Home / Browse projects / Mumbai Suburban, Maharashtra / Bhanu Jyoti CHSL

Completed No litigation declared Others project

Bhanu Jyoti CHSL

By Namo Realty Ventures LLP

RG-MH-87405 · RERA P51800046215 · Last updated on MahaRERA portal: 29 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Bhanu Jyoti CHSL is a Others project by Namo Realty Ventures LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046215 on 20 Jun 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameBhanu Jyoti CHSL
  • TypeOthers
  • Location
    • Nivetia Road
    • Malad East
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • RERA no.P51800046215
  • ReraGenie IDRG-MH-87405

Builder

  • NameNamo Realty Ventures LLP
  • Entity typePartnership
  • GSTIN27AAQFN6315D1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBhavik Dilip Mehta, Sagar Bhalchandra Turakhia, Spacedge Realty And Infra Private Limited
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects8 →

Key dates

this monthRegisteredJun 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
East Avenue - A WingNA120000
East Avenue - B WingNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

East Avenue - A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
East Avenue - B Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75
BuildingClosed/CoveredTotal
East Avenue - A Wing3737
East Avenue - B Wing3838

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,564 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Bhanu Jyoti Co Operative Housing Society LimitedBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI4644.01
Proposed, not sanctioned3,738 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch72 73 Star Apartments Near Shimpoli Naka S V Road Borivali West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTangent Architects and Interior Designers
EngineerMr. Rupesh Chowdhary
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Namo Realty Ventures LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Oct 2024

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 BhanuJyoti 23-24.pdf29 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf7 Nov 2024
Status of ConveyanceFile: DEED OF CONVEYANCE.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JULY TO SEPT 24 (1).pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JULY TO SEPT 24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JULY TO SEPT 24.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Letter 28-10-2024.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Drawing 28-10-2024_1-1.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Drawing 28-10-2024_2-3.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Drawing 28-10-2024_4-end.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhanu Jyoti Form 2.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BHANU JYOTI CHSL - ENGINEER 2.pdf8 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BHANU JYOTI CHSL - ENGINEER 2.pdf8 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- ENGINEER QUALITY ASSURANCE CERTIFIACTE - 2024.pdf8 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - DEC 2023.pdf28 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22 - 23.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 22.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPTEMBER 22.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECEMBER 22.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH 23.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 23.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPTEMBER 23.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_06_10_2023.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE.pdf22 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed 12-06-2023).pdf12 Jun 2023
CERSAI detailsFile: CERSAI REPORT.PDF2 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: cc namo.pdf31 Jan 2023
Details of encumbrancesFile: ENCUMBRANCE LETTER .pdf30 Dec 2022
Building plan approvalFile: Amend letter.pdf16 Nov 2022
Layout approvalFile: Amended Plan_1-1.pdf16 Nov 2022
Layout approvalFile: Amended Plan_2-2.pdf16 Nov 2022
Layout approvalFile: Amended Plan_3-4.pdf16 Nov 2022
Layout approvalFile: Amended Plan_5-end.pdf16 Nov 2022
Copy of Layout Approval (in case of layout)File: Amended Plan_1-1.pdf16 Nov 2022
Copy of Layout Approval (in case of layout)File: Amended Plan_2-2.pdf16 Nov 2022
Copy of Layout Approval (in case of layout)File: Amended Plan_3-4.pdf16 Nov 2022
Copy of Layout Approval (in case of layout)File: Amended Plan_5-end.pdf16 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Amend letter.pdf16 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC - 02-06-2022.pdf2 Jun 2022
Declaration about Commencement CertificateFile: CERCULAR 32.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Form 3 Bhanu Jyoti CHSL Revised.pdf2 Jun 2022
Proforma of Allotment letterFile: Allotment Letter Bombay.pdf2 Jun 2022
Proforma of Allotment letterFile: RERA-Agr for Sale-BhanuJyoti.pdf23 May 2022
Copy of the legal title reportFile: Legal Title Report - 9TH MAY.pdf18 May 2022
Details of encumbrancesFile: ENCUMRANCES LETTER.pdf7 Feb 2022
Declaration in FORM BFile: FORM B - PROMOTER (2).pdf7 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200229710541_For_Asset_Based_Search_07_02_2022_16_31_56_605.pdf7 Feb 2022
Layout approvalFile: Plan Bhanu Jyoti_1-2.pdf5 Feb 2022
Building plan approvalFile: Plan Bhanu Jyoti_3-4.pdf5 Feb 2022
Building plan approvalFile: Plan Bhanu Jyoti_5-end.pdf5 Feb 2022
PAN CardFile: NAMO REALTY VENTURES PAN .pdf5 Feb 2022
Copy of Layout Approval (in case of layout)File: Plan Bhanu Jyoti_1-2.pdf5 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan Bhanu Jyoti_3-4.pdf5 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan Bhanu Jyoti_5-end.pdf5 Feb 2022

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SILVERINE CHSLP51800079104IC COLONY BORIVALI WEST, Mumbai Suburban42Feb 2025OngoingMay 2028Not due yet
SAFFRON PEACEP51800052669BORIVALI WEST, Mumbai Suburban-Sep 2023CompletedDec 2027Feb 2026
NEW KANDIVALI CHSLP51800077407KANDIVALI WEST, Mumbai Suburban31Aug 2024OngoingDec 2026Not due yet
Borivali Shanti Krupa CHSLP51800053007Borivali West, Mumbai Suburban42Oct 2023CompletedDec 2025Sep 2025
SHANTINIKETANP51800026889KANDIVALI WEST, Mumbai Suburban-Nov 2020OngoingMay 2025Registered original: Nov 2022Not delivered
ATMARAM CHSLP51800011731borivali west, Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Oct 2019Aug 2022
valera chslP51800017210MUMBAI, Mumbai Suburban-Jul 2018CompletedNov 2021Late, Feb 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhanu Jyoti CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad East6,700+ in Mumbai Suburban

Builder: Namo Realty Ventures LLP

Namo Realty Ventures LLP has 2 registrations on MahaRERA, including Bhanu Jyoti CHSL and OUR HOME CHSL. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Bhanu Jyoti CHSL is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhanu Jyoti CHSL?

The registered promoter entity is Namo Realty Ventures LLP, a partnership as per the filing. Its GSTIN 27AAQFN6315D1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhanu Jyoti CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhanu Jyoti CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhanu Jyoti CHSL?

The professionals named in the filing: Architect: Tangent Architects and Interior Designers; Engineer: Mr. Rupesh Chowdhary; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhanu Jyoti CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhanu Jyoti CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhanu Jyoti CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.