Home / Browse projects / Pune, Maharashtra / GANGA DHAM TOWER A..
GANGA DHAM TOWER A..
RG-MH-02350 · RERA P52100000393 · Last updated on MahaRERA portal: 21 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Litigation declared, 5 cases
- 5 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 6 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA DHAM TOWER A.. is a Residential / Group Housing project by GOEL GANGA INDIA PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100000393 on 15 Jul 2017. Possession was promised by 30 Apr 2026 and is now 6 months past that date. 5 complaints are on record with the regulator.
At a glance
Project
- NameGANGA DHAM TOWER A..
- TypeResidential / Group Housing
- Location
- MARKET YARD GANGA DHAM ROAD
- BIBVEWADI
- Pune (M Corp.)
- Pune City
- Pune
- 411001
- Pincode411001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000393
- ReraGenie IDRG-MH-02350
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Jul 2017
- Promised completion30 Apr 2026
- Revised completionNone
- Buildings3 building records
- Documents filed130 files
Current status
Figures as on 21 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A 1-20 FLOORS | NA | 25 | 0 | 0 | 0 | 0 |
| A 21-27 FLOORS | NA | 7 | 0 | 0 | 0 | 0 |
| A 28-31 FLOORS | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 21 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 99%.
A 1-20 FLOORS95%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 97% |
| Podiums (if any) | 96% |
| Plinth | 97% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 84% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 78% |
A 21-27 FLOORS48%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 92% |
| Sanitary Fittings within the flats / premises | 78% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 84% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 76% |
A 28-31 FLOORS39%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 82% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 84% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 94% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 73% |
Progress on shared amenities15
As on 21 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 63% |
| Water Supply | Yes | 97% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 63% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 65% |
| Electrical meter room, sub-station, receiving station | Yes | 66% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed482
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A 1-20 FLOORS | 302 | 302 |
| A 21-27 FLOORS | 105 | 105 |
| A 28-31 FLOORS | 75 | 75 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A 1-20 FLOORS | NA | Rs 57.27 cr | Rs 54.66 cr |
| A 21-27 FLOORS | NA | Rs 13.52 cr | Rs 12.59 cr |
| A 28-31 FLOORS | NA | Rs 10.10 cr | Rs 8.10 cr |
| - | NA | Rs 8.57 cr | Rs 6.94 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPACE DESIGNERS SYNDICATE |
| Architect | Direction next |
| Engineer | G. A. Bhillare |
| Engineer | IM PATEL |
| Chartered Accountant | A R TATIYA |
| Partner | Role in project |
|---|---|
| Legends County Landmark Pvt Ltd | - |
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 828/2013 | CIVIL COURT PUNE | PENDING |
| 837/2013 | HIGH COURT BOMBAY | RESTORE |
| 911/2018 | CIVIL MISC APPLICATION | PENDING |
| 710/2019 | HIGH COURT MUMBAI | DISPOSED OFF |
| 32/2020 | NGT | Disposed off |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022385 | GOEL GANGA INDIA PVT LTD | KISHOR JETHMAL JAIN AND NEETA KISHOR JAIN | 26/12/2018 |
| CC005000000022388 | GOEL GANGA INDIA PVT LTD | MR. JAYANTILAL JETHMAL JAIN AND MRS. LATA JAYANTILAL JAIN | 26/12/2018 |
| CC005000000022389 | GOEL GANGA INDIA PVT LTD | BHARAT JETHMAL OSWAL AND REKHA BHARAT OSWAL | 26/12/2018 |
| CC005000000022390 | GOEL GANGA GROUP | DINESH JETHMAL OSWAL AND MEENA DINESH OSWAL | 26/12/2018 |
| CC005000000022397 | VISPI BOMI GANDEVIA | GOEL GANGA INDIA PVT LTD | 29/12/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Feb 2025
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: GDT A-Arch.pdf | 21 Mar 2026 |
| Withdrawal Update Form 2File: GDT A-Engg-Dec 2025.pdf | 21 Mar 2026 |
| Withdrawal Update Form 3File: RERA FORM 3 GGIPL GDT A 31-12-2025.pdf | 21 Mar 2026 |
| Withdrawal Update Form 1File: GDT A-Arch form 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: GDT A -Arch-form 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: GDT A-Engg-form 2.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: GDT A -Engg-Sept 2025.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: RERA FORM 3 GGIPL GDT A 30-06-2025.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: GDT A -Form 3.pdf | 5 Mar 2026 |
| Certificates of CA (Form 3)File: GDT A-March 2025.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A Arch.pdf | 7 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A -Engg.pdf | 3 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A -Quality.pdf | 3 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A.pdf | 20 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: GDT-Building A.pdf | 7 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GDT OC.pdf | 7 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A -Arch-Dec 2024.pdf | 3 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A -Engg-Dec 2024.pdf | 3 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A -Quality-Dec 2024.pdf | 3 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A-Arch-Sept 2024.pdf | 8 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A-Engg-Sept 2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A-Quality-Sept 2024.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A-Arch-Sept 2024.pdf | 8 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A-Engg-Sept 2024.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A-Quality-Sept 2024.pdf | 8 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_ARCH_march 2024.pdf | 2 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_march 2024.pdf | 2 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_June 2024.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A_QUALITY_march 2024.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A_QUALITY_June 2024.pdf | 2 Jul 2024 |
| Certificates of CA (Form 3)File: GDT A_form 3 2024.pdf | 2 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GDT A_form 5 2024.pdf | 2 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_ARCH_June 2024.pdf | 1 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_June 2024.pdf | 1 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GDT A_QUALITY_June 2024.pdf | 1 Jul 2024 |
| Certificates of CA (Form 3)File: GDT A_form 3 2023.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GDT A_FORM 5_2023.pdf | 7 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GDT A_form 5 2023.pdf | 24 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_ARCH_30-12-23.pdf | 30 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_30-12-23.pdf | 30 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GDT A_QUALITY_30-12-23.pdf | 30 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_ARCH_30-9-23.pdf | 20 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_30-9-23.pdf | 20 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GDT A_QUALITY_30-9-23.pdf | 20 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_ARCH_30-6-23.pdf | 19 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_ENGG_30-6-23.pdf | 19 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GDT A_QUALITY_30-6-23.pdf | 19 Jul 2023 |
| Building plan approvalFile: GDT BUILDING PLAN 31 FLOORS_compressed (1).pdf | 12 Apr 2023 |
| Building Plan Approval (IOD)File: GDT BUILDING PLAN 31 FLOORS_compressed (1).pdf | 12 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: GDT CC 31 FLOORS.pdf | 12 Apr 2023 |
| Certificates of CA (Form 3)File: GDT A_FORM 3_2020.pdf | 6 Apr 2023 |
| Certificates of CA (Form 3)File: GDT A_FORM 3_2021.pdf | 6 Apr 2023 |
| Certificates of CA (Form 3)File: GDT A_FORM 3_2022.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GDT A_FORM 5_2020.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GDT A_FORM 5_2021.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GDT A_FORM 5_2022.pdf | 6 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A_Architect march 2023.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A ARCH.pdf | 4 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A_Engineer march 2023.pdf | 4 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A ENGG.pdf | 4 Apr 2023 |
| Form 2AFile: GDT A QUALITY.pdf | 4 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GDT A_quality march 2023.pdf | 4 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A Arch.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A ARCH.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A ARCH.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A ENGG.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A ENGG.pdf | 5 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GDT A ENGG.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GDT A 2A.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GDT A 2A.pdf | 5 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GDT A 2A.pdf | 5 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2019 JULY ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2019 - MARCH ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2019- SEP ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2020- MARCH ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2020- JUNE ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2020- SEP ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2020 - DEC ARCH.pdf | 22 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GDT A 2021- MARCH ARCH.pdf | 22 Jan 2023 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| GANGA LEGEND A2 AND B4P52100021020 | BAVDHAN, Pune | 272 | May 2019 | Completed | Dec 2023 | Dec 2023 |
| GANGA GLITZ | Survey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060 | 192 | - | Completed | Apr 2018 | Apr 2017 |
| GANGA ARCADIA | SR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 411014 | 28 | - | Completed | Jun 2017 | Jun 2017 |
| GANGA ARCADIA | Survey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014 | 120 | - | Completed | Dec 2015 | Oct 2015 |
| GANGA SPARSH | Survey No 16Pand 17 P Village Undri Taluka Haveli District Pune | 154 | - | Completed | Apr 2014 | Nov 2013 |
| AMRUTGANGA | VADGAON BK PUNE | 611 | - | Completed | Dec 2013 | Oct 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 23 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGA DHAM TOWER A.. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BIBVEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 127 registered projects within 2 km.
HUES OF SKY
Bramhacorp Limited
Birla Punya Phase II
Birla Estates Private Limited
Birla Punya Phase 1
Birla Estates Private Limited
BOULEVARD TOWER A2
Bramhacorp Limited
One Place-Bund Garden Road
TOPSPACE LANDMARKS LLP
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Builder: GOEL GANGA INDIA PVT LTD
GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GANGA DHAM TOWER A.. shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GANGA DHAM TOWER A.. is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA DHAM TOWER A..?
The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA DHAM TOWER A..?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GANGA DHAM TOWER A..?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GANGA DHAM TOWER A..?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA DHAM TOWER A..?
The professionals named in the filing: Architect: SPACE DESIGNERS SYNDICATE; Architect: Direction next; Engineer: G. A. Bhillare; Engineer: IM PATEL; Chartered Accountant: A R TATIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA DHAM TOWER A..?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback