Home / Browse projects / Ratnagiri, Maharashtra / Mango Holiday Village Guhagar Bungalow No 42 and 93

Completed No litigation declared Residential / Group Housing project

Mango Holiday Village Guhagar Bungalow No 42 and 93

By Samir Shrinivas Kale

RG-MH-03069 · RERA P52800020526 · Last updated on MahaRERA portal: 21 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Apr 2022Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

Mango Holiday Village Guhagar Bungalow No 42 and 93 is a Residential / Group Housing project by Samir Shrinivas Kale in Ratnagiri, Maharashtra, registered with MahaRERA as P52800020526 on 18 Apr 2019. The registration is recorded completed; possession was promised by 3 Apr 2022.

At a glance

Project

  • NameMango Holiday Village Guhagar Bungalow No 42 and 93
  • TypeResidential / Group Housing
  • Location
    • Kirtanwadi Road
    • Kirtanwadi
    • Kirtanwadi Tarf Guhagar
    • Guhagar
    • Ratnagiri
    • 415703
  • Pincode415703
  • RERA no.P52800020526
  • ReraGenie IDRG-MH-03069

Builder

  • NameSamir Shrinivas Kale
  • Entity typeIndividual
  • Other registrations37 more →
  • Completed32 of 38
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects36 →

Key dates

this monthRegisteredApr 2019PromisedApr 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Apr 2019
  • Promised completion3 Apr 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow No 42 ENA10000
Bungalow No 93 DNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Bungalow No 42 E64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 93 D64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes100%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Open Space3
BuildingOpen SpaceTotal
Bungalow No 42 E22
Bungalow No 93 D11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area483 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI137.96
Proposed, not sanctioned138 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMahesh Darshan, Near Makhamali Talao, Old Mumbai Agra Road, Chandawadi, Thane 400602

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPerceptions Architects & Interior Designers
EngineerManoj Joshi
Chartered AccountantKamdar Desai & Patel Chartered Accountants
PartnerRole in project
Samir Shrinivas Kale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Mar 2024

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 2020.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020 2021.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021 2022.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022 2023.pdf21 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 42E Completion Certificate and OC.pdf20 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf20 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bungalow No 42 OC.pdf18 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Bungalow No 93D1.pdf9 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bungalow No 42 OC.pdf19 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bungalow No 93 OC.pdf19 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bungalow No 93 OC.pdf6 Jan 2023
Declaration about Commencement CertificateFile: Declaration CC 42 n 93.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A June 19.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Sept 19.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Dec 19.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mar 20.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Jun 20.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sept 20.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Dec 20.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A March 21.pdf27 Nov 2021
CERSAI detailsFile: CERSAI Declaration 42 n 93.pdf27 Nov 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 42 n 93.pdf27 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 B No 42 n 93.pdf27 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 42E GNP OC 04122020.pdf31 Jul 2021
Building plan approvalFile: Mango CC.pdf3 Apr 2019
Layout approvalFile: Mango Drawing 002.PDF3 Apr 2019
Layout approvalFile: Mango Drawing 001.PDF3 Apr 2019
PAN CardFile: Samir PAN .pdf3 Apr 2019
Copy of the legal title reportFile: Mango Title Report.pdf3 Apr 2019
Details of encumbrancesFile: 033019 Encumbrances Declaration.pdf3 Apr 2019
Copy of Layout Approval (in case of layout)File: Mango Drawing 002.PDF3 Apr 2019
Copy of Layout Approval (in case of layout)File: Mango Drawing 001.PDF3 Apr 2019
Building Plan Approval (IOD)File: Mango CC.pdf3 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Mango CC.pdf3 Apr 2019
Declaration in FORM BFile: 033019 Form B.pdf3 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 033019 Architect Certificate.pdf3 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 033019 Structural Engineer Certificate.pdf3 Apr 2019
Certificates of CA (Form 3)File: 033019 CA Certificate.pdf3 Apr 2019
Proforma of Allotment letterFile: DRAFT Agreement 42 and 93.pdf3 Apr 2019

