Home / Browse projects / Pune, Maharashtra / GANGA PLATINUM A

Registered Litigation declared Residential / Group Housing project

GANGA PLATINUM A

By SHREE BALAJI ASSOCIATES PUNE LLP

RG-MH-22451 · RERA P52100031418 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 7 complaints at MahaRERA
  • Completion date moved by 10 months
  • 2 extensions taken
  • Rs 130.00 crore secured on the land, in favour of INDUSIND BANK LTD

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 97%
21 of 125Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

GANGA PLATINUM A is a Residential / Group Housing project by SHREE BALAJI ASSOCIATES PUNE LLP in Pune, Maharashtra, registered with MahaRERA as P52100031418 on 23 Oct 2021. Possession is promised by 31 Oct 2026. The completion date has moved by 10 months from the original filing. 104 of the 125 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA PLATINUM A
  • TypeResidential / Group Housing
  • Location
    • Maharashtra
    • Kharadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411014
  • Pincode411014
  • RERA no.P52100031418
  • ReraGenie IDRG-MH-22451

Builder

  • NameSHREE BALAJI ASSOCIATES PUNE LLP
  • Entity typePartnership
  • GSTIN27ABDFS3963Q1ZE
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersGANGA HOUSING PVT LTD NA, ANURAG SUBHASH GOEL
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2021First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed115 files

Current status

83%104 of 125 units booked
91.4%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA36301250125

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

BUILDING A: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,958 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofINDUSIND BANK LTD
Secured amountRs 130.00 crore
CERSAI search filedYes
Declared on22 Jan 2026

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation Pune
Permissible FSI12120.21
Proposed, not sanctioned5,920 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM G ROAD PUNE CAMP PUNE 411001
Estimated costRs 72.85 cr
Cost incurredRs 66.61 cr
Work done91.44%
BuildingWingEstimatedIncurred
BUILDING ANARs 68.85 crRs 63.28 cr
-NARs 4.00 crRs 3.33 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAMOD DESHPANDE
ArchitectSAMEER VALIMBE
EngineerChandrashekhar D Tendulkar
EngineerYOGESH VIRVADEKAR
Chartered AccountantCA SHEETAL GADIYA
Chartered AccountantMAHESH BHARAT CHANDORKAR
Chartered AccountantATUL HATTARGE
Chartered AccountantCA MAHESH CHANDORKAR
Chartered AccountantDINESH CHANDRA GOYAL
PartnerRole in project
SHREE BALAJI ASSOCIATES PUNE LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04112518234Dec 2025 → Jun 2026

Reason as filed by the promoter1. The project is 85% complete. 2. Consent of 99.04% of allottees has been uploaded for extension. 3. The consent is provided in Clause 10 of all the annexures uploaded. 4. Revised Form B has been uploaded. 5. The PERT Chart showing the remaining work schedule is uploaded under Other Tab No. 1. 6. Quarterly Progress Reports (QPR) have been updated till the latest period. 7. Due to unavoidable circumstances, the project has been delayed. 8. The revised expected completion date is 30/06/2026. 9. We assure you we will procure Occupancy Certificate within stipulated time.

EA23062621487Dec 2025 → Oct 2026

Reason as filed by the promoter1. The Project is approximately 90% completed 2. Form B uploaded 3. PERT for the remaining completion work is uploaded in the Application 4. The Project got delayed due to following reasons:- a. Due to the prevailing war situation and its consequential impact on the supply chain, there has been a severe shortage of construction materials and labour, adversely affecting the progress of the project. As a result, the project schedule has been disrupted. We request MahaRERA to grant an extension till 31/10/2026. We remain committed to timely completion in the interest of all stakeholder We hereby

