Home / Browse projects / Pune, Maharashtra / MAITREE MEGA CITY

Registered No litigation declared Mixed project

MAITREE MEGA CITY

By MAITREE INFRA

RG-MH-92474 · RERA P52100055000 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
11 of 31Construction stages doneacross 3 buildings; furthest along: Plinth, 95%
208 of 312Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

MAITREE MEGA CITY is a Mixed project by MAITREE INFRA in Pune, Maharashtra, registered with MahaRERA as P52100055000 on 26 Feb 2024. Possession is promised by 31 Dec 2027. 104 of the 312 units on this registration are recorded sold or booked, and 11 of 31 construction stages are filed complete.

At a glance

Project

  • NameMAITREE MEGA CITY
  • TypeMixed
  • Location
    • 105/5/1 AND 105/2A/3 RAYKAR MALA DHAYARI
    • DHAYARI
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100055000
  • ReraGenie IDRG-MH-92474

Builder

  • NameMAITREE INFRA
  • Entity typePartnership
  • PartnersDADASHAEB NAMDEO BHURUK, TUSHAR CHANDRAKANT POKHALE, MONALI DIPAK HOLE, POONAM RAHUL WANJALE, SANDEEP LAXMAN WANJALE, SHANTARAM LAXMAN LAVANDE, ANIL ANANDRAO UNDE, RAMESHWAR NIVRUTTI MULEY, VIKRAM VINAYAKRAO PATIL, PRAKASH HINDURAO TALAP, RASHMI DEVI, ASHOK IRRAPPA BHANADARI and 5 more

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed97 files

Current status

33%104 of 312 units booked
46.8%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA13121190119
2NA141296096
3NA1312871097

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 31 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 95%.

183%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure13%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
320%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth65%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNo0%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered74
Open Space6
Podiums / Upper Parking Floor8
BuildingClosed/CoveredOpen SpacePodiums / Upper Parking FloorTotal
17007
2490049
3186832

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025
LandownerVillageDistrict
Sandip Kailas RaikarDhayari (Part)Pune

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI19245.65
Proposed, not sanctioned17,006 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR JAY RAJ HOME NEAR NAVLE HOSIPTAL ROAD NARHE PUNE MAHARASHTRA -411041
Estimated costRs 65.44 cr
Cost incurredRs 30.64 cr
Work done46.82%
BuildingWingEstimatedIncurred
1NARs 27.94 crRs 27.94 cr
2NARs 12.50 crRs 65.00 lakh
3NARs 12.50 crRs 1.25 cr
-NARs 12.50 crRs 80.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDATTATRAY PARSHURAM
ArchitectARCH VIEW ASSOCIATES
EngineerSATISH BODARE
Chartered AccountantKRISHNAKANT AGRAWAL
Chartered AccountantSHWETA AGRAWAL
PartnerRole in project
MAITREE INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1-Q4-25-26.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2-Q4-25-26.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3-Q4-25-26.pdf21 Apr 2026
Withdrawal Update Form 1File: ARCHITECT-Q3.pdf19 Feb 2026
Withdrawal Update Form 2File: ENGINEER-Q2.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf19 Feb 2026
Withdrawal Update Form 1File: ARCHITECT-Q2.pdf24 Nov 2025
Withdrawal Update Form 2File: ENGINEER-Q2.pdf24 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf24 Nov 2025
Form 1File: Architectcertificate-Q4.pdf30 Jul 2025
Form 2File: ENGINEER-Q4.pdf30 Jul 2025
Form 3File: FORM 3-Q4.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD-Q4.pdf30 Jul 2025
Withdrawal Update Form 1File: ARCHITECT-Q1.pdf30 Jul 2025
Withdrawal Update Form 2File: ENGINEER-Q1.pdf30 Jul 2025
Withdrawal Update Form 3File: FORM 3-Q1-25-26.pdf30 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf30 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf30 Jul 2025
Building plan approvalFile: 2.pdf19 Jun 2025
Building plan approvalFile: 5.pdf19 Jun 2025
Building plan approvalFile: 8.pdf19 Jun 2025
Layout approvalFile: 1.pdf5 Jun 2025
Building plan approvalFile: 3.pdf5 Jun 2025
Building plan approvalFile: 4.pdf5 Jun 2025
Building plan approvalFile: 6.pdf5 Jun 2025
Building plan approvalFile: 7.pdf5 Jun 2025
Building plan approvalFile: 9.pdf5 Jun 2025
Building plan approvalFile: 10.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectcertificate-Q4.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-Q4.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER-Q4.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-Q4.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectcertificate-Q3.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q3.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: Soldunsold.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT-Q1.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER-Q1.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE REPORT.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-Q.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate-Q4.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE-Q4.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNER CERTIFICATE.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold q-4.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf22 Apr 2024
Layout approvalFile: Building Plan 2 to 5.pdf19 Feb 2024
Layout approvalFile: Building Plan 6 to 9.pdf19 Feb 2024
Layout approvalFile: Building Plan 10 to 14.pdf19 Feb 2024
Copy of the legal title reportFile: 1 Copy of the legal title report maitreeinfra.pdf19 Feb 2024
Copy of Layout Approval (in case of layout)File: Building Plan 2 to 5.pdf19 Feb 2024
Copy of Layout Approval (in case of layout)File: Building Plan 6 to 9.pdf19 Feb 2024
Copy of Layout Approval (in case of layout)File: Building Plan 10 to 14.pdf19 Feb 2024
Declaration about Commencement CertificateFile: Format D.pdf19 Feb 2024
Other - FinanceFile: 2 Other - Technical.pdf19 Feb 2024
Other - TechnicalFile: CC Mail Screen Print.pdf19 Feb 2024
Layout approvalFile: Updated layout 16022024.pdf16 Feb 2024
Copy of Layout Approval (in case of layout)File: Updated layout 16022024.pdf16 Feb 2024
Other - LegalFile: Agreement 1 Part 1.pdf10 Feb 2024
Other - LegalFile: Agreement 1 Part 2.pdf10 Feb 2024
Other - LegalFile: Agreement 1 Part 3.pdf10 Feb 2024
Other - LegalFile: Agreement 2.pdf10 Feb 2024
Other - LegalFile: Agreement 3.pdf10 Feb 2024
Other - LegalFile: Agreement 4 Part 1.pdf10 Feb 2024
Other - LegalFile: Agreement 4 Part 2.pdf10 Feb 2024
Other - LegalFile: Agreement 5 Part 1.pdf10 Feb 2024
Other - LegalFile: Agreement 5 Part 2.pdf10 Feb 2024
Details of encumbrances concerned to FinanceFile: legal encumberence.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: legal encumberence.pdf7 Feb 2024

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAITREE MEGA CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAYARI13,700+ in Pune

Builder: MAITREE INFRA

MAITREE INFRA has 1 registration on MahaRERA, including MAITREE MEGA CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAITREE MEGA CITY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAITREE MEGA CITY?

The registered promoter entity is MAITREE INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAITREE MEGA CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAITREE MEGA CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAITREE MEGA CITY?

The professionals named in the filing: Architect: DATTATRAY PARSHURAM; Architect: ARCH VIEW ASSOCIATES; Engineer: SATISH BODARE; Chartered Accountant: KRISHNAKANT AGRAWAL; Chartered Accountant: SHWETA AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAITREE MEGA CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAITREE MEGA CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAITREE MEGA CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.