Home / Browse projects / Mumbai Suburban, Maharashtra / LAXMI SHRUSHTI - WING B

Registered No litigation declared Residential / Group Housing project

LAXMI SHRUSHTI - WING B

By LAXMIDEVI DEVELOPERS

RG-MH-59571 · RERA P51800030965 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 22 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 22 months from the original
6 of 11Construction stages donefurthest along: Staircases, 98%
0 of 129Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 286 documents Report an error

LAXMI SHRUSHTI - WING B is a Residential / Group Housing project by LAXMIDEVI DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030965 on 29 Sep 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 22 months from the original filing. 129 of the 129 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameLAXMI SHRUSHTI - WING B
  • TypeResidential / Group Housing
  • Location
    • VILLEGE PAHADI GOREGAON AT TEEN DONGRI SIVAJI NAGAR
    • GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400090
  • Pincode400090
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030965
  • ReraGenie IDRG-MH-59571

Builder

  • NameLAXMIDEVI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAEFL2308J1ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBharat Ashulal Kothari, Rakesh Ashulal Kothari, Gunvant Ashulal Kothari
  • Other registrations6 more →
  • Completed5 of 7
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredSep 2021First promiseAug 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed286 files

Current status

100%129 of 129 units booked
96.9%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Laxmi Shrushti- Wing BNA27221290129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

Laxmi Shrushti- Wing B: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes97%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes98%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,685 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Mar 2026
LandownerVillageDistrict
MAHDABorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI6775.0
Proposed, not sanctioned5,018 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO C AND D A K PLAZA OPP MTNL GOREGAON WEST MUMBAI 400104
Estimated costRs 88.50 cr
Cost incurredRs 85.72 cr
Work done96.86%
BuildingWingEstimatedIncurred
Laxmi Shrushti- Wing BNARs 50.00 crRs 49.79 cr
-NARs 38.50 crRs 35.94 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRasik P Hingoo Associates
EngineerDINESH MEHTA
EngineerHitesh J Shah
Chartered AccountantAMPAC & ASSOCIATES
Chartered AccountantJAIN ANIL & ASSOCIATES
Chartered AccountantPIYUSH SHETH
Chartered AccountantAkshay & Co
PartnerRole in project
LAXMIDEVI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31032620480Aug 2025 → Jun 2027

Reason as filed by the promoterSince NOC is pending for Religious Structure (Temple) from Urban Development Department, as the authorities have linked the development of the Temple in Rehab building. Due to this Sale component O.C. is pending.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12400001Amolika BandiwadekarLAXMIDEVI DEVELOPERS09/09/2024
SM12400002Amolika BandiwadekarLAXMIDEVI DEVELOPERS23/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed286

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 286 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf1 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf1 Jul 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf1 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Jun 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 (1).pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf31 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf31 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf31 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Mar 2026
Form 2A (FY 2021-2022)File: Form 2A.pdf25 Mar 2026
Form 2A (FY 2022-2023)File: Form 2A.pdf25 Mar 2026
Form 2A (FY 2023-2024)File: Form 2A.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Mar 2026
Form 5 (FY 2024-2025)File: Form 5.pdf16 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A_compressed.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf6 Jan 2026

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LUXURY CHSL LTDP51800050568BEHIND FILMISTAN, Mumbai Suburban63Apr 2023OngoingJun 2025Not delivered
LAXMI ANNEXP51800026325JAWAHAR NAGAR GOREGAON WEST, Mumbai Suburban21Sep 2020CompletedJun 2023Jul 2022
LAXMI CALLISTAP51800010929Goregaon West, Mumbai Suburban90Aug 2017CompletedSep 2019Late, Dec 2020
Laxmi HeightsJawhar Nagar Road No 16 Goregaon west35-CompletedDec 2018Nov 2018
Laxmi EnclaveNadaidwala compound SV Road Malad west24-CompletedJun 2018Mar 2018
laxmi VillaJawahr Nagar Road No. 0337-CompletedJun 2018May 2018

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 22 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI SHRUSHTI - WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

2 kmLAXMI SHRUSHTI - WING BCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: LAXMIDEVI DEVELOPERS

LAXMIDEVI DEVELOPERS has 7 registrations on MahaRERA, including LAXMI HEIGHTS and LAXMI CALLISTA. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LAXMI SHRUSHTI - WING B is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI SHRUSHTI - WING B?

The registered promoter entity is LAXMIDEVI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAEFL2308J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI SHRUSHTI - WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAXMI SHRUSHTI - WING B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAXMI SHRUSHTI - WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI SHRUSHTI - WING B?

The professionals named in the filing: Architect: Rasik P Hingoo Associates; Engineer: DINESH MEHTA; Engineer: Hitesh J Shah; Chartered Accountant: AMPAC & ASSOCIATES; Chartered Accountant: JAIN ANIL & ASSOCIATES; Chartered Accountant: PIYUSH SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI SHRUSHTI - WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI SHRUSHTI - WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI SHRUSHTI - WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.