Home / Browse projects / Palghar, Maharashtra / AYODHYA NAGARI -1

Registered Litigation declared Residential / Group Housing project

AYODHYA NAGARI -1

By Veer Global Infraconstruction Limited

RG-MH-99445 · RERA PR1240002502919 · Last updated on MahaRERA portal: 24 Sep 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 0%
84 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 10 documents Report an error

AYODHYA NAGARI -1 is a Residential / Group Housing project by Veer Global Infraconstruction Limited in Palghar, Maharashtra, registered with MahaRERA as PR1240002502919 on 18 Mar 2026. Possession is promised by 31 Dec 2031. 0 of the 84 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAYODHYA NAGARI -1
  • TypeResidential / Group Housing
  • Location
    • AYODHYA NAGARI
    • GOKHIVARE
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1240002502919
  • ReraGenie IDRG-MH-99445

Builder

  • NameVeer Global Infraconstruction Limited
  • Entity typeCompany
  • CINL45309MH2012PLC225939
  • Managing DirectorVIJAYBHAI BHANSHALI
  • DirectorsVINOD MOHANLAL JAIN, PRIYANK CHANDRAKANT PARIKH
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Mar 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed10 files

Current status

0%0 of 84 units booked
9.4%Work done, per cost certificate

Figures as on 24 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO. 6, WING CC191584084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BLDG NO. 6, WING C · wing C: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed175

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots175
Closed/Covered20
Open Space155

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,727 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2025
LandownerVillageDistrict
sai rydm realtors pvt ltdVasai-Virar City (M Corp)Palghar
Marceline salu PereiraVasaiPalghar
Inas Salu PereiraVasaiPalghar
DEVENDRA LADHANIAcholePalghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI3727.05
Proposed, not sanctioned3,727 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch100 FT. VASAI NALLASO LINK ROAD NALLASOPARA PIN CODE-401208
Estimated costRs 23.39 cr
Cost incurredRs 2.21 cr
Work done9.43%
BuildingWingEstimatedIncurred
BLDG NO. 6, WING CCRs 19.89 crRs 2.21 cr
-NARs 3.51 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA & ASSOCIATES
EngineerMUKESH KUMAR
Chartered AccountantLUNAWAT & VYAS
PartnerRole in project
Veer Global Infraconstruction Limited-

Litigation declared1

CaseCourtStatus
1300209/2006/2006Civil Court, VasaiOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed10

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout CC.pdf24 Sep 2025
Layout approvalFile: Layout 1_compressed.pdf24 Sep 2025
Layout approvalFile: layout 2_compressed.pdf24 Sep 2025
Layout approvalFile: layout 2_compressed.pdf24 Sep 2025
Layout approvalFile: layout 4_.pdf24 Sep 2025
Building plan approvalFile: Bldg 6 C -1_.pdf24 Sep 2025
Building plan approvalFile: Bldg 6 C -2_.pdf24 Sep 2025
Building plan approvalFile: Bldg 6 C -3_.pdf24 Sep 2025
Building plan approval or NA orderFile: Revised CC 2024.pdf24 Sep 2025
Declaration and undertaking (Annexure A)File: veer_09242025_155949_038909.pdf24 Sep 2025

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Veer OneP99000031900Vasai East, Palghar1Nov 2021Certificate SignedDec 2027Not due yet
PARASNATH TOWNSHIPP99000013822umroli, Palghar-Oct 2017Certificate SignedDec 2027Registered original: Dec 2021Not due yet
VEER 11P99000034206UMROLI EAST, Palghar89Mar 2022Certificate SignedDec 2025Not delivered
VEER SPLENDORP99000011282Nalasopara east, Palghar-Aug 2017CompletedDec 2022Registered original: Jun 2021Dec 2022
VEER 2S NO 154 185 187 VILLAGE UMROLI DIST PALGHAR3-CompletedDec 2021Dec 2021
VEER - 4P99000015602UMROLI EAST, Palghar-Mar 2018CompletedSep 2020Sep 2020

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AYODHYA NAGARI -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOKHIVARE3,200+ in Palghar

2 kmAYODHYA NAGARI -1Completed 18Lapsed / revoked 18Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Veer Global Infraconstruction Limited

Veer Global Infraconstruction Limited has 10 registrations on MahaRERA, including VEER 2 and VEER SPLENDOR. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AYODHYA NAGARI -1 is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AYODHYA NAGARI -1?

The registered promoter entity is Veer Global Infraconstruction Limited, a company as per the filing. Its CIN L45309MH2012PLC225939 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AYODHYA NAGARI -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AYODHYA NAGARI -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AYODHYA NAGARI -1?

The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: MUKESH KUMAR; Chartered Accountant: LUNAWAT & VYAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AYODHYA NAGARI -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AYODHYA NAGARI -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AYODHYA NAGARI -1 to a free account