Home / Browse projects / Mumbai Suburban, Maharashtra / MAULI OMKAR

Registered Litigation declared Residential / Group Housing project

MAULI OMKAR

By MAULI SAI DEVELOPERS PVT LTD

RG-MH-10069 · RERA P51800001198 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 11 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 48 months from the original
33 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
412 of 587Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

MAULI OMKAR is a Residential / Group Housing project by MAULI SAI DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001198 on 27 Jul 2017. Possession is promised by 7 Jul 2027. The completion date has moved by 48 months from the original filing. 175 of the 587 units on this registration are recorded sold or booked, and 33 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMAULI OMKAR
  • TypeResidential / Group Housing
  • Location
    • VAISHET PADA
    • TRIVENI NAGAR
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001198
  • ReraGenie IDRG-MH-10069

Builder

  • NameMAULI SAI DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU45201MH2004PTC144062
  • GSTIN27AAECM0577F1ZI
  • DirectorSUNIL TUKARAM BHARADKAR
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJul 2023Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2017
  • Promised completion7 Jul 2027
  • Revised completionRevised to 7 Jul 2027 (originally 8 Jul 2023)
  • Buildings4 building records
  • Documents filed82 files

Current status

30%175 of 587 units booked
83.4%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR 1ANA212022420244
OMKAR 1BNA212072072
OMKAR 2BNA22201160116
OMKAR 2ANA222012827155

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

OMKAR 1A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OMKAR 1B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OMKAR 2B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OMKAR 2A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered128
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
OMKAR 1A32234
OMKAR 1B32234
OMKAR 2B32234
OMKAR 2A32234

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,051 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI15894.74
Proposed, not sanctioned15,895 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOFF DAFTARY ROAD MALAD EAST MUMBAI 400 097
Estimated costRs 52.11 cr
Cost incurredRs 43.45 cr
Work done83.38%
BuildingWingEstimatedIncurred
OMKAR 1ANARs 13.03 crRs 10.86 cr
OMKAR 1BNARs 13.03 crRs 10.86 cr
OMKAR 2BNARs 13.03 crRs 10.86 cr
OMKAR 2ANARs 13.03 crRs 10.86 cr

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK HINGOO
ArchitectAMISH AGASHIWALA
ArchitectMANGESH GOSAVI
ArchitectVARUN KADAM
EngineerHARESH PATEL
EngineerVINOD CHALKE
EngineerVarun Kadam
EngineerJACOB BASTYAW DSOUZA
EngineerSHUBHAM SAWANT
Chartered AccountantHSP&ASSOCIATES
Chartered AccountantDilip
PartnerRole in project
MAULI SAI DEVELOPERS PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017447Jul 2023 → Jul 2024

Reason as filed by the promoterDUE TO SCARCITY OF RAW MATERIALS AND LABOURS THERE IS DELAY IN RECEIVING OCCUPANCY CERTIFICATE .

EXT51800024661Jul 2023 → Jul 2027

Reason as filed by the promoterWE ARE SEEKING AN EXTENSION AS THE PROJECT CONSISTS OF FOUR BUILDINGS: MAULI OMKAR 1A, 1B, 2A, AND 2B. OUT OF THESE, BUILDINGS 1A, 1B, AND 2B HAVE BEEN FULLY CONSTRUCTED, WHILE CONSTRUCTION OF BUILDING 2A IS STILL PENDING. ALL BUILDINGS ARE REGISTERED UNDER A SINGLE RERA NUMBER. PLEASE NOTE THE CONSTRUCTION WORK FOR BUILDING 2A IS NOT YET STARTED SO WE HV NOT RECEIVED ANY CONSENT OF ALLOTEES.

