Kekarav Phase II

By SHREM TRADING LLP

RG-MH-22306 · RERA P52100031548 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 66 months from the original
6 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Kekarav Phase II is a Plotted project by SHREM TRADING LLP in Pune, Maharashtra, registered with MahaRERA as P52100031548 on 25 Oct 2021. Possession is promised by 31 Mar 2028. The completion date has moved by 66 months from the original filing. 11 of the 17 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKekarav Phase II
  • TypePlotted
  • Location
    • Bavdhan Road
    • Bavadhan Budruk
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100031548
  • ReraGenie IDRG-MH-22306

Builder

  • NameSHREM TRADING LLP
  • Entity typePartnership
  • GSTIN27ABYFS9682H1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHITESH RAMPRAKSH CHHATWAL, SMITA NITAN CHHATWAL, NITAN RAMPRAKASH CHHATWAL
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2021First promiseSep 2022Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2021
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 Sep 2022)
  • BuildingsNot stated in filing
  • Documents filed107 files

Current status

65%11 of 17 units booked
142.8%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area174,670 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 May 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor, Shri Amba Shanti Chambers, Opp Hotel Leela, Andheri Kurla Road, Andheri East, Mumbai, Maha
Estimated costRs 5.50 cr
Cost incurredRs 7.85 cr
Work done142.79%
BuildingWingEstimatedIncurred
-NARs 5.50 crRs 7.85 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A Architecture
EngineerGeetanjali Chappar
Chartered AccountantK K S S & Associates
Chartered AccountantM. K. Doshi & Associates
Chartered AccountantN N Bagwan and Associates
PartnerRole in project
SHREM TRADING LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02072501922Sep 2022 → Dec 2025

Reason as filed by the promoterAs per revised sanction layout plan dated 28-4-2025 Sector 2A has been defined in the sanction plan. Promoter is intending to register/merge this Sector 2A under the banner of RERA project KEKARAV Phase II. This Sector 2A involving plot no Plot A, Plot No. 203, 204, 205, 206 & 207 s interlinked to Sector 2 and considering the future plans, execution of the works, management of the project and society formation works it will be easy to manage the various things. We believe that this merger of Sector 2 & 2A will allow us to implement the proposed enhancements and deliver a project that meets the

EA12022619810Sep 2022 → Mar 2028

Reason as filed by the promoterWe M/s. Shrem Trading LLP along with M/s Midori Realty LLP (owner of Sector 4) have obtained sanctioned layout plan for total 1,74,670 Sq Mtr land area having 292 plots in total. This sanctioned layout plan has been divided in 4 sectors and registered with MahRERA Authority in various phases by the promoter & M/s Midori Realty LLP under the brand name KEKARAV (As a whole). For better execution and management, we are executing this project in multiple phases. As on date Phase 2 consist of 17 plots is completed in all respect and possession of all sold/booked plots already handed over to the all

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Jul 2023

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: S2 Form 1 March 26.pdf3 Jul 2026
Withdrawal Update Form 2File: S2 Form 2 March 26.pdf3 Jul 2026
Withdrawal Update Form 3File: S2 Form 3 March 26.pdf3 Jul 2026
Form 5 (FY 2023-2024)File: Form 5 23-24 Phase II.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 24-25 Phase II.pdf12 Feb 2026
Withdrawal Update Form 1File: FORM-1 SECTOR-2 31_12_2025.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM 2 SECTOR 2 31_12_2025.pdf27 Jan 2026
Withdrawal Update Form 3File: FORM 3 SECTOR 2 31_12_2025.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1 June 25.pdf26 Sep 2025
Withdrawal Update Form 2File: Form 2 June 25.pdf26 Sep 2025
Withdrawal Update Form 3File: Form 3 26-9-25.pdf26 Sep 2025
Withdrawal Update Form 1File: Form 1 June 25.pdf23 Sep 2025
Withdrawal Update Form 2File: Form 2 June 25.pdf23 Sep 2025
Withdrawal Update Form 3File: Revised Signed Form 3 June 25 CA Certificate v2.pdf23 Sep 2025
Form 1File: Form 1 23-24.pdf22 Sep 2025
Form 2File: Form 2 March 24.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2023-2024.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 24.pdf22 Sep 2025
Form 1File: Form 1 24-25.pdf22 Sep 2025
Form 2File: Form 2 Decl 24-25.pdf22 Sep 2025
Form 3File: Form 3 Decl 24-25.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 25.pdf22 Sep 2025
Form 1File: Form 1 24-25.pdf22 Sep 2025
Form 2File: Form 2 Decl 24-25.pdf22 Sep 2025
Form 3File: Form 3 Decl 24-25.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 24- 25.pdf22 Sep 2025
Form 1File: Form 1 24-25.pdf22 Sep 2025
Form 2File: Form 2 Decl 24-25.pdf22 Sep 2025
Form 3File: Form 3 Decl 24-25.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 24- 25.pdf22 Sep 2025
Form 1File: Form 1 24-25.pdf22 Sep 2025
Form 2File: Form 2 Decl 24-25.pdf22 Sep 2025
Form 3File: Form 3 Decl 24-25.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 24- 25.pdf22 Sep 2025
Form 1File: Form 1 March 23.pdf22 Sep 2025
Form 2File: Form 2 March 23.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2022-2023.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 22- 23.pdf22 Sep 2025
Form 1File: Form 1 23-24.pdf22 Sep 2025
Form 2File: Form 2 23- 24.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2023-2024.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 23-24.pdf22 Sep 2025
Form 1File: Form 1 23-24.pdf22 Sep 2025
Form 2File: Form 2 23- 24.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2023-2024.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 23-24.pdf22 Sep 2025
Form 1File: Form 1 23-24.pdf22 Sep 2025
Form 2File: Form 2 23- 24.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2023-2024.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 23-24.pdf22 Sep 2025
Form 1File: Form 1 22- 23.pdf22 Sep 2025
Form 2File: Form 2 22- 23.pdf22 Sep 2025
Form 3File: FORM 3 - SECTOR -2 FY 2022-2023.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 22- 23.pdf22 Sep 2025
Form 1File: 11Form1 for Sept 22.pdf2 Jul 2025
Form 2File: 13Form2 for Sept 22.pdf2 Jul 2025
Form 3File: 20Form3 Sept 22.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 23.pdf2 Jul 2025
Form 1File: 11Form1.pdf2 Jul 2025
Form 2File: 13Form2.pdf2 Jul 2025
Form 3File: 20Form3.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf2 Jul 2025
Form 1File: 9Form 1 At Regn.pdf29 Jun 2025
Form 2File: 12Form2 Dec 21.pdf29 Jun 2025
Form 3File: 19Form3 Dec 21.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 22.pdf29 Jun 2025
Form 1File: 10Form1 March 22.pdf29 Jun 2025
Form 2File: 13Form2 for Sept 22.pdf29 Jun 2025
Form 3File: 20Form3 Sept 22.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 22.pdf29 Jun 2025
Form 5 (FY 2022-2023)File: 22Form5 22-23.pdf29 Jun 2025
Form 5 (FY 2021-2022)File: 21Form5 21-22.pdf19 May 2025
Architect’s Certificate on Completion of Project (Form 4)File: Upload- Form 4 - Sector 2.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 03-07-2023 Response to Query.pdf3 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 2_FORM 5 MAHARERA 22-23_0001.pdf27 Jun 2023
Status of ConveyanceFile: Letter for Society.pdf3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM -5_FY_2021-2022_Phase_II.pdf19 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 -Sector 2.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 SECTOR - 3.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 SECTOR - 2.pdf30 Nov 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kekarav Phase IIIP52100034729Bavdhan Bk, Pune92Apr 2022OngoingJun 2025Registered original: Jun 2023Not delivered
Kekarav Phase IP52100025894Bavdhan, Pune86Jul 2020CompletedMar 2024Registered original: Jul 2022Mar 2024

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 66 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kekarav Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavadhan Budruk13,700+ in Pune

Builder: SHREM TRADING LLP

SHREM TRADING LLP has 4 registrations on MahaRERA, including Kekarav Phase I and Kekarav Phase II. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kekarav Phase II is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kekarav Phase II?

The registered promoter entity is SHREM TRADING LLP, a partnership as per the filing. Its GSTIN 27ABYFS9682H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kekarav Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kekarav Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kekarav Phase II?

The professionals named in the filing: Architect: VK A Architecture; Engineer: Geetanjali Chappar; Chartered Accountant: K K S S & Associates; Chartered Accountant: M. K. Doshi & Associates; Chartered Accountant: N N Bagwan and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kekarav Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kekarav Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kekarav Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.