Home / Browse projects / Thane, Maharashtra / Harikunj Enclave

Completed No litigation declared Residential / Group Housing project

Harikunj Enclave

By Samir Shrinivas Kale

RG-MH-61938 · RERA P51700047799 · Last updated on MahaRERA portal: 4 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 30 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Stilt Floor, 95%
10 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Harikunj Enclave is a Residential / Group Housing project by Samir Shrinivas Kale in Thane, Maharashtra, registered with MahaRERA as P51700047799 on 28 Nov 2022. The registration is recorded completed; possession was promised by 31 Aug 2025. 19 of the 29 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameHarikunj Enclave
  • TypeResidential / Group Housing
  • Location
    • Phadke Road
    • Brahman Society
    • Naupada
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047799
  • ReraGenie IDRG-MH-61938

Builder

  • NameSamir Shrinivas Kale
  • Entity typeIndividual
  • Other registrations37 more →
  • Completed32 of 38
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects36 →

Key dates

this monthRegisteredNov 2022PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Nov 2022
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

66%19 of 29 units booked

Figures as on 4 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Harikunj EnclaveNA9829029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

Harikunj Enclave: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 4 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area573 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 May 2025
LandownerVillageDistrict
MANJIRI SHRIKRISHNA PARANJPEThane (M Corp.)Thane
Mahesh Shrikrishna ParanjpeThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI2300.58
Proposed, not sanctioned2,023 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChandanwadi, Old Mumbai Agra Road, Thane 400602

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Prashant Thakkar Village Guhagar
EngineerMr R C Tipnis Tipnis
Chartered AccountantKamdar Desai & Patel Chartered Accountants
PartnerRole in project
Samir Shrinivas Kale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Harikunj O C.pdf4 Aug 2025
Form 1File: Form 1 310325.pdf21 Jun 2025
Form 2File: Form 2 310325.pdf21 Jun 2025
Form 3File: Form 3 - 310325.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold, Unsold, Booked Inventary - 310325.pdf21 Jun 2025
Declaration and undertaking (Annexure A)File: Declaration cum Undertaking - Annexure A.pdf3 Jun 2025
Form 1File: Form 1 01012025 HE.pdf2 Jun 2025
Form 2File: Form 2 25012025 HE.pdf2 Jun 2025
Form 3File: Form 3 200225 HE.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold, Unsold, Booked Inventary - 311224 HE.pdf2 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Harikunj- Form 5.pdf8 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 19 Jan 24.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 19 Jan 24.pdf20 Jan 2024
Building plan approvalFile: Amended plan - 04 Jan 24.pdf19 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended plan - 04 Jan 24.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended CC - 04 Jan 24.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 05 Jan 24.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 19 Jan 24.pdf19 Jan 2024
Building plan approvalFile: Amended Plan P1.PDF28 Nov 2023
Building plan approvalFile: Amended Plan P2.PDF28 Nov 2023
Building plan approvalFile: Amended Plan P3.PDF28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan P1.PDF28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan P2.PDF28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan P3.PDF28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended CC 101123.pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jul 2023
Other - FinanceFile: Form 5.pdf9 Feb 2023
Proforma of Agreement for saleFile: AFS_Revised.pdf5 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Model Form Of Agreement for Sale - Deviation Report.pdf5 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Sep 2022
Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf6 Sep 2022
Deviation Report with respect to Allotment letterFile: Model Form of Allotment Letter - Deviation Report.pdf6 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report wrt Allotment Letter.pdf6 Sep 2022
CERSAI detailsFile: CERSAI Search Report.pdf3 Sep 2022
CERSAI detailsFile: CERSAI self declaration.pdf3 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf27 Aug 2022
Declaration in FORM BFile: Form B - Promoter.pdf20 Aug 2022
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Finance.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Legal.pdf19 Aug 2022
Building plan approvalFile: Harikunj Plan.pdf11 Aug 2022
Layout approvalFile: Harikunj Plan.pdf11 Aug 2022
Copy of Layout Approval (in case of layout)File: Harikunj Plan.pdf11 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Harikunj Plan.pdf11 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Harikunj CC.pdf11 Aug 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf11 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Aug 2022
PAN CardFile: Samir PAN .pdf9 Aug 2022
Copy of the legal title reportFile: Legal Title Report Format A.pdf9 Aug 2022

