Home / Browse projects / Pune, Maharashtra / GANGA NEWTOWN PH 5 E BLDG
GANGA NEWTOWN PH 5 E BLDG
By SHREE BALAJI ASSOCIATES PUNE LLP
RG-MH-30944 · RERA P52100079278 · Last updated on MahaRERA portal: 22 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- Rs 9.00 crore secured on the land, in favour of INDUSIND
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA NEWTOWN PH 5 E BLDG is a Residential / Group Housing project by SHREE BALAJI ASSOCIATES PUNE LLP in Pune, Maharashtra, registered with MahaRERA as P52100079278 on 25 Feb 2025. Possession is promised by 30 Jun 2028. 58 of the 147 units on this registration are recorded sold or booked, and 10 of 33 construction stages are filed complete.
At a glance
Project
- NameGANGA NEWTOWN PH 5 E BLDG
- TypeResidential / Group Housing
- Location
- DHANORI
- Pune (M Corp.)
- Pune City
- Pune
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100079278
- ReraGenie IDRG-MH-30944
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Feb 2025
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings3 building records
- Documents filed68 files
Current status
Figures as on 22 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E1 | NA | 19 | 13 | 77 | 0 | 77 |
| E2 | NA | 19 | 10 | 65 | 0 | 65 |
| E3 | NA | 6 | 6 | 5 | 0 | 5 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 70%.
E152%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 36% |
| Sanitary Fittings within the flats / premises | 3% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E262%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E38%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 20% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| E1 | 65 | 65 |
| E2 | 3 | 3 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| E1 | NA | Rs 23.07 cr | Rs 6.00 cr |
| E2 | NA | Rs 21.31 cr | Rs 3.60 cr |
| E3 | NA | Rs 20.76 cr | Rs 2.40 cr |
| - | NA | Rs 6.05 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS PARVEZ JAMADAR AND ASSOCIATES |
| Engineer | SANJEEV GAIKWAD |
| Engineer | NISHANTT MEMANE |
| Chartered Accountant | MAHESH CHANDORKAR |
| Chartered Accountant | ATUL HATTARGE |
| Partner | Role in project |
|---|---|
| SHREE BALAJI ASSOCIATES PUNE LLP | - |
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 0/0000 | NO | Closed |
| 0/0000 | NO | Closed |
| 00/0000 | NO | Closed |
| 00/0000 | NO | Closed |
| 00/0000 | NO | Closed |
| 0000/0000 | NO | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A GNT 5 2025-26.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 GNT 5 JUN 26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 GNT 5 JUN 26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 GNT 5 JUN 26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 GNT 5 MAR 26.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 GNT 5 MAR 26.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 GNT 5 MAR 26.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 GNT 5 DEC 25.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 GNT 5 DEC 25.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 GNT 5 DEC 25.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 GNT E SEP 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: FORM 3 GNT 5 SEP 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 GNT 5 SEP 25.pdf | 15 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A GNT PHASE 5 2024-25.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 GANGA NEWTOWN PHASE 5 2024-25.pdf | 30 Sep 2025 |
| Form 1File: FORM 1 GNT 5 E BUILDING MAR 25.pdf | 2 Aug 2025 |
| Form 2File: FORM 2 GNT 5 E BUILDING MAR 25.pdf | 2 Aug 2025 |
| Form 3File: FORM 3 GN PHASE 5 E BUILDING MAR 25.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GNT 5 E BUILDING MAR 25.pdf | 2 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 GNT 5 E BUILDING JUN 25.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 GNT 5 E BUILDING JUN 25.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 GN PHASE 5 E BUILDING JUN 25.pdf | 2 Aug 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 3898_20250217194510_001.pdf | 17 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Updated_Format B_Bank Decl_11022025.pdf | 11 Feb 2025 |
| Proforma of Agreement for saleFile: Agreement Newtown.pdf | 24 Jan 2025 |
| Other - TechnicalFile: Declaration cum undertaking_Annexure A_Order 50.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GN E REVISD_compressed.pdf | 21 Jan 2025 |
| Other - TechnicalFile: SS_PMC.pdf | 21 Jan 2025 |
| Other - LegalFile: DECLRATION OF PLOT.pdf | 5 Dec 2024 |
| Declaration about Commencement CertificateFile: DECLARATION CC.pdf | 5 Dec 2024 |
| CERSAI detailsFile: DECLARATION CERSAI.pdf | 5 Dec 2024 |
| Other - TechnicalFile: DECLRATION OF PLOT.pdf | 5 Dec 2024 |
| Building plan approvalFile: 48-57 E1_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 49-57 E1_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 50-57 E1_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 51-57 E1_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 52-57 E1_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 53-57 E2_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 54-57 E2_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 55-57 E2_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 56-57 E2_compressed.pdf | 3 Dec 2024 |
| Building plan approvalFile: 57-57 E3_compressed.pdf | 3 Dec 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 55-57 E2_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 57-57 E3_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 56-57 E2_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 54-57 E2_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 53-57 E2_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 51-57 E1_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 50-57 E1_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 49-57 E1_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 48-57 E1_compressed.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 52-57 E1_compressed.pdf | 3 Dec 2024 |
| Layout approvalFile: E building_ Plot Marking (1)_compressed.pdf | 28 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: E building_ Plot Marking (1)_compressed.pdf | 28 Nov 2024 |
| Other - TechnicalFile: Declaration of Plot Area.pdf | 28 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Er Cert GN E.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ar Cert GN E.pdf | 22 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FIN AVAILED GN E.pdf | 22 Oct 2024 |
| PAN CardFile: SBAPLLP PAN COPY.PDF | 19 Oct 2024 |
| Copy of the legal title reportFile: Newtown E - Title Report.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMB-FIN.pdf | 13 Oct 2024 |
| Declaration in FORM BFile: From B - Newtown E.pdf | 13 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC240724.pdf | 13 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: DEV ALLOT LTR.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMB-FIN.pdf | 13 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEV AGREE LTR.pdf | 13 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf | 13 Oct 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| GANGA NEWTOWN PH 4 D BldgP52100055461 | DHANORI, Pune | 231 | Mar 2024 | Certificate Signed | Dec 2027Registered original: Jun 2027 | Not due yet |
| GANGA NEWTOWN PH 3 C BldgP52100034400 | DHANORI, Pune | - | Apr 2022 | Certificate Signed | Jun 2026 | May 2026 |
| Ganga Newtown Ph 02P52100019275 | PORWAL ROAD | - | Jan 2019 | Completed | Dec 2025 | May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGA NEWTOWN PH 5 E BLDG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANORI13,700+ in Pune
Filed coordinates, straight-line distance. 161 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: SHREE BALAJI ASSOCIATES PUNE LLP
SHREE BALAJI ASSOCIATES PUNE LLP has 10 registrations on MahaRERA, including GANGA NEWTOWN PHASE I and Ganga Newtown Ph 02. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GANGA NEWTOWN PH 5 E BLDG is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA NEWTOWN PH 5 E BLDG?
The registered promoter entity is SHREE BALAJI ASSOCIATES PUNE LLP, a partnership as per the filing. Its GSTIN 27ABDFS3963Q1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA NEWTOWN PH 5 E BLDG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANGA NEWTOWN PH 5 E BLDG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA NEWTOWN PH 5 E BLDG?
The professionals named in the filing: Architect: MS PARVEZ JAMADAR AND ASSOCIATES; Engineer: SANJEEV GAIKWAD; Engineer: NISHANTT MEMANE; Chartered Accountant: MAHESH CHANDORKAR; Chartered Accountant: ATUL HATTARGE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA NEWTOWN PH 5 E BLDG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback