ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Mango Lakefront Paradise Guhagar

Registered No litigation declared Residential / Group Housing project

Mango Lakefront Paradise Guhagar

By Samir Shrinivas Kale

RG-MH-50492 · RERA P52800080958 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Feb 2035Possession promisedno revision filed
11 of 682Construction stages doneacross 62 buildings; furthest along: Plinth, 80%
62 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Mango Lakefront Paradise Guhagar is a Residential / Group Housing project by Samir Shrinivas Kale in Ratnagiri, Maharashtra, registered with MahaRERA as P52800080958 on 1 Sep 2025. Possession is promised by 28 Feb 2035. 0 of the 62 units on this registration are recorded sold or booked, and 11 of 682 construction stages are filed complete.

At a glance

Project

  • NameMango Lakefront Paradise Guhagar
  • TypeResidential / Group Housing
  • Location
    • Modkagar Dam Road
    • Kondwadi
    • Kondwadi Tarfe Patpanhale
    • Guhagar
    • Ratnagiri
    • 415703
  • Pincode415703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800080958
  • ReraGenie IDRG-MH-50492

Builder

  • NameSamir Shrinivas Kale
  • Entity typeIndividual
  • Other registrations37 more →
  • Completed32 of 38
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects36 →

Key dates

this monthRegisteredSep 2025PromisedFeb 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion28 Feb 2035
  • Revised completionNone
  • Buildings62 building records
  • Documents filed51 files

Current status

0%0 of 62 units booked
2.9%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow No 1BNA11101
Bungalow No 2BNA11101
Bungalow No 3DNA11101
Bungalow No 4CNA11101
Bungalow No 5CNA11101
Bungalow No 6DNA11101
Bungalow No 7ANA22101
Bungalow No 8ANA22101
Bungalow No 9DNA11101
Bungalow No 10DNA11101
Bungalow No 11DNA11101
Bungalow No 12ANA22101
Bungalow No 13BNA11101
Bungalow No 42CNA11101
Bungalow No 43CNA11101
Bungalow No 45CNA11101
Bungalow No 46CNA11101
Bungalow No 47CNA11101
Bungalow No 48CNA11101
Bungalow No 49DNA11101
Bungalow No 50CNA11101
Bungalow No 51CNA11101
Bungalow No 52DNA11101
Bungalow No 53DNA11101
Bungalow No 54CNA11101
Bungalow No 55DNA11101
Bungalow No 56CNA11101
Bungalow No 57DNA11101
Bungalow No 58DNA11101
Bungalow No 59DNA11101
Bungalow No 60DNA11101
Bungalow No 61DNA11101
Bungalow No 62DNA11101
Bungalow No 63DNA11101
Bungalow No 64CNA11101
Bungalow No 14BNA11101
Bungalow No 15CNA11101
Bungalow No 16CNA11101
Bungalow No 17CNA11101
Bungalow No 18CNA11101
Bungalow No 19CNA11101
Bungalow No 20CNA11101
Bungalow No 21BNA11101
Bungalow No 22BNA11101
Bungalow No 23BNA11101
Bungalow No 24BNA11101
Bungalow No 25DNA11101
Bungalow No 26DNA11101
Bungalow No 27CNA11101
Bungalow No 28CNA11101
Bungalow No 29CNA11101
Bungalow No 30CNA11101
Bungalow No 31DNA11101
Bungalow No 32CNA11101
Bungalow No 33CNA11101
Bungalow No 34CNA11101
Bungalow No 35CNA11101
Bungalow No 36CNA11101
Bungalow No 37CNA11101
Bungalow No 39BNA11101
Bungalow No 40CNA11101
Bungalow No 41CNA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 62 buildings; the table lists the first 20.

11 of 682 construction stages are filed complete across 62 buildings. The stage furthest along is Plinth, at 80%.

