Home / Browse projects / GANGA ALTUS KHARADI PUNE

Registered Litigation declared Others project

GANGA ALTUS KHARADI PUNE

By GOEL GANGA INDIA PVT LTD

RG-MH-15861 · RERA P52100024713 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
53 of 66Construction stages doneacross 6 buildings; furthest along: Basement (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 197 documents Report an error

GANGA ALTUS KHARADI PUNE is a Others project by GOEL GANGA INDIA PVT LTD in KHARADI, 411014, registered with MahaRERA as P52100024713 on 2 Mar 2020. Possession is promised by 30 Dec 2028. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA ALTUS KHARADI PUNE
  • TypeOthers
  • Location
    • MUNDHWA ROAD
    • KHARADI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024713
  • ReraGenie IDRG-MH-15861

Builder

  • NameGOEL GANGA INDIA PVT LTD
  • Entity typeCompany
  • DirectorsJAIPRAKASH SITARAM GOEL, Amit Jaiprakash Goel
  • Other registrations23 more →
  • Completed6 of 24
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredMar 2020PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Mar 2020
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings6 building records
  • Documents filed197 files

Current status

100.0%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANGA ALTUS WING D LG TO 15 TH FLOORNA2121000
GANGA ALTUS WING D 16 TH TO 24 FLOORNA100000
GANGA ALTUS WING E LG TO 1ST FLOORNA70000
GANGA ALTUS WING E 2ND TO 16 TH FLOORNA150000
GANGA ALTUS WING E 17 TH TO 24 FLOORNA90000
GANGA ALTUS WING FNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

53 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Basement (if any), at 0%.

GANGA ALTUS WING D LG TO 15 TH FLOOR100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GANGA ALTUS WING D 16 TH TO 24 FLOOR64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GANGA ALTUS WING E LG TO 1ST FLOOR100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GANGA ALTUS WING E 2ND TO 16 TH FLOOR64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GANGA ALTUS WING E 17 TH TO 24 FLOOR64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GANGA ALTUS WING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed430

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots430
Closed/Covered368
Open Space62
BuildingClosed/CoveredOpen SpaceTotal
GANGA ALTUS WING D LG TO 15 TH FLOOR1200120
GANGA ALTUS WING D 16 TH TO 24 FLOOR72072
GANGA ALTUS WING E LG TO 1ST FLOOR808
GANGA ALTUS WING E 2ND TO 16 TH FLOOR1200120
GANGA ALTUS WING F4862110

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,605 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI44584.0
Proposed, not sanctioned24,584 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaw college road, Pune
Estimated costRs 109.03 cr
Cost incurredRs 109.03 cr
Work done100.0%
BuildingWingEstimatedIncurred
GANGA ALTUS WING D LG TO 15 TH FLOORNARs 33.74 crRs 33.74 cr
GANGA ALTUS WING E 2ND TO 16 TH FLOORNARs 18.82 crRs 18.82 cr
GANGA ALTUS WING E LG TO 1ST FLOORNARs 17.57 crRs 17.57 cr
GANGA ALTUS WING D 16 TH TO 24 FLOORNARs 14.86 crRs 14.86 cr
GANGA ALTUS WING E 17 TH TO 24 FLOORNARs 10.51 crRs 10.51 cr
GANGA ALTUS WING FNARs 7.12 crRs 7.12 cr
-NARs 6.41 crRs 6.41 cr

Certifying professionals and partners16

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAKASH KULKARNI
ArchitectSPACE DESIGNERS SYNDICATE
ArchitectANKUR ASSOCIATES
EngineerSUDHIR AGRAWAL
EngineerSudhir
EngineerAmit Bedke
EngineerAmit Bedake
EngineerG. A. Bhillare
Chartered AccountantSachin Chordiya
Chartered AccountantR S A R & Associates
Chartered AccountantSachin Gogave & Co LLP
Chartered AccountantSayali Dighe & Associates
PartnerRole in project
Legends County Landmark Pvt Ltd-

Litigation declared1

CaseCourtStatus
34/2020NGTOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000269608SALMA MEHMOOD HAMDULEGOEL GANGA INDIA PRIVATE LIMITED31/10/2023
CC005000000471181Altaf Fakir BaigGoel Ganga Developers (I) Pvt Ltd26/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2025

