Home / Browse projects / Mumbai Suburban, Maharashtra / LAXMI MADHUVAN

Registered No litigation declared Residential / Group Housing project

LAXMI MADHUVAN

By LAXMI LEELA BUILDCON LLP

RG-MH-23646 · RERA P51800078958 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 7.70 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

LAXMI MADHUVAN is a Residential / Group Housing project by LAXMI LEELA BUILDCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078958 on 24 Jan 2025. Possession is promised by 31 May 2027.

At a glance

Project

  • NameLAXMI MADHUVAN
  • TypeResidential / Group Housing
  • Location
    • MADHUVAN
    • JITENDRA CROSS ROAD
    • MALAD EAST
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078958
  • ReraGenie IDRG-MH-23646

Builder

  • NameLAXMI LEELA BUILDCON LLP
  • Entity typePartnership
  • Designated PartnersMONIKA PRAVINKUMAR KOTHARI, PRAVIN KUMAR AASULALJI KOTHARI
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2025PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2025
  • Promised completion31 May 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed74 files

Current status

98.1%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area709 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 7.70 crore
CERSAI search filedYes
Declared on13 Jul 2026
LandownerVillageDistrict
Mahavir Co-operative Housing Society LtdMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1913.34
Proposed, not sanctioned921 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD FLOOR SHOP NO 02 06 B WING GALAXY HEIGHT MAIN LINK RD BANGUR NAGAR GOREGAON WEST DIST MUMBAI MUMBAI MAHARASHTRA 400104
Estimated costRs 10.93 cr
Cost incurredRs 10.72 cr
Work done98.08%
BuildingWingEstimatedIncurred
-NARs 10.93 crRs 10.72 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK PRABHUDAS HINGOO
EngineerDIVYESH KOTHARI
EngineerASHOK KUMAR
Chartered AccountantSANJAY B SHARMA & CO
Chartered AccountantZubin Haria
Chartered AccountantPRANAY PUNAMIYA AND CO.
PartnerRole in project
LAXMI LEELA BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Architect certificate for Rera_Laxmi Madhuvan_Q4_2025-26.pdf21 May 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate_Q4_2025-26_Laxmi Leela Buildcon.pdf21 May 2026
Withdrawal Update Form 3File: Form-3_Laxmi Madhuvan_Q4_2025-26_compressed.pdf21 May 2026
Withdrawal Update Form 1File: Form 1_Architect certificate for Rera_Laxmi Madhuvan_Q3_2025-26.pdf9 Mar 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate_Laxmi Madhuvan_Q3_2025-26.pdf9 Mar 2026
Withdrawal Update Form 3File: Form-3_Laxmi Madhuvan_Q3_2025-26.pdf9 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 Audit Report_Laxmi Madhuvan_24-25.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1_Architect certificate for Rera_Q2_2025-26.pdf14 Nov 2025
Withdrawal Update Form 1File: FORM 1_Architect certificate for Rera_Q2_2025-26.pdf14 Nov 2025
Withdrawal Update Form 2File: FORM 2_LAXMI MADHUVAN_Q2_LLB.pdf14 Nov 2025
Withdrawal Update Form 2File: FORM 2_LAXMI MADHUVAN_Q2_LLB.pdf14 Nov 2025
Withdrawal Update Form 3File: FORM 2_LAXMI MADHUVAN_Q2_LLB.pdf14 Nov 2025
Withdrawal Update Form 3File: FORM 2_LAXMI MADHUVAN_Q2_LLB.pdf14 Nov 2025
Withdrawal Update Form 1File: Architect certificate for Rera Q1_2025-26.pdf10 Oct 2025
Withdrawal Update Form 1File: Architect certificate for Rera Q1_2025-26.pdf10 Oct 2025
Withdrawal Update Form 2File: Architect certificate for Rera Q1_2025-26.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2_Q1.pdf10 Oct 2025
Withdrawal Update Form 3File: FORM-3_Q1.pdf10 Oct 2025
Withdrawal Update Form 3File: FORM-3_Q1.pdf10 Oct 2025
Layout approvalFile: 1 page new amendment plan.pdf4 Aug 2025
Building plan approvalFile: amendement plan approval letter.pdf2 Aug 2025
Building plan approvalFile: 1 page new amendment plan.pdf2 Aug 2025
Building plan approvalFile: 2 page new amendment plan.pdf2 Aug 2025
Building plan approvalFile: 3 u0026 4 page new amendment plan.pdf2 Aug 2025
Form 1File: Laxmi buildcon Q4 form 1.pdf2 Aug 2025
Form 2File: FORM 2 Q4 Mahaveer 31-03-2025.pdf2 Aug 2025
Form 3File: Laxmi buildcon form 3 Q4001.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: UNIT SOLD UNSOLD_LAXMI MADHUVAN REPORT.pdf2 Aug 2025
Building plan approvalFile: 2480713Amendletter_signed (1).pdf22 Jul 2025
Building plan approvalFile: 1st page drawing_compressed.pdf22 Jul 2025
Building plan approvalFile: 2nd page drawing.pdf22 Jul 2025
Building plan approvalFile: 3 & 4 drawing.pdf22 Jul 2025
Details of encumbrances concerned to FinanceFile: Encumbrances_Laxmi Madhuvan_aditya birla.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Laxmi buildcon Q4 form 1.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmi buildcon form 3 Q4001.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 Mahaveer 31-03-2025.pdf22 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrances_Laxmi Madhuvan_aditya birla.pdf22 Apr 2025
Proforma of Agreement for saleFile: agreement_Laxmi Madhuvan_ABHF.pdf22 Apr 2025
Other - FinanceFile: Land Cost Declaration_Laxmi Madhuvan (1).pdf14 Jan 2025
Proforma of Allotment letterFile: AL_Laxmi Madhuvan_Laxmi Leela Builcon LLP_06012025.pdf6 Jan 2025
Proforma of Agreement for saleFile: AFS_ Laxmi Madhuvan_Laxmi Leela Builcon LLP_06012025.pdf6 Jan 2025
Copy of the legal title reportFile: TITLE REPORT NEW_merged_compressed.pdf3 Jan 2025
Layout approvalFile: 1.pdf13 Dec 2024
Copy of Layout Approval (in case of layout)File: 1.pdf13 Dec 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRUNCES.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Laxmi Madhuvan (1).pdf23 Nov 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRUNCES.pdf23 Nov 2024
Other - TechnicalFile: ANNEXURE A DECLARATION CUM UNDERTAKING.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE001.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF OTHER REAL ESTATE M K.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF OTHER REAL ESTATE N K.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF OTHER REAL ESTATE RONAK.pdf23 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF OTHER REAL ESTATE SAGAR.pdf23 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B SEPERATE BANK ACCOUNT LAXMI MADHUVAN (1).pdf23 Nov 2024
Building plan approvalFile: 3.pdf21 Nov 2024
Building plan approvalFile: 2.pdf21 Nov 2024
Building plan approvalFile: 1.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES001.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for Rera.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for Rera.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Nov 2024
Declaration about Commencement CertificateFile: Format - D Laxmi Madhuvan001.pdf13 Nov 2024
CERSAI detailsFile: Cersai Declaration ( Laxmi Madhuvan.pdf13 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A SEPERATE BANK ACCOUNT001.pdf13 Nov 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER001.pdf13 Nov 2024
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES001.pdf13 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation In Agreement001_compressed.pdf13 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED UNSECURED FINANCE.pdf13 Nov 2024
Declaration in FORM BFile: Form - B Laxmi Madhuvan001_compressed.pdf9 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2450454_FirstCC_signed.pdf8 Nov 2024
PAN CardFile: PAN CARD LAXMI LEELA BUILDCON LLP PDF (2).pdf6 Nov 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LAXMI SHRUSHTI - WING BP51800030965GOREGAON WEST, Mumbai Suburban129Sep 2021CompletedAug 2025Feb 2025
LUXURY CHSL LTDP51800050568BEHIND FILMISTAN, Mumbai Suburban65Apr 2023OngoingJun 2025Not delivered
Laxmi Callistaplot no 283 Jawahr Nagar Road No 3Goregaon West Mumabi 40010290-CompletedSep 2019Late, Feb 2021
Laxmi Heightsplot no 307 Jawahr Nagar Road No 16 Goregaon West Mumabi 40010235-CompletedDec 2018Late, Jul 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI MADHUVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmLAXMI MADHUVANCompleted 161Lapsed / revoked 100Other 175Dot size: filed unitsN

Filed coordinates, straight-line distance. 436 registered projects within 2 km.

Builder: LAXMI LEELA BUILDCON LLP

LAXMI LEELA BUILDCON LLP has 1 registration on MahaRERA, including LAXMI MADHUVAN. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LAXMI MADHUVAN is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI MADHUVAN?

The registered promoter entity is LAXMI LEELA BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI MADHUVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI MADHUVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI MADHUVAN?

The professionals named in the filing: Architect: RASIK PRABHUDAS HINGOO; Engineer: DIVYESH KOTHARI; Engineer: ASHOK KUMAR; Chartered Accountant: SANJAY B SHARMA & CO; Chartered Accountant: Zubin Haria; Chartered Accountant: PRANAY PUNAMIYA AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI MADHUVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI MADHUVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI MADHUVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.