Bungalow No 1B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 2B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 3D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 4C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 5C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 6D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 7A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 8A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 9D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 10D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 11D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 12A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 13B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 42C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 43C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 45C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 46C16%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 47C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 48C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 49D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Open Space62
BuildingOpen SpaceTotal
Bungalow No 1B11
Bungalow No 2B11
Bungalow No 3D11
Bungalow No 4C11
Bungalow No 5C11
Bungalow No 6D11
Bungalow No 7A11
Bungalow No 8A11
Bungalow No 9D11
Bungalow No 10D11
Bungalow No 11D11
Bungalow No 12A11
Bungalow No 13B11
Bungalow No 42C11
Bungalow No 43C11
Bungalow No 45C11
Bungalow No 46C11
Bungalow No 47C11
Bungalow No 48C11
Bungalow No 49D11
Bungalow No 50C11
Bungalow No 51C11
Bungalow No 52D11
Bungalow No 53D11
Bungalow No 54C11
Bungalow No 55D11
Bungalow No 56C11
Bungalow No 57D11
Bungalow No 58D11
Bungalow No 59D11
Bungalow No 60D11
Bungalow No 61D11
Bungalow No 62D11
Bungalow No 63D11
Bungalow No 64C11
Bungalow No 14B11
Bungalow No 15C11
Bungalow No 16C11
Bungalow No 17C11
Bungalow No 18C11
Bungalow No 19C11
Bungalow No 20C11
Bungalow No 21B11
Bungalow No 22B11
Bungalow No 23B11
Bungalow No 24B11
Bungalow No 25D11
Bungalow No 26D11
Bungalow No 27C11
Bungalow No 28C11
Bungalow No 29C11
Bungalow No 30C11
Bungalow No 31D11
Bungalow No 32C11
Bungalow No 33C11
Bungalow No 34C11
Bungalow No 35C11
Bungalow No 36C11
Bungalow No 37C11
Bungalow No 39B11
Bungalow No 40C11
Bungalow No 41C11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area18,927 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Sep 2025

Approvals and building plan

Sanctioning authoritySDO - CHIPLUN SUB DIVISION, DISTRICT: RATNAGIRI
Permissible FSI5396.42
Proposed, not sanctioned5,396 sq m
Buildings approved66
Buildings sanctioned62

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHESH DARSHAN, NEAR MAKHALI TALAO, OLD MUMBAI-AGRA ROAD, THANE 400601
Estimated costRs 14.15 cr
Cost incurredRs 40.98 lakh
Work done2.9%
BuildingWingEstimatedIncurred
-NARs 1.50 crRs 17.44 lakh
Bungalow No 12ANARs 49.86 lakh-
Bungalow No 7ANARs 49.86 lakh-
Bungalow No 8ANARs 49.86 lakh-
Bungalow No 1BNARs 24.93 lakh-
Bungalow No 2BNARs 24.93 lakh-
Bungalow No 13BNARs 24.93 lakh-
Bungalow No 14BNARs 24.93 lakh-
Bungalow No 21BNARs 24.93 lakh-
Bungalow No 22BNARs 24.93 lakh-
Bungalow No 23BNARs 24.93 lakh-
Bungalow No 24BNARs 24.93 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Kulkarni
ArchitectSANJAY SADANAND KULKARNI
EngineerSkyline Associates
EngineerAMEY SHINDE
Chartered AccountantKamdar Desai & Patel LLP Chartered Accountants
Chartered AccountantKamdar Desai and Patel LLP
PartnerRole in project
Samir Shrinivas Kale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2035

