VEER 11

By Veer Global Infraconstruction Limited

RG-MH-29588 · RERA P99000034206 · Last updated on MahaRERA portal: 8 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
15 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 92%
55 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

VEER 11 is a Residential / Group Housing project by Veer Global Infraconstruction Limited in Palghar, Maharashtra, registered with MahaRERA as P99000034206 on 25 Mar 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 34 of the 89 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameVEER 11
  • TypeResidential / Group Housing
  • Location
    • STATION ROAD
    • UMROLI EAST
    • Umroli
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000034206
  • ReraGenie IDRG-MH-29588

Builder

  • NameVeer Global Infraconstruction Limited
  • Entity typeCompany
  • CINL45309MH2012PLC225939
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorVIJAYBHAI BHANSHALI
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2022First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed76 files

Current status

38%34 of 89 units booked
94.2%Work done, per cost certificate

Figures as on 8 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A, TYPE E 1NA11526733
WING B, TYPE D1NA11518018
WING C,TYPE C1NA11538038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 92%.

WING A, TYPE E 176%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks83%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%
WING B, TYPE D176%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.83%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.87%
WING C,TYPE C177%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.83%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84%

Progress on shared amenities15

As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceYes60%
Open ParkingYes65%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered18
Open Space17
BuildingClosed/CoveredOpen SpaceTotal
WING A, TYPE E 16511
WING B, TYPE D16612
WING C,TYPE C16612

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,722 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Dec 2025
LandownerVillageDistrict
SHREENATH ENTERPRISESVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityCollector palghar
Permissible FSI2722.41
Proposed, not sanctioned2,722 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNALASOPARA
Estimated costRs 6.64 cr
Cost incurredRs 6.25 cr
Work done94.23%
BuildingWingEstimatedIncurred
WING A, TYPE E 1NARs 2.04 crRs 1.98 cr
WING B, TYPE D1NARs 2.04 crRs 1.98 cr
WING C,TYPE C1NARs 2.04 crRs 1.96 cr
-NARs 52.60 lakhRs 34.19 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA & ASSOCIATES
EngineerMUKESH KUMAR
Chartered AccountantLUNAWAT & VYAS
PartnerRole in project
Veer Global Infraconstruction Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518958Dec 2025 → Mar 2027

Reason as filed by the promoterDear Sir/Ma’am, We, Veer Global Infraconstruction Limited, hereby declare the following with respect to the project “VEER 11” bearing registration number P99000034206 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the all the buildings. Currently, we are undertaking the Pending finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance work

