ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE

Registered No litigation declared Commercial project

LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE

By KOLTE-PATIL DEVELOPERS LIMITED

RG-MH-31259 · RERA P52100079593 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 63 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedno revision filed
13 of 77Construction stages doneacross 7 buildings; furthest along: Slabs of Super Structure, 90%
122 of 159Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE is a Commercial project by KOLTE-PATIL DEVELOPERS LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100079593 on 17 Mar 2025. Possession is promised by 30 Nov 2027. 37 of the 159 units on this registration are recorded sold or booked, and 13 of 77 construction stages are filed complete.

At a glance

Project

  • NameLIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE
  • TypeCommercial
  • Location
    • Jambe
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100079593
  • ReraGenie IDRG-MH-31259

Builder

  • NameKOLTE-PATIL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200PN1991PLC129428
  • GSTIN27AAACK7310G1ZT
  • DirectorYashvardhan Patil
  • Other registrations63 more →
  • Completed14 of 64
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredMar 2025PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Mar 2025
  • Promised completion30 Nov 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed74 files

Current status

23%37 of 159 units booked
15.9%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA2202020
Building BNA2202020
Building CNA2204747
Building DNA22011
Building E - Wing ANA22011
Building E - Wing BNA2202929
Building FNA2204141

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Building A26%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C20%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E - Wing A20%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E - Wing B20%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed474

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots474
Open Space474
BuildingOpen SpaceTotal
Building A5454
Building B5555
Building C107107
Building D3939
Building E - Wing A4040
Building E - Wing B7979
Building F100100

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,335 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Naresh PatilPune (M Corp.)Pune
Ankita PatilPune (M Corp.)Pune
Ketan KoltePune (M Corp.)Pune
Milind KoltePune (M Corp.)Pune
Rajesh PatilPune (M Corp.)Pune
Kolte Patil Developers LimitedPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI7348.7
Proposed, not sanctioned7,349 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 188.90 cr
Cost incurredRs 29.97 cr
Work done15.87%
BuildingWingEstimatedIncurred
Building ANARs 25.79 crRs 4.10 cr
Building BNARs 25.79 crRs 4.10 cr
Building CNARs 25.79 crRs 4.10 cr
Building DNARs 25.79 crRs 4.10 cr
Building E - Wing ANARs 25.79 crRs 4.10 cr
Building E - Wing BNARs 25.79 crRs 4.10 cr
Building FNARs 25.79 crRs 4.10 cr
-NARs 8.36 crRs 1.30 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKolhatkar and Gowaikar
EngineerFiroz Shaikh
EngineerGaurag Joshi
Chartered AccountantVidhi S Shah & Associates
PartnerRole in project
KOLTE-PATIL DEVELOPERS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 R17A.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 R17A com.pdf28 Apr 2026
Withdrawal Update Form 3File: Signed Form 3 17A Commercial.pdf28 Apr 2026
Withdrawal Update Form 1File: 251231_ Details_Life Republic_R17A - Commercial.pdf6 Mar 2026
Withdrawal Update Form 2File: Form 2 R17A Shop.pdf6 Mar 2026
Withdrawal Update Form 3File: Form 3 LR R17A Shops 31-12-2025.pdf6 Mar 2026
Withdrawal Update Form 1File: 250930_ Details_Life Republic_R17A - Commercial.pdf27 Nov 2025
Withdrawal Update Form 2File: Form-2 LR R17A Commercial.pdf27 Nov 2025
Withdrawal Update Form 3File: Form-3 LR R17A Commercial.pdf27 Nov 2025
Withdrawal Update Form 1File: 250630_ Details_Life Republic_R17A - Commercial.pdf6 Oct 2025
Withdrawal Update Form 1File: 250630_ Details_Life Republic_R17A - Commercial.pdf6 Oct 2025
Withdrawal Update Form 2File: Form-2 R17A Commercial.pdf6 Oct 2025
Withdrawal Update Form 2File: Form-2 R17A Commercial.pdf6 Oct 2025
Withdrawal Update Form 3File: Form-3 LR R17A Commercial.pdf6 Oct 2025
Withdrawal Update Form 3File: Form-3 LR R17A Commercial.pdf6 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 LR R17A Commercial.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 LR R17A Commercial.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 250331_ Details_Life Republic_R17A - Commercial.pdf18 Apr 2025
Other - LegalFile: Declaration for 7 12 Extract with annexure.pdf11 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration 11032025.pdf11 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Declaration for Bank account.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - R17A.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf4 Mar 2025
Details of encumbrances concerned to FinanceFile: Declaration - Finance.pdf1 Mar 2025
Proforma of Allotment letterFile: Letter of Allotment.pdf1 Mar 2025
CERSAI detailsFile: R17A CERSAI with Declarations.pdf1 Mar 2025
Details of encumbrances concerned to LegalFile: Declaration - Finance.pdf1 Mar 2025
Other - TechnicalFile: Declaration - Area.pdf1 Mar 2025
Other - TechnicalFile: Declaration - FSI.pdf1 Mar 2025
Other - TechnicalFile: Declaration - Parking.pdf1 Mar 2025
Proforma of Agreement for saleFile: AFS-LR-R17A-Commercial 28022025.pdf1 Mar 2025
Other - TechnicalFile: Declaration - Double or Multiple Projects_page-0001.pdf21 Feb 2025
Layout approvalFile: Layout.pdf20 Feb 2025
Building plan approvalFile: 17-23.pdf20 Feb 2025
Building plan approvalFile: 18-23 low.pdf20 Feb 2025
Building plan approvalFile: 19-23.pdf20 Feb 2025
Building plan approvalFile: 20-23.pdf20 Feb 2025
Building plan approvalFile: 21-23.pdf20 Feb 2025
Copy of the legal title reportFile: Title Report_compressed.pdf20 Feb 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 21-23.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 20-23.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 19-23.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 18-23 low.pdf20 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 17-23.pdf20 Feb 2025
Other - LegalFile: POA_Milind Kolte.pdf20 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format- A.pdf20 Feb 2025
Other - FinanceFile: Declation for not opening the bank account of the landowners_1.pdf20 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: details of secured loan with declaration.pdf20 Feb 2025
Other - LegalFile: Sale Deed_3.pdf19 Feb 2025
Other - LegalFile: Sale Deed_1_compressed.pdf19 Feb 2025
Other - LegalFile: Name change declaration.pdf19 Feb 2025
Other - LegalFile: CTC_Addition of Signatory MAHARERA PUNE.pdf19 Feb 2025
Other - LegalFile: Declaration - Non-negoatiable clause.pdf19 Feb 2025
Other - LegalFile: Sale Deed_2_compressed.pdf19 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf19 Feb 2025
Building plan approvalFile: 13-23 - low.pdf18 Feb 2025
Building plan approvalFile: 14-23 - Low.pdf18 Feb 2025
Building plan approvalFile: 15-23 low.pdf18 Feb 2025
Building plan approvalFile: 16-23.pdf18 Feb 2025
PAN CardFile: 1 PAN Card.pdf18 Feb 2025
Details of encumbrances concerned to FinanceFile: Declaration - Legal.pdf18 Feb 2025
Declaration in FORM BFile: Form B.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Form 2.pdf18 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 15-23 low.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 16-23.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 14-23 - Low.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 13-23 - low.pdf18 Feb 2025
Declaration about Commencement CertificateFile: R17A Commercial Declaration about Commencement Certificate.pdf18 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Letter of Allotment.pdf18 Feb 2025
Details of encumbrances concerned to LegalFile: Declaration - Legal.pdf18 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B R17.pdf18 Feb 2025

