ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Mango Lakefront Paradise Guhagar Bungalow No 38

Registered No litigation declared Residential / Group Housing project

Mango Lakefront Paradise Guhagar Bungalow No 38

By Samir Shrinivas Kale

RG-MH-18428 · RERA P52800077206 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 80%
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Mango Lakefront Paradise Guhagar Bungalow No 38 is a Residential / Group Housing project by Samir Shrinivas Kale in Ratnagiri, Maharashtra, registered with MahaRERA as P52800077206 on 29 Jul 2024. Possession is promised by 30 Nov 2026. 1 of the 1 unit on this registration is recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMango Lakefront Paradise Guhagar Bungalow No 38
  • TypeResidential / Group Housing
  • Location
    • Modkagar Dam Road
    • Kondwadi
    • Kondwadi Tarfe Patpanhale
    • Guhagar
    • Ratnagiri
    • 415703
  • Pincode415703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800077206
  • ReraGenie IDRG-MH-18428

Builder

  • NameSamir Shrinivas Kale
  • Entity typeIndividual
  • Other registrations37 more →
  • Completed32 of 38
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects36 →

Key dates

this monthRegisteredJul 2024PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2024
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Current status

100%1 of 1 units booked
104.1%Work done, per cost certificate

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow No 38 BNA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Bungalow No 38 B: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Open Space2

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area460 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on11 Jun 2025

Approvals and building plan

Sanctioning authoritySDO CHIPLUN
Permissible FSI106.45
Proposed, not sanctioned106 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMahesh Darshan, Old Mumbai Agra Road, near Makhamali Talao, Thane 400602
Estimated costRs 32.00 lakh
Cost incurredRs 33.31 lakh
Work done104.08%
BuildingWingEstimatedIncurred
Bungalow No 38 BNARs 27.00 lakhRs 29.31 lakh
-NARs 5.00 lakhRs 4.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Kulkarni
ArchitectSANJAY SADANAND KULKARNI
EngineerManoj Joshi
EngineerAMEY SHINDE
Chartered AccountantKamdar Desai Patel Chartered Accountants
Chartered AccountantKamdar Desai and Patel LLP
PartnerRole in project
Samir Shrinivas Kale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - B No 38 - 030426.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 - B No 38 - 070426.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 - B No 38 090426.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1 B No 38 130126.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 B No 38 160126.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 B No 38 160126.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1 Lakefront-38-30-09-2025.pdf1 Nov 2025
Withdrawal Update Form 2File: Form 2 Lakefront-38-30-09-2025.pdf1 Nov 2025
Withdrawal Update Form 3File: Form 3 Lakefront-38-30-09-2025.pdf1 Nov 2025
Form 1File: Form 1 - 310325.pdf21 Jun 2025
Form 2File: Form 2 - 310325.pdf21 Jun 2025
Form 3File: Form 3 - 310325.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold, Unsold, Booked Inventary - 31032025.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanctioned Plan P1.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanctioned Plan P2.pdf20 Jul 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf20 Jul 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf18 Jul 2024
Other - TechnicalFile: Declaration cum Undertaking Annexure A.pdf18 Jul 2024
Other - TechnicalFile: Screen shot of email sent by competative authority.pdf18 Jul 2024
Layout approvalFile: Approved Plan P1.pdf2 Jun 2024
Layout approvalFile: Approved Plan P2.pdf2 Jun 2024
Building plan approvalFile: Approved Plan P1.pdf2 Jun 2024
Building plan approvalFile: Approved Plan P2.pdf2 Jun 2024
PAN CardFile: Samir Kale pan card.pdf2 Jun 2024
Copy of the legal title reportFile: Legal Title Report - Format A.pdf2 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Finance.pdf2 Jun 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances- Legal.pdf2 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Finance.pdf2 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances- Legal.pdf2 Jun 2024
Copy of Layout Approval (in case of layout)File: Approved Plan P1.pdf2 Jun 2024
Copy of Layout Approval (in case of layout)File: Approved Plan P2.pdf2 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan P1.pdf2 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan P2.pdf2 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Jun 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf2 Jun 2024
Declaration in FORM BFile: Form B.pdf2 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Jun 2024
CERSAI detailsFile: CERSAI Undertaking.pdf2 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate project.pdf2 Jun 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf2 Jun 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf2 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf2 Jun 2024
Deviation Report with respect to Allotment letterFile: Proforma of Allotment Letter - Deviation report.pdf2 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Proforma of AFS - Deviation report.pdf2 Jun 2024
Other - TechnicalFile: Declaration about plot area.pdf2 Jun 2024

