Metropolis - Insignia Towers

By ANANT SQUARE

RG-MH-28677 · RERA P51700026750 · Last updated on MahaRERA portal: 16 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
60 of 250Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Metropolis - Insignia Towers is a Others project by ANANT SQUARE in Thane, Maharashtra, registered with MahaRERA as P51700026750 on 22 Oct 2020. Possession was promised by 14 Apr 2026 and is now 6 months past that date. 190 of the 250 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameMetropolis - Insignia Towers
  • TypeOthers
  • Location
    • Ghodbunder Rd
    • Kasarvadavli
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700026750
  • ReraGenie IDRG-MH-28677

Builder

  • NameANANT SQUARE
  • Entity typeOthers
  • Named personsAnant Estates, Squarefeet Land Developers LLP
  • Other registrations8 more →
  • Completed6 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

6 months past promisethis monthRegisteredOct 2020PromisedApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Oct 2020
  • Promised completion14 Apr 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed92 files

Current status

76%190 of 250 units booked

Figures as on 16 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA27261196125
Building BNA27261196125

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

Building A64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities20

As on 16 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Open sit outYes0%
Kids Play AreaYes0%
Indoor gamesYes0%
Fitness CenterYes0%
CCTV in Entrance LobbyYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,695 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI18849.89
Proposed, not sanctioned18,848 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThane west

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTen Folds Architects & Consultants
EngineerAjay Mahale
Chartered AccountantAmit Biyani
PartnerRole in project
ANANT SQUARE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_ Architect_Certificate_June_2025.pdf16 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA_Certificate_2025_compressed.pdf16 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Engineering_Certificate_June_2025.pdf16 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Engineering_Certificate_June_2025.pdf16 Jul 2025
Disclosure of sold/ booked inventoryFile: Insignia Disclosure_June_2025_compressed.pdf16 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-01-2024_compressed.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-04-2024_compressed.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-07-2024_compressed.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-10-2024_compressed.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-01-2025_compressed.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ 01-04-2025_compressed.pdf6 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-01-2022.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_02-10-2023.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-10-2024.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-10-2021.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-07-2024.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-07-2023.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-04-2025.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-04-2024.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-04-2021.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-04-2021.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-01-2025.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-01-2024.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Insignia_Form-1_01-01-2021.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Insignia_Form-3_31-12-2024_compressed.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Insignia_Form-3_31-03-2024_compressed.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Insignia_Form-3_30-06-2024_compressed.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Insignia_Form-3_30-09-2024_compressed.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Insignia_Form-3_31-03-2025_compressed.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Insignia 30-06-2024_compressed.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Insignia 30-09-2024_compressed.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Insignia 31-12-2024_compressed.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Insigina 31-03-2025_compressed.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June_2021_Insignia_Architect_certificate.pdf18 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Form 3_Sept_2022_compressed.pdf18 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June_2021_Insignia_CA_certificate_Form_3.pdf18 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June_2021_Insignia_Engineer_certificate.pdf18 May 2025
Disclosure of sold/ booked inventoryFile: June_2021_Insignia_Sold_Unsold_Disclosure.pdf18 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf20 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 30-04-2021.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 15-05-2022.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 28-04-2023.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 05-06-2024.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Insignia Form 5_FY23-24.pdf23 Nov 2024
Layout approvalFile: MYSCAN_20240318_0002_compressed (1).pdf12 Nov 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20240318_0002_compressed (1).pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Metropolis Insignia Towers-Annual Report SOA.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Oct to Dec 2022_compressed.pdf22 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Jan to Mar 2023_compressed.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Oct to Dec 2022_compressed.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Jan to Mar 2023_compressed.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: insignia sold unsold Oct to Dec 2022_compressed.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: insignia sold unsold Jan to Mar 2023_compressed.pdf22 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Oct to Dec 2022_compressed.pdf22 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Jan to Mar 2023_compressed.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report on statement of accounts_Insignia 1st April 2021 To 31st March 2022.pdf22 Apr 2023
Building plan approvalFile: Plan copy_compressed.pdf16 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan copy_compressed.pdf16 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf16 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20230416175952.pdf16 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report on statement accounts insignia 22nd oct 2020 to 31st March 2021.pdf15 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Insignia _Mahale_ Engineer's Certificate.pdf20 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Insignia _Mahale_ Engineer's Certificate.pdf20 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-compressed.pdf14 Oct 2020
Layout approvalFile: Layout.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0002.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0003.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0004.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0005.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0006.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0007.PDF13 Oct 2020
Building plan approvalFile: MYSCAN_20201007_0008.PDF13 Oct 2020
PAN CardFile: ANANT SQUARE PAN CARD-converted.pdf13 Oct 2020
Copy of the legal title reportFile: 4-4 Title certificate-merged-compressed.pdf13 Oct 2020
Details of encumbrancesFile: DESCRIPTION OF ENCUMBRANCE.pdf13 Oct 2020
Copy of Layout Approval (in case of layout)File: Layout.PDF13 Oct 2020

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Metropolis - Aquaris Phase 2P51700022959Kasarvadavli, Thane-Nov 2019CompletedSep 2025Nov 2023
Metropolis - RIVERAP51700022700Kasarvadavali, Thane-Oct 2019CompletedMar 2025Oct 2022
Metropolis - Aquaris Phase 1P51700022961Kasarvadavli, Thane-Nov 2019CompletedSep 2024May 2022
ACE SQUARE PHASE 2P51700009878Kasarvadavli, Thane-Aug 2017CompletedJun 2024Jun 2022
Joy SquareKasarvadavli GB Rd Thane-W112-CompletedDec 2019May 2019
Ace Square Phase 1Kasarvadavli GB Rd Thane-W145-CompletedDec 2017Oct 2017

How this compares with Thane

76%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Metropolis - Insignia Towers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasarvadavli7,600+ in Thane

2 kmMetropolis - Insignia ToCompleted 82Lapsed / revoked 22Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 152 registered projects within 2 km.

Builder: ANANT SQUARE

ANANT SQUARE has 9 registrations on MahaRERA, including Joy Square and ACE SQUARE PHASE 1. Its filings disclose 11 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Metropolis - Insignia Towers shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Metropolis - Insignia Towers is delayed beyond 14 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Metropolis - Insignia Towers?

The registered promoter entity is ANANT SQUARE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Metropolis - Insignia Towers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Metropolis - Insignia Towers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Metropolis - Insignia Towers?

The professionals named in the filing: Architect: Ten Folds Architects & Consultants; Engineer: Ajay Mahale; Chartered Accountant: Amit Biyani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Metropolis - Insignia Towers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Metropolis - Insignia Towers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Metropolis - Insignia Towers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.