Documents filed197

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Altus Form 1.pdf6 Aug 2026
Withdrawal Update Form 2File: Altus Form 2.pdf6 Aug 2026
Withdrawal Update Form 3File: Altus.pdf6 Aug 2026
Form 5 (FY 2025-2026)File: Altus.pdf7 May 2026
Withdrawal Update Form 1File: Altus- Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Altus -Engg-Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 3File: Altus.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2024-2025)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2019-2020)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2020-2021)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2021-2022)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2022-2023)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2023-2024)File: Altus Form 2A.pdf20 Apr 2026
Form 2A (FY 2026-2027)File: Altus Form 2A.pdf20 Apr 2026
Withdrawal Update Form 1File: Altus -Arch-Sept 2025.pdf21 Mar 2026
Withdrawal Update Form 2File: Altus -Engg-Dec 2025.pdf21 Mar 2026
Withdrawal Update Form 3File: RERA FORM 3 GGIPL Altus D E F Oct-Nov-Dec-2025 Q3.pdf21 Mar 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-June 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-Sept 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Altus -Engg-June 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Altus Form3 (1).pdf17 Feb 2026
Withdrawal Update Form 3File: 0ac871cd-a516-4963-97f4-22547e5c2bfa.pdf17 Feb 2026
Withdrawal Update Form 1File: Altus -Arch-Sept 2025.pdf25 Dec 2025
Withdrawal Update Form 2File: Altus -Engg-Sept 2025.pdf25 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf25 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Altus -march 2025.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Altus-Arch.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Altus-Engg.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Altus-Quality.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ALTUS_form 3 2024.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ALTUS D,E,F_FORM 3_2022.pdf22 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ganga Altus _D Building Completion certificate.pdf17 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Scan_20250217_204158.pdf17 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Altus Shops _form 4.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Altus Shops F wing _form 4.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 2024.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 2022.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 2023.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 2022.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 21.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 23.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 21.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2024.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 23.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 21.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2020.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Altus June 2022.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Altus Sept 2022.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganga Altus Sept 2022.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2021.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 2021.pdf9 Jan 2025

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GANGA LEGEND A2 AND B4P52100021020BAVDHAN, Pune272May 2019CompletedDec 2023Dec 2023
GANGA GLITZSurvey No 16 P AND Survey No 17 P Village Undri Taluka Haveli District Pune 411 060192-CompletedApr 2018Apr 2017
GANGA ARCADIASR NO 22 Hissa No 2 Village Kharadi Taluka Haveli District Pune 41101428-CompletedJun 2017Jun 2017
GANGA ARCADIASurvey No. 22 Hissa No 2 situated at Village Kharadi Taluka Haveli District Pune 411 014120-CompletedDec 2015Oct 2015
GANGA SPARSHSurvey No 16Pand 17 P Village Undri Taluka Haveli District Pune154-CompletedApr 2014Nov 2013
AMRUTGANGAVADGAON BK PUNE611-CompletedDec 2013Oct 2013

Keep GANGA ALTUS KHARADI PUNE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI

2 kmGANGA ALTUS KHARADI PUNECompleted 6Lapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: GOEL GANGA INDIA PVT LTD

GOEL GANGA INDIA PVT LTD has 24 registrations on MahaRERA, including GANGA GLITZ F. BLDG and GANGA LEGEND A4 AND B1... Its filings disclose 8 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 11 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if GANGA ALTUS KHARADI PUNE is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA ALTUS KHARADI PUNE?

The registered promoter entity is GOEL GANGA INDIA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA ALTUS KHARADI PUNE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA ALTUS KHARADI PUNE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA ALTUS KHARADI PUNE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA ALTUS KHARADI PUNE?

The professionals named in the filing: Architect: AR PRAKASH KULKARNI; Architect: SPACE DESIGNERS SYNDICATE; Architect: ANKUR ASSOCIATES; Engineer: SUDHIR AGRAWAL; Engineer: Sudhir; Engineer: Amit Bedke. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA ALTUS KHARADI PUNE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA ALTUS KHARADI PUNE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA ALTUS KHARADI PUNE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.