Home / Browse projects / Ganga Newtown Ph 02

Registration lapsed No litigation declared Residential / Group Housing project

Ganga Newtown Ph 02

By SHREE BALAJI ASSOCIATES PUNE LLP

RG-MH-89235 · RERA P52100019275 · Last updated on MahaRERA portal: 14 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Rs 90.00 crore secured on the land, in favour of AXIS BANK LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 completed earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2025Possession promised10 months past this date
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Ganga Newtown Ph 02 is a Residential / Group Housing project by SHREE BALAJI ASSOCIATES PUNE LLP in PORWAL ROAD, 411015, registered with MahaRERA as P52100019275 on 15 Jan 2019. Possession was promised by 30 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameGanga Newtown Ph 02
  • TypeResidential / Group Housing
  • Location
    • DHANORI
    • PORWAL ROAD
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019275
  • ReraGenie IDRG-MH-89235

Builder

  • NameSHREE BALAJI ASSOCIATES PUNE LLP
  • Entity typePartnership
  • GSTIN27ABDFS3963Q1ZE
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersGANGA HOUSING PVT LTD NA, ANURAG SUBHASH GOEL
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

10 months past promisethis monthRegisteredJan 2019PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jan 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1NA180000
B2NA180000
B3NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

B1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed297

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots297
Closed/Covered297
BuildingClosed/CoveredTotal
B19595
B2107107
B39595

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,465 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAXIS BANK LIMITED
Secured amountRs 90.00 crore
CERSAI search filedYes
Declared on11 Nov 2025

Approvals and building plan

Permissible FSI21562.06
Proposed, not sanctioned19,765 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch233 M G ROAD CAMP PUNE 411001

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARVEZ JAMMADAR
PartnerRole in project
SHREE BALAJI ASSOCIATES PUNE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Apr 2025

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GNT 2 DEC 25.pdf14 Jan 2026
Form 1File: FORM 1 GNT B DEC 25.pdf14 Jan 2026
Form 2File: FORM 2 GNT 2 DEC 25.pdf14 Jan 2026
Form 3File: FORM 3 GNT 2 DEC 25.pdf14 Jan 2026
Form 1File: FORM 1 GNT B SEP 25.pdf15 Oct 2025
Form 2File: FORM 2 GNT 2 SEP 25.pdf15 Oct 2025
Form 3File: FORM 3 GNT 2 SEP 25.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PHASE 2 SEP 25.pdf15 Oct 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B SEP 2024.pdf19 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B SEP 2024.pdf19 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B SEP 2024.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B SEP 24.pdf19 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B DEC 2023.pdf19 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B DEC 2023.pdf19 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B DEC 2023.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B DEC 23.pdf19 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B DEC 2024.pdf19 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B DEC 2024.pdf19 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B DEC 2024.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B DEC 24.pdf19 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B MAR 2025.pdf19 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B MAR 2025.pdf19 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B MAR 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B MAR 25.pdf19 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B JUN 2025.pdf19 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B JUN 2025.pdf19 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B JUN 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B JUN 25.pdf19 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B MAR 2023.pdf18 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B MAR 2023.pdf18 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B MAR 2023.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B MAR 23_compressed.pdf18 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B JUN 2023.pdf18 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B JUN 2023.pdf18 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B JUN 2023.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B JUN 23_compressed.pdf18 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B SEP 2023.pdf18 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B SEP 2023.pdf18 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B SEP 2023.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B SEP 23.pdf18 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B MAR 2024.pdf18 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B MAR 2024.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B MAR 24.pdf18 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B MAR 2024_compressed.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA NEWTOWN PH B JUN 24.pdf18 Aug 2025
Form 1File: FORM 1 GANGA NT PHASE 2 B JUN 2024.pdf18 Aug 2025
Form 2File: FORM 2 GANGA NT PHASE 2 B JUN 2024.pdf18 Aug 2025
Form 3File: FORM 3 GANGA NT PHASE 2 B JUN 2024.pdf18 Aug 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GANGA NEWTOWN B BLDG OC AND DECLARATION UPLOADED IN RERA.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SBAPLLP_NewTown_Architects Certificiate Q1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SBAPLLP_NewTown_Architects Certificiate Q2.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SBAPLLP_NewTown_B_Architects Certificiate Q4.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 4 Arch Cert with Completion Certificate.pdf22 Feb 2025
Certificates of CA (Form 3)File: CA Certificate_B_15072024 - converted.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Engineer Certificate_GN_B Wing.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_GN_B.pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf2 Jul 2024
Certificates of CA (Form 3)File: CA Certificate_B_GN_1504241.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Ganga Newtown B YTD 2023.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Ganga Newtown B YTD 2024.pdf1 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Ganga Newtown B1B2B3 2023-24.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA Form 5 - Ganga Newtown B1B2B3 2022-23.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA Form 5 - Ganga Newtown B1B2B3 2023-24.pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 - Ganga Newtown B1B2B3 2022-23.pdf29 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PMC COMPLETION OCCUPANCY CERTIFICATE BLDG B-1, B-2, B-3 DT 18-03-2024.pdf3 Apr 2024
Other - TechnicalFile: PMC COMPLETION OCCUPANCY CERTIFICATE BLDG B-1, B-2, B-3 DT 18-03-2024.pdf3 Apr 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf24 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold 310323.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Ganga Newtown_2019.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Ganga Newtown_2020.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Ganga Newtown_2021.pdf13 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Ganga Newtown_2021-22.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SBAPLLP_Newtown B_Form 5 2019.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SBAPLLP_Newtown B_Form 5 2020.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SBAPLLP_Newtown B_Form 5 2021.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SBAPLLP_Newtown B_Form 5 2022.pdf13 Feb 2023
OtherFile: Annexure ABC Ganga Newtown B.pdf23 Mar 2022
Annual Audit Report of Statutory CA (Form 5)File: Self Declartion SBA B1 B2 B3.pdf30 Sep 2019
OtherFile: Certificate of Conversion of Firm into LLP.PDF16 Aug 2019
Proforma of Allotment letterFile: Revised Draft Ageement.pdf31 Jul 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA NEWTOWN PH 5 E BLDGP52100079278DHANORI, Pune147Feb 2025Certificate SignedJun 2028May 2026
GANGA NEWTOWN PH 4 D BldgP52100055461DHANORI, Pune231Mar 2024Certificate SignedDec 2027Registered original: Jun 2027Not due yet
GANGA NEWTOWN PH 3 C BldgP52100034400DHANORI, Pune-Apr 2022Certificate SignedJun 2026May 2026

Keep Ganga Newtown Ph 02 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PORWAL ROAD

2 kmGanga Newtown Ph 02Completed 19Lapsed / revoked 17Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: SHREE BALAJI ASSOCIATES PUNE LLP

SHREE BALAJI ASSOCIATES PUNE LLP has 10 registrations on MahaRERA, including GANGA NEWTOWN PHASE I and Ganga Newtown Ph 02. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that Ganga Newtown Ph 02 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ganga Newtown Ph 02 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganga Newtown Ph 02?

The registered promoter entity is SHREE BALAJI ASSOCIATES PUNE LLP, a partnership as per the filing. Its GSTIN 27ABDFS3963Q1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganga Newtown Ph 02?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ganga Newtown Ph 02?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganga Newtown Ph 02?

The professionals named in the filing: Architect: PARVEZ JAMMADAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganga Newtown Ph 02?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganga Newtown Ph 02. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganga Newtown Ph 02 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.