Litigation declared1

CaseCourtStatus
0/0000puneClosed

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC12604502Rishav KumarSHREE BALAJI ASSOCIATES PUNE LLP18/07/2026
CC12604752Pankaj NatuSHREE BALAJI ASSOCIATES PUNE LLP28/07/2026
CC12604768Ajay Kumar AgarwalSHREE BALAJI ASSOCIATES PUNE LLP29/07/2026
CC12604778Sharda Ranjeet MishraSHREE BALAJI ASSOCIATES PUNE LLP29/07/2026
CC12604915Parag Bhaskar MahajanSHREE BALAJI ASSOCIATES PUNE LLP03/08/2026
CC12605050Ritesh Kumar JainSHREE BALAJI ASSOCIATES PUNE LLP08/08/2026
CC12605094Tushar Sanjay PatilSHREE BALAJI ASSOCIATES PUNE LLP10/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A GANGA PLATINUM A 2025-26.pdf14 Jul 2026
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A JUN 26.pdf10 Jul 2026
Withdrawal Update Form 2File: FORM 2 GANGA PLATINUM A JUN 26.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM 3 GANGA PLATINUM A JUN 26.pdf10 Jul 2026
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A MAR 26.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2 GANGA PLATINUM A MAR 26.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3 GANGA PLATINUM A MAR 26.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A MAR 26.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2 GANGA PLATINUM A MAR 26.pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3 GANGA PLATINUM A MAR 26.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A SEP 25.pdf10 Jan 2026
Withdrawal Update Form 2File: FORM 2 GANGA PLATINUM A DEC 25.pdf10 Jan 2026
Withdrawal Update Form 3File: FORM 3 GANGA PLATINUM A DEC 25.pdf10 Jan 2026
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A SEP 25.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM 2 GANGA PLATINUM A SEP 25.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3 GANGA PLATINUM A SEP 25.pdf14 Oct 2025
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A JUN 25.pdf22 Jul 2025
Withdrawal Update Form 1File: FORM 1 GANGA PLATINUM A JUN 25.pdf22 Jul 2025
Withdrawal Update Form 2File: 15 Form 2 Er Cert Ganga Platinum A Jun 25.pdf22 Jul 2025
Withdrawal Update Form 2File: 15 Form 2 Er Cert Ganga Platinum A Jun 25.pdf22 Jul 2025
Withdrawal Update Form 3File: 15 Form 3 CA Cert Ganga Platinum A Jun 25.pdf22 Jul 2025
Withdrawal Update Form 3File: 15 Form 3 CA Cert Ganga Platinum A Jun 25.pdf22 Jul 2025
Form 1File: 6 Form 1 Ar Cert Ganga Platinum A Mar 23.pdf14 Jul 2025
Form 2File: 6 Form 1 Er Cert Ganga Platinum A Mar 23.pdf14 Jul 2025
Form 3File: 6 Form 3 CA Cert Ganga Platinum A Mar 23_compressed.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: MAR 23.pdf14 Jul 2025
Form 1File: 7 Form 1 Ar Cert Ganga Platinum A Jun 23.pdf14 Jul 2025
Form 2File: 7 Form 1 Er Cert Ganga Platinum A Jun 23.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: JUN 23.pdf14 Jul 2025
Form 3File: 7 Form 3 CA Cert Ganga Platinum A Jun 23.pdf14 Jul 2025
Form 1File: 8 Form 1 Ar Cert Ganga Platinum A Sep 23.pdf14 Jul 2025
Form 2File: 8 Form 1 Er Cert Ganga Platinum A Sep 23.pdf14 Jul 2025
Form 3File: 8 Form 3 CA Cert Ganga Platinum A Sep 23.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: SEP 23.pdf14 Jul 2025
Form 1File: 9 Form 1 Ar Cert Ganga Platinum A Dec 23.pdf14 Jul 2025
Form 2File: 9 Form 1 Er Cert Ganga Platinum A Dec 23.pdf14 Jul 2025
Form 3File: 9 Form 3 CA Cert Ganga Platinum A Dec 23.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 23.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: MAR 24.pdf14 Jul 2025
Form 1File: 10 Form 1 Ar Cert Ganga Platinum A Mar 24.pdf14 Jul 2025
Form 2File: 10 Form 1 Er Cert Ganga Platinum A Mar 24.pdf14 Jul 2025
Form 3File: 10 Form 3 CA Cert Ganga Platinum A Mar 24.pdf14 Jul 2025
Form 1File: 11 Form 1 Ar Cert Ganga Platinum A Jun 24.pdf14 Jul 2025
Form 2File: 11 Form 1 Er Cert Ganga Platinum A Jun 24.pdf14 Jul 2025
Form 3File: 11 Form 3 CA Cert Ganga Platinum A Jun 24.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: JUN 24.pdf14 Jul 2025
Form 1File: 13 Form 1 Ar Cert Ganga Platinum A Dec 24.pdf14 Jul 2025
Form 2File: 13 Form 1 Er Cert Ganga Platinum A Dec 24.pdf14 Jul 2025