Promoter's earlier projects35

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

29 delivered on promise1 not delivered by the promised date5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mango Lakeview GuhagarP52800054932Guhagar, Ratnagiri24Feb 2024OngoingSep 2029Not due yet
MHVG Bungalow No 86P52800079696Kirtanwadi, Ratnagiri1Mar 2025OngoingSep 2027Not due yet
MHVG Bungalow No 105P52800079596Kirtanwadi, Ratnagiri1Mar 2025OngoingAug 2027Not due yet
MHVG Bungalow No 91P52800079665Kirtanwadi, Ratnagiri1Mar 2025OngoingJun 2027Not due yet
Mango Lakefront Paradise Guhagar Bungalow No 38P52800077206Kondwadi, Ratnagiri1Jul 2024OngoingNov 2026Not due yet
Mango Holiday Village Guhagar Bungalow No 109P52800066569Kirtanwadi, Ratnagiri1Jun 2024CompletedOct 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 101P52800056232Kirtanwadi, Ratnagiri-May 2024CompletedAug 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 104P52800052815Kirtanwadi, Ratnagiri-Oct 2023Certificate SignedFeb 2026Nov 2024
Mango Holiday Village Guhagar Bungalow No 107P52800052799Kirtanwadi, Ratnagiri1Oct 2023CompletedJan 2026Feb 2025
Mango Holiday Village Guhagar Bungalow No 108P52800051905Kirtanwadi, Ratnagiri-Jul 2023CompletedDec 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 90P52800051906Kirtanwadi, Ratnagiri-Jul 2023CompletedNov 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 92P52800050804Kirtanwadi, Ratnagiri-May 2023CompletedSep 2025Feb 2024
Harikunj EnclaveP51700047799Brahman Society, Naupada, Thane29Nov 2022OngoingAug 2025Not delivered
Mango Holiday Village Guhagar Bungalow No 56P52800049406Kirtanwadi, Ratnagiri-Feb 2023CompletedDec 2024Feb 2024
Mango Holiday Village Guhagar Bungalow No 87P52800045443Kirtanwadi, Ratnagiri-May 2022CompletedMay 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 96P52800033522Kirtanwadi, Ratnagiri-Feb 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 88P52800033586Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 106P52800034745Kirtanwadi, Ratnagiri-Apr 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 100P52800034054Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Pranav EnclaveP51700024548Naupada, Hindu Colony, Thane-Feb 2020CompletedMar 2024Mar 2022
Mango Holiday Village Guhagar Bungalow No 95P52800032945Kirtanwadi, Ratnagiri-Feb 2022CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 94P52800032054Kirtanwadi, Ratnagiri-Dec 2021CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 27P52800031199Kirtanwadi, Ratnagiri-Oct 2021CompletedOct 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 98P52800028597Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Dec 2021
Mango Holiday Village Guhagar - Bungalow No 2P52800028581Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 102P52800030532Kirtanwadi, Ratnagiri-Aug 2021CompletedMay 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 99P52800029127Kirtanwadi, Ratnagiri-Apr 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 97P52800029172Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 41P52800029170Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village, Guhagar - Bungalow No 6P52800024075Kirtanwadi, Ratnagiri-Jan 2020CompletedDec 2022Feb 2021
Mango Holiday Village, Guhagar - Bungalow No 3P52800028056Opposite Government Rest house, Ratnagiri-Jan 2021CompletedNov 2022Dec 2021
Mango Holiday Village, Guhagar - Bungalow No 54P52800021888Kirtanwadi, Ratnagiri-Aug 2019CompletedAug 2022Jul 2021
Mango Holiday Village, Guhagar - Bungalow No 103P52800026667Kirtanwadi, Ratnagiri-Oct 2020CompletedJun 2022Jul 2021
Mango Holiday Village, Guhagar - Phase 4P52800003399Kirtanwadi Tarf Guhagar, Ratnagiri-Aug 2017CompletedJan 2021Registered original: Jan 2020Feb 2019
Mango Holiday Village GuhagarKirtanwadi Road Opp Government Rest House Guhagar Dist Ratnagiri 41570362-CompletedMar 2017Mar 2017

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Mango Holiday Village Guhagar Bungalow No 42 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kirtanwadi1,100+ in Ratnagiri

Builder: Samir Shrinivas Kale

Samir Shrinivas Kale has 38 registrations on MahaRERA, including Mango Holiday Village, Guhagar - Phase 4 and Mango Heritage. Its filings disclose 36 earlier MahaRERA projects: declares 30 of 30 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Mango Holiday Village Guhagar Bungalow No 42 and 93 is delayed beyond 3 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Holiday Village Guhagar Bungalow No 42 and 93?

The registered promoter entity is Samir Shrinivas Kale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Holiday Village Guhagar Bungalow No 42 and 93?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Holiday Village Guhagar Bungalow No 42 and 93?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Holiday Village Guhagar Bungalow No 42 and 93?

The professionals named in the filing: Architect: Perceptions Architects & Interior Designers; Engineer: Manoj Joshi; Chartered Accountant: Kamdar Desai & Patel Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Holiday Village Guhagar Bungalow No 42 and 93?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Holiday Village Guhagar Bungalow No 42 and 93. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Holiday Village Guhagar Bungalow No 42 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.