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf8 Sep 2026
Withdrawal Update Form 1File: fORM 1 V11.pdf8 Sep 2026
Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf8 Sep 2026
Withdrawal Update Form 2File: F-II VEER 11 JAN MAR 2026-1.pdf8 Sep 2026
Withdrawal Update Form 3File: Veer 11Final Form 3.pdf8 Sep 2026
Withdrawal Update Form 3File: Form 3 Q4 26.pdf8 Sep 2026
Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf24 Jul 2026
Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf24 Jul 2026
Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf24 Jul 2026
Withdrawal Update Form 3File: Veer 11Final Form 3.pdf24 Jul 2026
Withdrawal Update Form 3File: Veer 11Final Form 3.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf18 Jul 2026
Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf18 Jul 2026
Withdrawal Update Form 3File: Veer 11Final Form 3.pdf18 Jul 2026
Form 2A (FY 2023-2024)File: FORM 2A MARCH 2024.pdf12 Apr 2026
Form 2A (FY 2021-2022)File: FORM 2A MARCH 2022.pdf12 Apr 2026
Form 2A (FY 2022-2023)File: FORM 2A MARCH 2023.pdf12 Apr 2026
Form 5 (FY 2021-2022)File: FORM 5 MARCH 22.pdf12 Apr 2026
Form 5 (FY 2022-2023)File: fORM 5 MARCH 23.pdf12 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 MARCH 2024.pdf12 Apr 2026
Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf11 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026 Final.pdf11 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026 Final.pdf11 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A (1).pdf12 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 - v11 2025.pdf11 Mar 2026
Withdrawal Update Form 1File: FORM 1 V11.pdf21 Jan 2026
Withdrawal Update Form 2File: vEER 11 Form 2 q3 25.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3 VEER 11 q325.pdf21 Jan 2026
Form 1File: Form 2 Q2 25 Veer 11.pdf20 Oct 2025
Form 2File: Form 2 Q2 25 Veer 11.pdf20 Oct 2025
Form 3File: Form 3 Q2 V11.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: veer 11 Sold q2.pdf20 Oct 2025
Form 2File: Veer 11 Form 2 June 25.pdf19 Jul 2025
Form 3File: Veer 11 Form 3 June 25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Veer 11 sold unsold June 25.pdf19 Jul 2025
Form 1File: Veer 11 sold unsold June 25.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan form 3 Q4 veer 11.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Veer 11 March 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 veer11.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold March 25.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 V11.pdf24 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 V11.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Veer 11 Form 1.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023-24.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold veer 11.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan form 5 0034206.pdf29 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200260986835_.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan Form 5 FY 21-22 No P99000034206.pdf14 Feb 2023
Declaration in FORM BFile: Form B Veer.pdf19 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 V11.pdf19 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Mar 2022
Building plan approvalFile: na 1.pdf18 Feb 2022
Layout approvalFile: a -1.pdf18 Feb 2022
Layout approvalFile: b -1.pdf18 Feb 2022
Layout approvalFile: c- 1.pdf18 Feb 2022
Copy of Layout Approval (in case of layout)File: a -1.pdf18 Feb 2022
Copy of Layout Approval (in case of layout)File: b -1.pdf18 Feb 2022
Copy of Layout Approval (in case of layout)File: c- 1.pdf18 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: na 1.pdf18 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: na 1.pdf18 Feb 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCENT CERTIFICATE 1.pdf18 Feb 2022
Proforma of Allotment letterFile: Draft-VEER-11-RERA.pdf18 Feb 2022
Copy of the legal title reportFile: rera title.pdf27 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228889895_For_Debtor_Based_Search_27_01_2022_17_39_02_236.pdf27 Jan 2022
Details of encumbrancesFile: no encumbrance.pdf22 Nov 2021
Proforma of Allotment letterFile: allotment.pdf22 Nov 2021
PAN CardFile: pan cards.pdf8 Mar 2021
OtherFile: ७_१२_1.pdf8 Mar 2021
OtherFile: 1-14.pdf8 Mar 2021
OtherFile: 15-28.pdf8 Mar 2021
OtherFile: 29-42.pdf8 Mar 2021
OtherFile: 43-56.pdf8 Mar 2021
OtherFile: 57-67.pdf8 Mar 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Veer OneP99000031900Vasai East, Palghar1Nov 2021Certificate SignedDec 2027Not due yet
PARASNATH TOWNSHIPP99000013822umroli, Palghar-Oct 2017Certificate SignedDec 2027Registered original: Dec 2021Not due yet
VEER SPLENDORP99000011282Nalasopara east, Palghar-Aug 2017CompletedDec 2022Registered original: Jun 2021Dec 2022
VEER 2S NO 154 185 187 VILLAGE UMROLI DIST PALGHAR3-CompletedDec 2021Dec 2021
VEER - 4P99000015602UMROLI EAST, Palghar-Mar 2018CompletedSep 2020Sep 2020

How this compares with Palghar

38%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 15 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEER 11 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMROLI EAST3,200+ in Palghar

2 kmVEER 11Completed 14Lapsed / revoked 40Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 85 registered projects within 2 km.

Builder: Veer Global Infraconstruction Limited

Veer Global Infraconstruction Limited has 10 registrations on MahaRERA, including VEER 2 and VEER SPLENDOR. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VEER 11 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEER 11?

The registered promoter entity is Veer Global Infraconstruction Limited, a company as per the filing. Its CIN L45309MH2012PLC225939 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEER 11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VEER 11?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEER 11?

The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: MUKESH KUMAR; Chartered Accountant: LUNAWAT & VYAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEER 11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEER 11. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEER 11 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.