Form 3File: 13 Form 3 CA Cert Ganga Platinum A Dec 24.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 24.pdf14 Jul 2025
Form 1File: 12 Form 1 Ar Cert Ganga Platinum A Sep 24.pdf14 Jul 2025
Form 2File: 12 Form 1 Er Cert Ganga Platinum A Sep 24.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: SEP 24.pdf14 Jul 2025
Form 3File: 12 Form 3 CA Cert Ganga Platinum A Sep 24.pdf14 Jul 2025
Form 1File: 1 Form 1 Ar Cert Ganga Platinum A Dec 21.pdf14 Jul 2025
Form 2File: 1 Form 1 Er Cert Ganga Platinum A Dec 21.pdf14 Jul 2025
Form 3File: 1 Form 3 CA Cert Ganga Platinum A Dec 21.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 23.pdf14 Jul 2025
Form 1File: 2 Form 1 Ar Cert Ganga Platinum A Mar 22.pdf14 Jul 2025
Form 2File: 2 Form 1 Er Cert Ganga Platinum A Mar 22.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: MAR 23.pdf14 Jul 2025
Form 3File: 2 Form 3 CA Cert Ganga Platinum A Mar 22.pdf14 Jul 2025
Form 1File: 3 Form 1 Ar Cert Ganga Platinum A Jun 22.pdf14 Jul 2025
Form 2File: 3 Form 1 Er Cert Ganga Platinum A Jun 22.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: MAR 23.pdf14 Jul 2025
Form 3File: 3 Form 3 CA Cert Ganga Platinum A Jun 22.pdf14 Jul 2025
Form 1File: 4 Form 1 Ar Cert Ganga Platinum A Sep 22.pdf14 Jul 2025
Form 2File: 4 Form 1 Er Cert Ganga Platinum A Sep 22.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 23.pdf14 Jul 2025
Form 3File: 4 Form 3 CA Cert Ganga Platinum A Sep 22.pdf14 Jul 2025
Form 3File: 5 Form 3 CA Cert Ganga Platinum A Dec 22.pdf14 Jul 2025
Form 1File: 5 Form 1 Ar Cert Ganga Platinum A Dec 22.pdf14 Jul 2025
Form 2File: 5 Form 1 Er Cert Ganga Platinum A Dec 22.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 23.pdf14 Jul 2025
Form 2A (FY 2021-2022)File: FORM 2A GANGA PLATINUM A 2021-22.pdf14 Jul 2025
Form 2A (FY 2022-2023)File: FORM 2A GANGA PLATINUM A 2022-23.pdf14 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A GANGA PLATINUM A 2023-24.pdf14 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A GANGA PLATINUM A 2024-25.pdf14 Jul 2025
Form 5 (FY 2021-2022)File: Shree balaji Associates Pune LLp 2021-22.pdf14 Jul 2025
Form 5 (FY 2022-2023)File: Shree Balaji Associates Pune LLP 2022-23.pdf14 Jul 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA NEWTOWN PH 5 E BLDGP52100079278DHANORI, Pune147Feb 2025Certificate SignedJun 2028May 2026
GANGA NEWTOWN PH 4 D BldgP52100055461DHANORI, Pune231Mar 2024Certificate SignedDec 2027Registered original: Jun 2027Not due yet
GANGA NEWTOWN PH 3 C BldgP52100034400DHANORI, Pune-Apr 2022Certificate SignedJun 2026May 2026
Ganga Newtown Ph 02P52100019275PORWAL ROAD-Jan 2019CompletedDec 2025May 2025

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 10 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA PLATINUM A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi13,700+ in Pune

Builder: SHREE BALAJI ASSOCIATES PUNE LLP

SHREE BALAJI ASSOCIATES PUNE LLP has 10 registrations on MahaRERA, including GANGA NEWTOWN PHASE I and Ganga Newtown Ph 02. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANGA PLATINUM A is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA PLATINUM A?

The registered promoter entity is SHREE BALAJI ASSOCIATES PUNE LLP, a partnership as per the filing. Its GSTIN 27ABDFS3963Q1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA PLATINUM A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA PLATINUM A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA PLATINUM A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA PLATINUM A?

The professionals named in the filing: Architect: AR PRAMOD DESHPANDE; Architect: SAMEER VALIMBE; Engineer: Chandrashekhar D Tendulkar; Engineer: YOGESH VIRVADEKAR; Chartered Accountant: CA SHEETAL GADIYA; Chartered Accountant: MAHESH BHARAT CHANDORKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA PLATINUM A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA PLATINUM A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA PLATINUM A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.