Litigation declared11

CaseCourtStatus
752/2014BOMBAY HIGH COURTDISPOSED
1791/2016BOMBAY HIGH COURTDISPOSED
3114/2013CITY CIVIL COURT DINDOSHIDISPOSED
988/2017CITY CIVIL COURT DINDOSHIPENDING NEXT DATE GIVEN
490/2016DDLR FORTCLOSED PENDING FOR ORDER
1257/2016ADD COMM FORTPENDING
3234/2013CITY CIVIL COURT DINDOSHIPENDING NEXT DATE GIVEN
113/2016DDLR FORTCLOSED PENDING FOR ORDER
CC006000000198285/2021Maharashtra Real Estate Regulatory AuthorityOngoing
CC006000000198285/2021Maharashtra Real Estate Regulatory AuthorityOngoing
CC006000000282167/2022Maharashtra Real Estate Regulatory AuthorityOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000198285Mr. Satish Vilas LotlikarMauli Sai Developers Private Limited09/09/2021
CC006000000282167SABIRALI TUFHEL SHAIKHMAULI SAI DEVELOPERS PVT.LTD06/10/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jan 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf9 Jun 2026
Withdrawal Update Form 2File: form 2 new.pdf9 Jun 2026
Withdrawal Update Form 3File: form 3 new.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1 Mauli Omkar from 1st July 2025 to 30th Sep 2025.pdf8 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2-Engineer Certificate_Omkar.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 December 2025 Mauli Omkar_0001.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Omkar.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 MAULI OMKAR DECEMBER 2025_0001 (1).pdf8 Jun 2026
Withdrawal Update Form 1File: form 1 june 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Mauli Omkar_June 25.pdf4 Jun 2026
Withdrawal Update Form 3File: form 3 june 25.pdf4 Jun 2026
Certificates of CA (Form 3)File: FINAL Form 3.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory_11zon.pdf15 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect Certificate_Omkar_30-6-2024.pdf14 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_Architect Certificate_Omkar _30-09-2024.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_Omkar_30-09-2024.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: OMKAR CC.pdf12 Aug 2024
Declaration about Commencement CertificateFile: DCC.pdf12 Aug 2024
Declaration in FORM BFile: FORM B.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf12 Aug 2024
Certificates of CA (Form 3)File: FORM 3 (1).pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 _Omkar.pdf12 Aug 2024
Certificates of CA (Form 3)File: FORM 3 24-07-2024.pdf24 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect Certificate-Omkar.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate -Omkar.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Site Supervisor Certificate-omkar.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Omkar.pdf23 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 mauli omkar 1A and 1B.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: FINAL OMKAR INVENTORY.pdf24 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mauli Omkar Composite bldg 1.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: No encumbrances certificate.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: No encumbrances certificate.pdf25 Aug 2023
Declaration about Commencement CertificateFile: Form D Declaration about commencement certificate.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: FINAL SOLD INVENTORY.pdf25 Aug 2023
Certificates of CA (Form 3)File: CA certificate_Omkar.pdf25 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Omkar.pdf24 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf24 Aug 2023
CERSAI detailsFile: cersai letter.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A disclosure of interest.pdf24 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Omkar 18-19.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Omkar 19-20.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Omkar 20-21.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Omkar 21-22.pdf17 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: OMKAR FORMAT A.pdf17 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MAULI OMKAR 2019-2020-0001.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MAULI OMKAR 2020-2021-0001.pdf13 Oct 2022
Layout approvalFile: IOA 2017 MAULI OMKAR.pdf14 Apr 2022
Copy of Layout Approval (in case of layout)File: IOA 2017 MAULI OMKAR.pdf14 Apr 2022
Certificates of CA (Form 5)File: Form 5 - Mauli Omkar pdf.pdf2 Apr 2019
Building plan approvalFile: Omkar TWO B PLAN.pdf20 Jul 2017
Building plan approvalFile: OMKAR ONE PLAN.pdf20 Jul 2017
Building plan approvalFile: OMKAR TWO A PLAN.pdf20 Jul 2017
Building plan approvalFile: IOD Mauli Omkar ONE.PDF20 Jul 2017
Building plan approvalFile: IOD.pdf20 Jul 2017
Building plan approvalFile: IOD.pdf20 Jul 2017
Layout approvalFile: Omkar Layout.pdf20 Jul 2017
Layout approvalFile: OMKAR TWO A PLAN.pdf20 Jul 2017
Copy of the legal title reportFile: Title Certificate Mauli Omkar.PDF20 Jul 2017
Details of encumbrancesFile: Title Certificate Mauli Omkar.PDF20 Jul 2017
Copy of Layout Approval (in case of layout)File: OMKAR TWO A PLAN.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Omkar Layout.pdf20 Jul 2017
Building Plan Approval (IOD)File: IOD Mauli Omkar ONE.PDF20 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf20 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf20 Jul 2017
Building Plan Approval (IOD)File: OMKAR TWO A PLAN.pdf20 Jul 2017
Building Plan Approval (IOD)File: Omkar TWO B PLAN.pdf20 Jul 2017
Building Plan Approval (IOD)File: OMKAR ONE PLAN.pdf20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Omkar Composite Bldg ONE.PDF20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Omkar Sale Bldg TWO A.PDF20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Omkar Sale Bldg TWO B.PDF20 Jul 2017
Declaration in FORM BFile: Declaration.PDF20 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Omkar.pdf20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mauli Omkar.PDF20 Jul 2017
Certificates of CA (Form 3)File: OMKAR_CERTIFICATE.pdf20 Jul 2017
Proforma of Allotment letterFile: self declaration omkar.PDF20 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MAULI CLASSICMAULI CLASSIC HAWA MANGAL BAUG NEAR HAWA HRIA MAHAL COLONY PUSHPA PARK DAFTARY ROAD MALAD EAST MUMBAI 400 09766CompletedFeb 2014Late, Apr 2014

How this compares with Mumbai Suburban

30%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAULI OMKAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TRIVENI NAGAR6,700+ in Mumbai Suburban

2 kmMAULI OMKARCompleted 63Lapsed / revoked 50Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: MAULI SAI DEVELOPERS PVT LTD

MAULI SAI DEVELOPERS PVT LTD has 4 registrations on MahaRERA, including MAULI OMKAR and MAULI PRIDE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MAULI OMKAR is delayed beyond 7 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAULI OMKAR?

The registered promoter entity is MAULI SAI DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45201MH2004PTC144062 and GSTIN 27AAECM0577F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAULI OMKAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAULI OMKAR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAULI OMKAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAULI OMKAR?

The professionals named in the filing: Architect: RASIK HINGOO; Architect: AMISH AGASHIWALA; Architect: MANGESH GOSAVI; Architect: VARUN KADAM; Engineer: HARESH PATEL; Engineer: VINOD CHALKE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAULI OMKAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAULI OMKAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAULI OMKAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.