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Mango Lakefront Paradise Guhagar 160426.pdf20 Apr 2026
Withdrawal Update Form 2File: Form No 2 Mango Lakefront Paradise Guhagar 200426.pdf20 Apr 2026
Withdrawal Update Form 3File: Form No 3 Mango Lakefront Paradise Guhagar 170426.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Lakefront Paradise 130126.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Lakefront Paradise 170126.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Lakefront Paradise 190126.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 300925.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 300925.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 300925.pdf26 Nov 2025
Other - LegalFile: कोंडवाडी तर्फे पाटपन्हाळे 53 5 -Satbara.pdf14 Aug 2025
Other - TechnicalFile: Clarification regarding scrutiny status.pdf23 Jul 2025
Other - LegalFile: Declaration regarding Survey No.pdf21 Jul 2025
Other - TechnicalFile: Declaration regarding Survey No.pdf21 Jul 2025
Other - TechnicalFile: CC Confirmation Screenshot .pdf11 Jul 2025
Other - TechnicalFile: Declaration - 28062025.pdf28 Jun 2025
Other - TechnicalFile: CC confirmation email.pdf28 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Proforma of AFS - Deviation Report.pdf16 Jun 2025
Proforma of Agreement for saleFile: Proforma of AFS.pdf16 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 May 2025
Other - LegalFile: कोंडवाडी तर्फे पाटपन्हाळे 53 ब 3.pdf31 May 2025
Other - LegalFile: कोंडवाडी तर्फे पाटपन्हाळे 53 ब 1.pdf31 May 2025
Other - LegalFile: कोंडवाडी तर्फे पाटपन्हाळे 53 ब 2.pdf31 May 2025
Other - LegalFile: Sale Deed 2.pdf30 May 2025
Other - LegalFile: Sale Deed 1.pdf30 May 2025
Other - TechnicalFile: Declaration cum Undertaking - Annexure A.pdf17 Apr 2025
Layout approvalFile: Sanctioned Plan P1 - Marked.pdf15 Apr 2025
Layout approvalFile: Sanctioned Paln P2.PDF15 Apr 2025
Building plan approvalFile: Sanctioned Plan P1 - Marked.pdf15 Apr 2025
PAN CardFile: Samir Kale pan card.pdf15 Apr 2025
Copy of the legal title reportFile: Legal Title Report - Format A.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Declaration_Encumbrances concerned to Finance.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Declaration_Encumbrances concerned to Legal.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Sanctioned Plan P1 - Marked.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Sanctioned Paln P2.PDF15 Apr 2025
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf15 Apr 2025
Declaration in FORM BFile: Form B.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Sanctioned Paln P2.PDF15 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan P1 - Marked.pdf15 Apr 2025
Declaration about Commencement CertificateFile: Declaration about CC - Format D.pdf15 Apr 2025
CERSAI detailsFile: CERSAI Undertaking.pdf15 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA designated bank accounts - Format A.pdf15 Apr 2025
Deviation Report with respect to Allotment letterFile: Proforma of Allotment Letter - Deviation Report.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Declaration_Encumbrances concerned to Finance.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Declaration_Encumbrances concerned to Legal.pdf15 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in any other real estate organisation.pdf15 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Opening of RERA designated Bank Accounts- Format B.pdf15 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf15 Apr 2025

Promoter's earlier projects36

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

30 delivered on promise1 not delivered by the promised date5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mango Lakeview GuhagarP52800054932Guhagar, Ratnagiri24Feb 2024OngoingSep 2029Not due yet
MHVG Bungalow No 86P52800079696Kirtanwadi, Ratnagiri1Mar 2025OngoingSep 2027Not due yet
MHVG Bungalow No 105P52800079596Kirtanwadi, Ratnagiri1Mar 2025OngoingAug 2027Not due yet
MHVG Bungalow No 91P52800079665Kirtanwadi, Ratnagiri1Mar 2025OngoingJun 2027Not due yet
Mango Lakefront Paradise Guhagar Bungalow No 38P52800077206Kondwadi, Ratnagiri1Jul 2024OngoingNov 2026Not due yet
Mango Holiday Village Guhagar Bungalow No 109P52800066569Kirtanwadi, Ratnagiri1Jun 2024CompletedOct 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 101P52800056232Kirtanwadi, Ratnagiri-May 2024CompletedAug 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 104P52800052815Kirtanwadi, Ratnagiri-Oct 2023Certificate SignedFeb 2026Nov 2024
Mango Holiday Village Guhagar Bungalow No 107P52800052799Kirtanwadi, Ratnagiri1Oct 2023CompletedJan 2026Feb 2025
Mango Holiday Village Guhagar Bungalow No 108P52800051905Kirtanwadi, Ratnagiri-Jul 2023CompletedDec 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 90P52800051906Kirtanwadi, Ratnagiri-Jul 2023CompletedNov 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 92P52800050804Kirtanwadi, Ratnagiri-May 2023CompletedSep 2025Feb 2024
Harikunj EnclaveP51700047799Brahman Society, Naupada, Thane29Nov 2022OngoingAug 2025Not delivered
Mango Holiday Village Guhagar Bungalow No 56P52800049406Kirtanwadi, Ratnagiri-Feb 2023CompletedDec 2024Feb 2024
Mango Holiday Village Guhagar Bungalow No 87P52800045443Kirtanwadi, Ratnagiri-May 2022CompletedMay 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 96P52800033522Kirtanwadi, Ratnagiri-Feb 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 88P52800033586Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 106P52800034745Kirtanwadi, Ratnagiri-Apr 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 100P52800034054Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Pranav EnclaveP51700024548Naupada, Hindu Colony, Thane-Feb 2020CompletedMar 2024Mar 2022
Mango Holiday Village Guhagar Bungalow No 95P52800032945Kirtanwadi, Ratnagiri-Feb 2022CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 94P52800032054Kirtanwadi, Ratnagiri-Dec 2021CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 27P52800031199Kirtanwadi, Ratnagiri-Oct 2021CompletedOct 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 98P52800028597Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Dec 2021
Mango Holiday Village Guhagar - Bungalow No 2P52800028581Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 102P52800030532Kirtanwadi, Ratnagiri-Aug 2021CompletedMay 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 99P52800029127Kirtanwadi, Ratnagiri-Apr 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 97P52800029172Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 41P52800029170Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village, Guhagar - Bungalow No 6P52800024075Kirtanwadi, Ratnagiri-Jan 2020CompletedDec 2022Feb 2021
Mango Holiday Village, Guhagar - Bungalow No 3P52800028056Opposite Government Rest house, Ratnagiri-Jan 2021CompletedNov 2022Dec 2021
Mango Holiday Village, Guhagar - Bungalow No 54P52800021888Kirtanwadi, Ratnagiri-Aug 2019CompletedAug 2022Jul 2021
Mango Holiday Village, Guhagar - Bungalow No 103P52800026667Kirtanwadi, Ratnagiri-Oct 2020CompletedJun 2022Jul 2021
Mango Holiday Village Guhagar Bungalow No 42 and 93P52800020526Kirtanwadi, Ratnagiri-Apr 2019CompletedApr 2022Dec 2020
Mango Holiday Village, Guhagar - Phase 4P52800003399Kirtanwadi Tarf Guhagar, Ratnagiri-Aug 2017CompletedJan 2021Registered original: Jan 2020Feb 2019
Mango Holiday Village GuhagarKirtanwadi Road Opp Government Rest House Guhagar Dist Ratnagiri 41570362-CompletedMar 2017Mar 2017

How this compares with Ratnagiri

0%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Mango Lakefront Paradise Guhagar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondwadi1,100+ in Ratnagiri

Builder: Samir Shrinivas Kale

Samir Shrinivas Kale has 38 registrations on MahaRERA, including Mango Holiday Village, Guhagar - Phase 4 and Mango Heritage. Its filings disclose 36 earlier MahaRERA projects: declares 30 of 30 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Mango Lakefront Paradise Guhagar is delayed beyond 28 Feb 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Lakefront Paradise Guhagar?

The registered promoter entity is Samir Shrinivas Kale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Lakefront Paradise Guhagar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Lakefront Paradise Guhagar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Lakefront Paradise Guhagar?

The professionals named in the filing: Architect: Sanjay Kulkarni; Architect: SANJAY SADANAND KULKARNI; Engineer: Skyline Associates; Engineer: AMEY SHINDE; Chartered Accountant: Kamdar Desai & Patel LLP Chartered Accountants; Chartered Accountant: Kamdar Desai and Patel LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Lakefront Paradise Guhagar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Lakefront Paradise Guhagar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Lakefront Paradise Guhagar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.