Promoter's earlier projects35

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

30 delivered on promise5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mango Lakeview GuhagarP52800054932Guhagar, Ratnagiri24Feb 2024OngoingSep 2029Not due yet
MHVG Bungalow No 86P52800079696Kirtanwadi, Ratnagiri1Mar 2025OngoingSep 2027Not due yet
MHVG Bungalow No 105P52800079596Kirtanwadi, Ratnagiri1Mar 2025OngoingAug 2027Not due yet
MHVG Bungalow No 91P52800079665Kirtanwadi, Ratnagiri1Mar 2025OngoingJun 2027Not due yet
Mango Lakefront Paradise Guhagar Bungalow No 38P52800077206Kondwadi, Ratnagiri1Jul 2024OngoingNov 2026Not due yet
Mango Holiday Village Guhagar Bungalow No 109P52800066569Kirtanwadi, Ratnagiri1Jun 2024CompletedOct 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 101P52800056232Kirtanwadi, Ratnagiri-May 2024CompletedAug 2026Mar 2025
Mango Holiday Village Guhagar Bungalow No 104P52800052815Kirtanwadi, Ratnagiri-Oct 2023Certificate SignedFeb 2026Nov 2024
Mango Holiday Village Guhagar Bungalow No 107P52800052799Kirtanwadi, Ratnagiri1Oct 2023CompletedJan 2026Feb 2025
Mango Holiday Village Guhagar Bungalow No 108P52800051905Kirtanwadi, Ratnagiri-Jul 2023CompletedDec 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 90P52800051906Kirtanwadi, Ratnagiri-Jul 2023CompletedNov 2025Nov 2024
Mango Holiday Village Guhagar Bungalow No 92P52800050804Kirtanwadi, Ratnagiri-May 2023CompletedSep 2025Feb 2024
Mango Holiday Village Guhagar Bungalow No 56P52800049406Kirtanwadi, Ratnagiri-Feb 2023CompletedDec 2024Feb 2024
Mango Holiday Village Guhagar Bungalow No 87P52800045443Kirtanwadi, Ratnagiri-May 2022CompletedMay 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 96P52800033522Kirtanwadi, Ratnagiri-Feb 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 88P52800033586Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 106P52800034745Kirtanwadi, Ratnagiri-Apr 2022CompletedMar 2024Apr 2023
Mango Holiday Village Guhagar Bungalow No 100P52800034054Kirtanwadi, Ratnagiri-Mar 2022CompletedMar 2024Apr 2023
Pranav EnclaveP51700024548Naupada, Hindu Colony, Thane-Feb 2020CompletedMar 2024Mar 2022
Mango Holiday Village Guhagar Bungalow No 95P52800032945Kirtanwadi, Ratnagiri-Feb 2022CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 94P52800032054Kirtanwadi, Ratnagiri-Dec 2021CompletedNov 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 27P52800031199Kirtanwadi, Ratnagiri-Oct 2021CompletedOct 2023Apr 2023
Mango Holiday Village Guhagar - Bungalow No 98P52800028597Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Dec 2021
Mango Holiday Village Guhagar - Bungalow No 2P52800028581Kirtanwadi, Ratnagiri-Mar 2021CompletedJun 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 102P52800030532Kirtanwadi, Ratnagiri-Aug 2021CompletedMay 2023Jul 2022
Mango Holiday Village Guhagar - Bungalow No 99P52800029127Kirtanwadi, Ratnagiri-Apr 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 97P52800029172Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village Guhagar - Bungalow No 41P52800029170Kirtanwadi, Ratnagiri-May 2021CompletedDec 2022Apr 2022
Mango Holiday Village, Guhagar - Bungalow No 6P52800024075Kirtanwadi, Ratnagiri-Jan 2020CompletedDec 2022Feb 2021
Mango Holiday Village, Guhagar - Bungalow No 3P52800028056Opposite Government Rest house, Ratnagiri-Jan 2021CompletedNov 2022Dec 2021
Mango Holiday Village, Guhagar - Bungalow No 54P52800021888Kirtanwadi, Ratnagiri-Aug 2019CompletedAug 2022Jul 2021
Mango Holiday Village, Guhagar - Bungalow No 103P52800026667Kirtanwadi, Ratnagiri-Oct 2020CompletedJun 2022Jul 2021
Mango Holiday Village Guhagar Bungalow No 42 and 93P52800020526Kirtanwadi, Ratnagiri-Apr 2019CompletedApr 2022Dec 2020
Mango Holiday Village, Guhagar - Phase 4P52800003399Kirtanwadi Tarf Guhagar, Ratnagiri-Aug 2017CompletedJan 2021Registered original: Jan 2020Feb 2019
Mango Holiday Village GuhagarKirtanwadi Road Opp Government Rest House Guhagar Dist Ratnagiri 41570362-CompletedMar 2017Mar 2017

How this compares with Thane

66%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harikunj Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Brahman Society, Naupada7,600+ in Thane

2 kmHarikunj EnclaveCompleted 90Lapsed / revoked 67Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 283 registered projects within 2 km.

Builder: Samir Shrinivas Kale

Samir Shrinivas Kale has 38 registrations on MahaRERA, including Mango Holiday Village, Guhagar - Phase 4 and Mango Heritage. Its filings disclose 36 earlier MahaRERA projects: declares 30 of 30 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Harikunj Enclave is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harikunj Enclave?

The registered promoter entity is Samir Shrinivas Kale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harikunj Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Harikunj Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Harikunj Enclave?

The professionals named in the filing: Architect: Ar Prashant Thakkar Village Guhagar; Engineer: Mr R C Tipnis Tipnis; Chartered Accountant: Kamdar Desai & Patel Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Harikunj Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harikunj Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harikunj Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.