Promoter's earlier projects35

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

30 delivered on promise1 not delivered by the promised date4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mango Lakeview GuhagarP52800054932Guhagar, Ratnagiri24Feb 2024OngoingSep 2029Not due yet
MHVG Bungalow No 86P52800079696Kirtanwadi, Ratnagiri1Mar 2025OngoingSep 2027Not due yet
MHVG Bungalow No 105P52800079596Kirtanwadi, Ratnagiri1Mar 2025OngoingAug 2027Not due yet
MHVG Bungalow No 91P52800079665Kirtanwadi, Ratnagiri1Mar 2025OngoingJun 2027Not due yet
Mango Holiday Village Guhagar Bungalow No 109P52800066569Kirtanwadi, Ratnagiri1Jun 2024CompletedOct 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 101P52800056232Kirtanwadi, Ratnagiri-May 2024CompletedAug 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 104P52800052815Kirtanwadi, Ratnagiri-Oct 2023Certificate SignedFeb 2026Nov 2024
Mango Holiday Village Guhagar Bungalow No 107P52800052799Kirtanwadi, Ratnagiri1Oct 2023CompletedJan 2026Feb 2025
Mango Holiday Village Guhagar Bungalow No 108P52800051905Kirtanwadi, Ratnagiri-Jul 2023CompletedDec 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 90P52800051906Kirtanwadi, Ratnagiri-Jul 2023CompletedNov 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 92P52800050804Kirtanwadi, Ratnagiri-May 2023CompletedSep 2025Feb 2024
Harikunj EnclaveP51700047799Brahman Society, Naupada, Thane29Nov 2022OngoingAug 2025Not delivered
Mango Holiday Village Guhagar Bungalow No 56P52800049406Kirtanwadi, Ratnagiri-Feb 2023CompletedDec 2024Feb 2024
Mango Holiday Village Guhagar Bungalow No 87P52800045443Kirtanwadi, Ratnagiri-May 2022CompletedMay 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 96P52800033522Kirtanwadi, Ratnagiri-Feb 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 88P52800033586Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 106P52800034745Kirtanwadi, Ratnagiri-Apr 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 100P52800034054Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Pranav EnclaveP51700024548Naupada, Hindu Colony, Thane-Feb 2020CompletedMar 2024Mar 2022
Mango Holiday Village Guhagar Bungalow No 95P52800032945Kirtanwadi, Ratnagiri-Feb 2022CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 94P52800032054Kirtanwadi, Ratnagiri-Dec 2021CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 27P52800031199Kirtanwadi, Ratnagiri-Oct 2021CompletedOct 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 98P52800028597Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Dec 2021
Mango Holiday Village Guhagar - Bungalow No 2P52800028581Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 102P52800030532Kirtanwadi, Ratnagiri-Aug 2021CompletedMay 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 99P52800029127Kirtanwadi, Ratnagiri-Apr 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 97P52800029172Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 41P52800029170Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village, Guhagar - Bungalow No 6P52800024075Kirtanwadi, Ratnagiri-Jan 2020CompletedDec 2022Feb 2021
Mango Holiday Village, Guhagar - Bungalow No 3P52800028056Opposite Government Rest house, Ratnagiri-Jan 2021CompletedNov 2022Dec 2021
Mango Holiday Village, Guhagar - Bungalow No 54P52800021888Kirtanwadi, Ratnagiri-Aug 2019CompletedAug 2022Jul 2021
Mango Holiday Village, Guhagar - Bungalow No 103P52800026667Kirtanwadi, Ratnagiri-Oct 2020CompletedJun 2022Jul 2021
Mango Holiday Village Guhagar Bungalow No 42 and 93P52800020526Kirtanwadi, Ratnagiri-Apr 2019CompletedApr 2022Dec 2020
Mango Holiday Village, Guhagar - Phase 4P52800003399Kirtanwadi Tarf Guhagar, Ratnagiri-Aug 2017CompletedJan 2021Registered original: Jan 2020Feb 2019
Mango Holiday Village GuhagarKirtanwadi Road Opp Government Rest House Guhagar Dist Ratnagiri 41570362-CompletedMar 2017Mar 2017

How this compares with Ratnagiri

100%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Mango Lakefront Paradise Guhagar Bungalow No on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondwadi1,100+ in Ratnagiri

2 kmMango Lakefront ParadiseCompleted 4Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Samir Shrinivas Kale

Samir Shrinivas Kale has 38 registrations on MahaRERA, including Mango Holiday Village, Guhagar - Phase 4 and Mango Heritage. Its filings disclose 36 earlier MahaRERA projects: declares 30 of 30 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Mango Lakefront Paradise Guhagar Bungalow No 38 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Lakefront Paradise Guhagar Bungalow No 38?

The registered promoter entity is Samir Shrinivas Kale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Lakefront Paradise Guhagar Bungalow No 38?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Lakefront Paradise Guhagar Bungalow No 38?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Lakefront Paradise Guhagar Bungalow No 38?

The professionals named in the filing: Architect: Sanjay Kulkarni; Architect: SANJAY SADANAND KULKARNI; Engineer: Manoj Joshi; Engineer: AMEY SHINDE; Chartered Accountant: Kamdar Desai Patel Chartered Accountants; Chartered Accountant: Kamdar Desai and Patel LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Lakefront Paradise Guhagar Bungalow No 38?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Lakefront Paradise Guhagar Bungalow No 38. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Lakefront Paradise Guhagar Bungalow No to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.