GANGA ARCADIA A BUILDING
RG-MH-16389 · RERA P52100025978 · Last updated on MahaRERA portal: 6 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 1 complaint at MahaRERA
- Completion date moved by 9 months
- 1 extension taken
Clear
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA ARCADIA A BUILDING is a Others project by GOEL GANGA INDIA PVT LTD in KHARADI, 411014, registered with MahaRERA as P52100025978 on 7 Aug 2020. Possession is promised by 30 Mar 2027. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameGANGA ARCADIA A BUILDING
- TypeOthers
- Location
- MUNDHWA KHARADI ROAD
- KHARADI
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100025978
- ReraGenie IDRG-MH-16389
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Aug 2020
- Promised completion30 Mar 2027
- Revised completionRevised to 30 Mar 2027 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed121 files
Current status
Figures as on 6 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANGA ARCADIA A BUILDING | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.
GANGA ARCADIA A BUILDING: 74% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 91% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 81% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 69% |
Progress on shared amenities15
As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 5% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 23% |
| Storm Water Drains | Yes | 6% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GANGA ARCADIA A BUILDING | NA | Rs 24.23 cr | Rs 21.03 cr |
| - | NA | Rs 1.28 cr | Rs 92.32 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Zuber Shaikh |
| Engineer | Anand Jadhav |
| Chartered Accountant | ARTAITYA |
| Partner | Role in project |
|---|---|
| GOEL GANGA INDIA PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject extension without default on the part of the promoter. The progress and timely completion of the above-mentioned project has been severely affected due to extraordinary and unavoidable circumstances beyond our control, including: 1. War and geopolitical disturbances affecting supply chains and transportation; 2. Acute labour shortage at project sites; 3. Shortage and delayed availability of ready-mix concrete and construction materials; 4. Gas and oil supply disruptions resulting in escalation of transportation and operational costs; 5. Delay in procurement of essential construction in
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 627/2013 | CIVIL COURT PUNE | DESPOSED OFF |
| 674/2017 | CIVIL COURT PUNE | PENDING |
| 298/2018 | ADDITIONAL COLLECTOR | DISPOSED OFF |
| 1191/2017 | PMC COURT | PENDING |
| 794/2021 | CJSD | PENDING |
| 285/2017/2017 | Special Civil Suit | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600714 | Arif Kasam Baig | GOEL GANGA INDIA PVT LTD | 07/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Mar 2027
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Arcadia A Form 1.pdf | 6 Aug 2026 |
| Withdrawal Update Form 2File: Arcadia A Form 2.pdf | 6 Aug 2026 |
| Withdrawal Update Form 3File: Arcadia A.pdf | 6 Aug 2026 |
| Form 2A (FY 2020-2021)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Form 2A (FY 2021-2022)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Form 2A (FY 2022-2023)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Form 2A (FY 2023-2024)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Form 2A (FY 2024-2025)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Form 2A (FY 2026-2027)File: Arc A -Form 2A.pdf | 6 Aug 2026 |
| Withdrawal Update Form 1File: Arc A-Arch.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Arc A -Arch-Sept 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Arc A -Arch-Dec 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Arc A -Arch-Dec 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Arc A --Form 1.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Arc A-Engg.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Arc A -Engg-Sept 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Arc A -Engg-Dec 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Arc A -Engg-Dec 2025.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Arc A -Form 2.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Arc A june.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Arc A Sept.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Arc A dec.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Arc A dec.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Arc A -2026.pdf | 21 May 2026 |
| Form 2A (FY 2025-2026)File: Arc A -Form 2A.pdf | 21 May 2026 |
| Form 5 (FY 2025-2026)File: Arc A.pdf | 21 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc A-Arch.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arc A-Engg.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arc A -Quality.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ASMI 1-March 2024.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcadia A-Arch.pdf | 3 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arc A-Engg.pdf | 3 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arc A-Quality.pdf | 3 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc A-Arch-Dec 2024.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arc A-Engg-Dec 2024.pdf | 3 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arc A-Quality-Dec 2024.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc A-Arch-Sept 2024.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arc A-Engg-Sept 2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arc A-Quality-Sept 2024.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc A-Arch-Sept 2024.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arc A-Engg-Sept 2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arc A-Quality-Sept 2024.pdf | 8 Oct 2024 |