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EVARAP51800026949Borivali, Mumbai Suburban-Nov 2020CompletedOct 2024Oct 2024
24K Stargaze - J BuildingP52100027791Bavdhan, Pune-Jan 2021CompletedJun 2024Jun 2024
Western AvenueP52100000917Wakad, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Jan 2023
24K StargazeP52100018473Bavdhan, Pune-Nov 2018CompletedMar 2023Mar 2023
Redevelopment of Jai Vijay CHSL - Phase IP51800004446Vile-Parle (East), Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Sep 2019Sep 2022
24K ATRIAP52100000428Vishal Nagar, Pimple Nilakh, Pune-Jul 2017CompletedDec 2021Dec 2021
STARGAZEP52100009722Bavadhan BK, Pune-Aug 2017CompletedDec 2018Dec 2018
Ivy Estate Umang PremierP52100000655WAGHOLI, Pune-Jul 2017CompletedSep 2018Sep 2018
GLITTERATIP52100006257Pimpri Chinchawad (M Corp.), Pune-Aug 2017CompletedJun 2018Jun 2018
GLITTERATI IIP52100000319Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedApr 2018Registered original: Dec 2017Apr 2018
Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272Andheri, Mumbai Suburban-Aug 2017CompletedMar 2018Registered original: Dec 2017Mar 2018
GlitteratiPimple Nilakh Pune - 411014187-CompletedApr 2016Apr 2016
City BayDhole-Patil road Pune-41100127-CompletedApr 2014Apr 2014

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND O on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jambe13,700+ in Pune

Builder: KOLTE-PATIL DEVELOPERS LIMITED

KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE?

The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE?

The professionals named in the filing: Architect: Kolhatkar and Gowaikar; Engineer: Firoz Shaikh; Engineer: Gaurag Joshi; Chartered Accountant: Vidhi S Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND O to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.