Signed | Mar 2019 | Mar 2019 |
| Nyati Eternity IV | UNDRI PUNE | 104 | - | Completed | Jan 2018 | Jan 2017 |
| Nyati Eternity II | UNDRI PUNE | 195 | - | Completed | Dec 2016 | Late, Jan 2017 |
| Nyati Eternity I | UNDRI PUNE | 184 | - | Completed | Jun 2016 | Oct 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NYATI EKAANT I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Filed coordinates, straight-line distance. 109 registered projects within 2 km.
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: NITIN DWARKADAS NYATI
NITIN DWARKADAS NYATI has 12 registrations on MahaRERA, including NYATI ELYSIA I and NYATI ETERNITY COMMERCIAL I. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that NYATI EKAANT I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NYATI EKAANT I is delayed beyond 28 Feb 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI EKAANT I?
The registered promoter entity is NITIN DWARKADAS NYATI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI EKAANT I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NYATI EKAANT I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI EKAANT I?
The professionals named in the filing: Architect: Sanjeev Mukund Mehta; Architect: A design studio; Engineer: JW Consultant LLP; Chartered Accountant: Chirag P. Shah & Co; Chartered Accountant: Kushal D Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI EKAANT I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.