| Building plan approvalFile: 1.pdf | 9 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcadia A_ARCH_march 2024.pdf | 2 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCADIA A_ARCH_June 2024.pdf | 2 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arcadia A_ENGG_march 2024.pdf | 2 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCADIA A_ENGG_June 2024.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Arcadia A_QUALITY_march 2024.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ARCADIA A_QUALITY_June 2024.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Arcadia A (2023).pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ARCADIA A_FORM 5_2021.pdf | 1 Jun 2024 |
| Copy of the legal title reportFile: ARCADIA_Legal Title Report.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARCADIA BLDG A RERA FORM 3.pdf | 5 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 Arcadia A.pdf | 5 Mar 2024 |
| Proforma of Agreement for saleFile: Arcadia A Agreement Draft R5.pdf | 28 Feb 2024 |
| Proforma of Agreement for saleFile: ARCADIA A agreement for sale.pdf | 9 Feb 2024 |
| Building plan approvalFile: 1-3-compressed (1).pdf | 7 Feb 2024 |
| Details of encumbrancesFile: 1 Details of encumbrances.pdf | 7 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance.pdf | 7 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf | 7 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance.pdf | 7 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf | 7 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-3-compressed (1).pdf | 7 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 7 Feb 2024 |
| Proforma of Agreement for saleFile: 2 Proforma of Agreement for sale.pdf | 7 Feb 2024 |
| Proforma of Allotment letterFile: 4 Proforma of Allotment letter.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCADIA A_ARCH_30-12-23.pdf | 30 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCADIA A_ENGG_30-12-23.pdf | 30 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ARCADIA A_QUALITY_30-12-23.pdf | 30 Dec 2023 |
| Proforma of Agreement for saleFile: ARCADIA A AGREEMENT.pdf | 22 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 21 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation letter - Allotment letter Arcadia A Building.pdf | 20 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - GANGA ARCADIA A BUILDING (1).pdf | 20 Dec 2023 |
| Proforma of Allotment letterFile: ARCADIA A ALLOTMENT LETTER.pdf | 19 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Arcadia A (2023).pdf | 14 Dec 2023 |
| Layout approvalFile: 1-3 ARCADIA 2023_compressed_compressed-compressed.pdf | 10 Dec 2023 |
| Copy of the legal title reportFile: FOW OF THE TITLE OF THE SAID LAND AdvUSVASTE 03 AUG2023.pdf | 10 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 10 Dec 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf | 10 Dec 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| GANGA ALTUS KHARADI PUNEP52100024713 | KHARADI | - | Mar 2020 | Certificate Signed | Dec 2028 | Not due yet |
| GANGA ALTUS KHARADI PUNEP52100024713 | KHARADI | - | Mar 2020 | Certificate Signed | Dec 2028 | Not due yet |
| GANGA DHAM TOWER A..P52100000393 | BIBVEWADI, Pune | - | Jul 2017 | Ongoing | Apr 2026 | Not delivered |
| GANGA GLITZ | SR NO 16 P AND 17 P UNDRI PUNE 411060 | 192 | - | Completed | Apr 2018 | Apr 2017 |
| GANGA ARCADIA | SR NO 22 HISSA NO 2 KHARADI PUN 411014 | 28 | - | Completed | Jun 2017 | Jun 2017 |
| GANGA ARCADIA | SR NO 22 HISSA NO 2 KHARADI PUNE 411014 | 120 | - | Completed | Dec 2015 | Oct 2015 |
| GANGA SPARSH | SR NO 16 P AND 17 P UNDRI PUNE 411060 | 154 | - | Completed | Apr 2014 | Nov 2013 |
| AMRUTGANGA | VADGAON BK PUNE | 611 | - | Completed | Dec 2013 | Oct 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 23 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGA ARCADIA A BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: GOEL GANGA INDIA PVT LTD
GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if GANGA ARCADIA A BUILDING is delayed beyond 30 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA ARCADIA A BUILDING?
The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA ARCADIA A BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GANGA ARCADIA A BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GANGA ARCADIA A BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA ARCADIA A BUILDING?
The professionals named in the filing: Architect: Zuber Shaikh; Engineer: Anand Jadhav; Chartered Accountant: ARTAITYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA ARCADIA A BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback