Home / Browse projects / Mumbai Suburban, Maharashtra / Alta Monte and Signet
Alta Monte and Signet
By ERA REALTORS PRIVATE LIMITED
RG-MH-55419 · RERA P51800010463 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 253 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Alta Monte and Signet is a Residential / Group Housing project by ERA REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010463 on 27 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 1,224 of the 1,462 units on this registration are recorded sold or booked, and 43 of 55 construction stages are filed complete. 253 complaints are on record with the regulator.
At a glance
Project
- NameAlta Monte and Signet
- TypeResidential / Group Housing
- Location
- Shantaram Talao
- Siddheshwar Nagar
- Kokanipada
- Malad East
- Borivali
- Mumbai Suburban
- 400097
- Pincode400097
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010463
- ReraGenie IDRG-MH-55419
Builder
- NameERA REALTORS PRIVATE LIMITED
- Entity typeCompany
- DirectorsGnesh Ashok Nanaware, Kirit Hiralal Mehta
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
- Buildings5 building records
- Documents filed417 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Alta Monte Tower B | NA | 59 | 51 | 519 | 0 | 519 |
| Alta Monte Tower D North, West and South | NA | 61 | 53 | 232 | 0 | 232 |
| Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing | NA | 36 | 27 | 27 | 0 | 27 |
| Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors | NA | 31 | 20 | 51 | 0 | 51 |
| Signet | NA | 45 | 34 | 588 | 45 | 633 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
43 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 99%.
Alta Monte Tower B76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 98% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 99% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Alta Monte Tower D North, West and South100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Signet99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 98% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 33% |
| Electrical meter room, sub-station, receiving station | Yes | 33% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed853
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Alta Monte Tower B | 518 | 518 |
| Alta Monte Tower D North, West and South | 129 | 129 |
| Alta Monte Tower D3-12, 17-20, 25-27, 41-50 Floor East Wing | 36 | 36 |
| Alta Monte Tower D East Wing 13 to 16, 21 to 24, 28 to 40 Floors | 169 | 169 |
| Signet | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Omkar Realtors and Developers Pvt Ltd | Bhosari | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Alta Monte Tower D North, West and South | NA | Rs 539.00 cr | Rs 538.85 cr |
| Alta Monte Tower B | NA | Rs 382.56 cr | Rs 347.73 cr |
| Signet | NA | Rs 223.00 cr | Rs 221.18 cr |
| - | NA | Rs 176.85 cr | Rs 168.62 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anand V Dhokay |
| Engineer | Achyut Watve |
| Engineer | PRASAD SHETTY |
| Chartered Accountant | NEELESH JAIN & ASSOCIATES |
| Chartered Accountant | N. A. Shah Associates LLP |
| Chartered Accountant | S S M H & ASSOCIATES LLP |
| Chartered Accountant | S S M G & ASSOCIATES |
| Partner | Role in project |
|---|---|
| ERA REALTORS PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera. The Developer have undertaken the redevelopment of larger property under the approved Slum Rehabilitation Scheme and the Allottees were aware of the complexities involved in the said Project, including its development potential, issue of eligible/non-eligible slum dwellers, status of approvals etc That various slum dwellers as well as so called social workers had filed various litigations which caused loss of time and money to the Developer. It is submitted that several non-eligible slum dwellers in S.R. Scheme carried out “Dharna” agitation in front of the project gate from 23rd May 2016 w
Reason as filed by the promoterA. Discontinuation of Subvention Scheme: B. Economic downturn and Demonetization: C. Promoters Account became NPA: D. Force majeure (COVID 19 Pandemic): E. Dharna by Slum Dwellers F. Delay in Approvals G. New DP Rules H. Liquidity Crunch I. Injunction Order
Litigation declared20
| Case | Court | Status |
|---|---|---|
| 2842/2013 | High Court | Pending |
| 65/2016 | High Court | Pending |
| 14/2014 | National Green Tribunal | Pending |
| 243/2016 | Court of Session | Pending |
| 121/2015 | City Civil Court | Pending |
| 2885/2014 | City Civil Court | Pending |
| 283/2015 | City Civil Court | Pending |
| 1312/2012 | City Civil Court | Pending |
| 2261/2016 | City Civil Court | Pending |
| 492/2014 | City Civil Court | Pending |
| 493/2014 | City Civil Court | Pending |
| 1527/2014 | City Civil Court | Pending |
| 775/2014 | City Civil Court | Pending |
| 1755/2014 | City Civil Court | Pending |
| 10206/2016 | High Court | Pending |
| 379/2017 | Debts Recovery Tribunal Lucknow | Pending |
| 118/2017 | High Court of Bombay | For hearing |
| 65/2018 | High Court of Bombay | For hearing |
| 1292/2018 | High Court of Bombay | For hearing |
| 669/2017 | Debt Recovery Tribunal Allahabad | For hearing |
Complaints filed with MahaRERA253
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197096 | Mr. Akshok Kumar Mohanlal Bagla | M/s Omkar Realtors &Developers Pvt LTd | 31/05/2021 |
| CC006000000193280 | RENUKA SHETH | ERA REALTORS PVT. LTD. | 10/06/2020 |
| CC006000000193387 | MUSHTAQ ISMAIL PATEL | ERA REALTORS PRIVATE LIMITED | 06/07/2020 |
| CC006000000001028 | Tushar Agarwal | Era Realtors Private Limited | 03/10/2017 |
| CC006000000199339 | Rasshmi Verma | M/s. Era Realtors Pvt. Ltd. and M/s. Omkar Realtors and Developers Pvt. Ltd. | 08/12/2021 |
| CC006000000209351 | Nilesh Brijraj Singh and Bharat Nilesh Singh | M/S. ERA REALTORS AND OMKAR REALTORS AND DEVELOPERS PRIVATE LIMITED | 09/12/2021 |
| CC006000000001919 | Mr. Rohit Dharambir Malik | Era Realtors Pvt Ltd. & Ors. | 14/11/2017 |
| CC006000000054567 | Rohit Dharambir Malik & Anr | Era Realtors Pvt Ltd & Anr | 19/05/2018 |
| CC006000000001783 | SANTOSH MOHAN BIJUR | Omkar Realtors and Developers Pvt Ltd | 05/01/2018 |
| CC006000000001908 | Neerav Devendra Shah | Era Realtors Private Limited | 21/11/2017 |
| CC006000000193955 | PANKAJ KAMAL AGARWAL | Era Realtors Private Limited | 20/10/2020 |
| CC006000000058061 | BIJOYA LAXMI GANTAYAT | ERA REALTORS PRIVATE LIMITED | 12/02/2019 |
| CC006000000012202 | Samir K Desai | Era Realtors Pvt. Ltd. | 01/12/2017 |
| CC006000000171571 | Mr Mukesh Chetram Agrawal | M/s. ERA Realtors Private Limited | 17/11/2019 |
| CC006000000194232 | Mr. Bhavesh Bhavanishanker Oza | 1. M/s. ERA Realtors Private Limited | 01/10/2020 |
| CC006000000012376 | Ashish Kulkarni | Era Realtors Private Limited | 17/02/2018 |
| CC006000000044309 | Ashish Kulkarni | era realtors private limited | 14/05/2018 |
| CC006000000023920 | M/S Anurag Shrivastav HUF | Era Realtors Private Limited | 18/04/2018 |
| CC006000000056045 | AJAY NADKARNI | ERA REALTORS PVT. LTD. | 10/02/2019 |
| CC006000000044186 | VIJAY ATHWANI | Omkar Realtors& Developers Private Limited | 15/06/2018 |
| CC006000000194379 | Abhishek Bholanath Mishra | ERA Realtors Private Limited | 12/10/2020 |
| CC006000000054677 | AMIT JAIN | Era Realtors Private Limited | 28/05/2018 |
| CC006000000054856 | Ravindra V Revankar | Era Realtors Pvt Ltd | 11/06/2018 |
| CC006000000195601 | Pratik Sinha & Anr. | Era Realtors Private Limited | 13/01/2021 |
| CC006000000195603 | Pramodini R Modi & Anr | Era Realtors Pvt Ltd | 13/01/2021 |
| CC006000000195605 | Anil Jaggi & Anr | Era Realtors Private Limited & Anr | 13/01/2021 |
| CC006000000195606 | Gorachand Adhikari & Anr. | Era Realtors Private Limited & Anr. | 13/01/2021 |
| CC006000000195607 | Anuj Jalota and Anr. | Era Realtors Pvt. Ltd. | 13/01/2021 |
| CC006000000195615 | VIRENDER KUMAR SAROHA | Era Realtors Pvt. Ltd. | 13/01/2021 |
| CC006000000195620 | Rupali Vivek Shrivastava &Anr | Era Realtors Pvt. Ltd. | 13/01/2021 |
| CC006000000195621 | MANISH BHAWANI | Era Realtors Pvt. Ltd. | 13/01/2021 |
| CC006000000195623 | Vinay Nair and Anr | Era Realtors Pvt. Ltd. | 13/01/2021 |
| CC006000000198450 | Mukesh Agrawal | Era Realtors Private Limited and Anr | 24/09/2021 |
| CC006000000078239 | Debraj Chowdhury | ERA REALTORS PVT LTD | 25/02/2019 |
| CC006000000057087 | Mr. Sunil Shah | M/s Era Realtors Pvt. Ltd. | 01/12/2018 |
| CC006000000057248 | Pracheen Chauhan | Omkar Realtors and Developers Private Limited | 11/12/2018 |
| CC006000000195755 | Adish Sampat Jain & Ors. | Era Realtors Private Limited | 27/01/2021 |
| CC006000000141145 | ANILA VINAYAK | ERA REALTORS PRIVATE LIMITED | 03/10/2019 |
| CC006000000057858 | MANOJKUMAR SINGH | ERA REALTORS PVT LTD | 30/01/2019 |
| CC006000000282178 | Manoj Singh | ERA REALTORS PVT LTD | 02/08/2022 |
| CC006000000058049 | Yogesh Kapur | Era Realtors Private Limited | 12/02/2019 |
| CC006000000058126 | Prakash Shah | Era Realtors Pvt. Ltd. | 21/02/2019 |
| CC006000000078224 | Nimesh Pandya | ERA REALTORS PVT LTD | 23/02/2019 |
| CC006000000196530 | Mr. VijayTulshyan | Era Realtors Pvt. Ltd. | 28/03/2021 |
| CC006000000196704 | Mrs. Sheela Saraf | Era Realtors Pvt. Ltd. | 12/04/2021 |
| CC006000000079234 | HOZEFA S PATANWALA | ERA REALTORS PVT LTD | 10/05/2019 |
| CC006000000079235 | PRAKASH K SURVE | ERA REALTORS PVT LTD | 10/05/2019 |
| CC006000000079233 | NEERAJ SANGHI | ERA REALTORS PRIVATE LIMITED | 10/05/2019 |
| CC006000000089596 | HEMANT DESHPANDE | ERA REALTORS PVT LTD | 04/06/2019 |
| CC006000000100264 | MAB Aviation Pvt. Ltd | Omkar Realtoras & Developers Pvt.Ltd & OTR | 23/07/2019 |
| CC006000000100600 | Rohit Kumar | Omkar Realtors and Developers Private Ltd | 20/08/2019 |
| CC006000000197062 | Rohit Kumar | Era Realtors Pvt Ltd | 24/05/2021 |
| CC006000000100494 | Umashankkar Khemka | Omkar Realtors and Developers | 11/08/2019 |
| CC006000000100511 | MR. RAJKUMAR ASHTA | ERA REALTORS P. LTD | 14/08/2019 |
| CC006000000171794 | Sabhajit R Yadav | Era Realtors Private Ltd. | 12/12/2019 |
| CC006000000141005 | Avni Shah | ERA REALTORS PRIVATE LIMITED | 23/09/2019 |
| CC006000000141011 | Rikhav Shah | ERA RELATORS PRIVATE LIMITED | 23/09/2019 |
| CC006000000141012 | Foram Shah | ERA REALTORS PRIVATE LIMITED | 23/09/2019 |
| CC006000000141013 | Foram Shah | ERA REALTORS PRIVATE LIMITED | 23/09/2019 |
| CC006000000171587 | Ritesh Kumar Jain | Omkar Realtors & Developers Pvt Ltd | 20/11/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Jun 2022
Documents filed417
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 417 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Annexure-A_Form-1_Architects Certificate 30 03 2026_FY 25-26_Q4.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 _Annexure-II Jan26 to Mar26-With Sign.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 March 26 signed.pdf | 29 Jun 2026 |
| Form 1File: Form 1 (1).pdf | 1 Apr 2026 |
| Form 2File: Form 2 - 31-03-2025.pdf | 1 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2024-2025 Q4 A-S.pdf | 1 Apr 2026 |
| Form 3File: Form-3 March 2025 Signed1.pdf | 1 Apr 2026 |
| Form 1File: Form 1.pdf | 1 Apr 2026 |
| Form 2File: Form 2 - 30-06-2025.pdf | 1 Apr 2026 |
| Form 3File: Form 3 June 25_.pdf | 1 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: FY 2025-2026 Q1 A_S.pdf | 1 Apr 2026 |
| Form 1File: Form1.pdf | 1 Apr 2026 |
| Form 2File: Form 2 30-09-2025.pdf | 1 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 1 Apr 2026 |
| Form 3File: Form 3 Sept 25.pdf | 1 Apr 2026 |
| Form 1File: Form 1.pdf | 1 Apr 2026 |
| Form 2File: Form 2 - 31-12-2025.pdf | 1 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure -.pdf | 1 Apr 2026 |
| Form 3File: Form 3 Dec_.pdf | 1 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2025.pdf | 1 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form5.pdf | 1 Apr 2026 |
| Form 2A (FY 2017-2018)File: Quality Assurance Certifficate - 31-03-2018 Form 2A.pdf | 14 Mar 2026 |
| Form 2A (FY 2018-2019)File: Quality Assurance Certifficate - 31-03-2019 Form 2A.pdf | 14 Mar 2026 |
| Form 2A (FY 2019-2020)File: Quality Assurance Certifficate - 31-03-2020 Form 2A.pdf | 14 Mar 2026 |
| Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 14 Mar 2026 |
| Form 2A (FY 2021-2022)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf | 14 Mar 2026 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 14 Mar 2026 |
| Form 5 (FY 2022-2023)File: Form 5.pdf | 14 Mar 2026 |
| Form 5 (FY 2020-2021)File: 5 Certificated of CA (FORM)5.pdf | 14 Mar 2026 |
| Form 5 (FY 2017-2018)File: 1 Certificates of CA (FORM)5.pdf | 14 Mar 2026 |
| Form 5 (FY 2018-2019)File: 2 Certificates of CA (FORM)5.pdf | 14 Mar 2026 |
| Form 5 (FY 2019-2020)File: 4 Certificates of CA (FORM)5.pdf | 14 Mar 2026 |
| Form 1File: Form 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: Form 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: Certificates of Architect (Form 1)(Mandatory for only ongoing project)-7-12.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: 2017-18 FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FY- 2018-2019 FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)-7-12.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: Form 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: Form 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: FORM 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: 4 Certificates of CA FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: fORM 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: FY- 2019-2020 FORM 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: FORM 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: Form 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: FORM 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: Form 3.pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
| Form 1File: FORM 1.pdf | 13 Mar 2026 |
| Form 2File: Form 2.pdf | 13 Mar 2026 |
| Form 3File: 11 Certificates of CA (Form 3).pdf | 13 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 13 Mar 2026 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Alta Monte Tower C | Alta Monte C Malad East Mumbai 400097 | 326 | Completed | Jul 2017 | Jul 2017 |
| ALTA MONTE TOWER A | ALTAMONTE MALAD EAST MUMBAI 400097 | 343 | Completed | Dec 2015 | Dec 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 417 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Alta Monte and Signet on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kokanipada, Malad East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 338 registered projects within 2 km.
MAULI OMKAR
MAULI SAI DEVELOPERS PVT LTD
HIVE 97
AMITY CONSTRUCTIONS
MAULI PRIDE
MAULI SAI DEVELOPERS PVT LTD
Aarambh Phase III by group Satellite
Satellite Developers Private Limited
Sethia Imperial Avenue
Sai Enterprises
PEARL ICON
BAHIST ENTERPRISES PVT LTD
See every Mumbai Suburban project, with the district possession charts
Builder: ERA REALTORS PRIVATE LIMITED
ERA REALTORS PRIVATE LIMITED has 1 registration on MahaRERA, including Alta Monte and Signet. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Alta Monte and Signet is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Alta Monte and Signet?
The registered promoter entity is ERA REALTORS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Alta Monte and Signet?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Alta Monte and Signet?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Alta Monte and Signet?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Alta Monte and Signet?
The professionals named in the filing: Architect: Anand V Dhokay; Engineer: Achyut Watve; Engineer: PRASAD SHETTY; Chartered Accountant: NEELESH JAIN & ASSOCIATES; Chartered Accountant: N. A. Shah Associates LLP; Chartered Accountant: S S M H & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Alta Monte and Signet?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback