Home / Browse projects / Palghar, Maharashtra / VEER 11
VEER 11
By Veer Global Infraconstruction Limited
RG-MH-29588 · RERA P99000034206 · Last updated on MahaRERA portal: 8 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEER 11 is a Residential / Group Housing project by Veer Global Infraconstruction Limited in Palghar, Maharashtra, registered with MahaRERA as P99000034206 on 25 Mar 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 34 of the 89 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.
At a glance
Project
- NameVEER 11
- TypeResidential / Group Housing
- Location
- STATION ROAD
- UMROLI EAST
- Umroli
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000034206
- ReraGenie IDRG-MH-29588
Builder
- NameVeer Global Infraconstruction Limited
- Entity typeCompany
- CINL45309MH2012PLC225939
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorVIJAYBHAI BHANSHALI
- Other registrations9 more →
- Completed4 of 10
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Mar 2022
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
- Buildings3 building records
- Documents filed76 files
Current status
Figures as on 8 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A, TYPE E 1 | NA | 11 | 5 | 26 | 7 | 33 |
| WING B, TYPE D1 | NA | 11 | 5 | 18 | 0 | 18 |
| WING C,TYPE C1 | NA | 11 | 5 | 38 | 0 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 92%.
WING A, TYPE E 176%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 87% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 83% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 78% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 84% |
WING B, TYPE D176%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 78% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 83% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 87% |
WING C,TYPE C177%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 83% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 83% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 84% |
Progress on shared amenities15
As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 70% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 65% |
| Aggregate area of recreational Open Space | Yes | 60% |
| Open Parking | Yes | 65% |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A, TYPE E 1 | 6 | 5 | 11 |
| WING B, TYPE D1 | 6 | 6 | 12 |
| WING C,TYPE C1 | 6 | 6 | 12 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHREENATH ENTERPRISES | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A, TYPE E 1 | NA | Rs 2.04 cr | Rs 1.98 cr |
| WING B, TYPE D1 | NA | Rs 2.04 cr | Rs 1.98 cr |
| WING C,TYPE C1 | NA | Rs 2.04 cr | Rs 1.96 cr |
| - | NA | Rs 52.60 lakh | Rs 34.19 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA & ASSOCIATES |
| Engineer | MUKESH KUMAR |
| Chartered Accountant | LUNAWAT & VYAS |
| Partner | Role in project |
|---|---|
| Veer Global Infraconstruction Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir/Ma’am, We, Veer Global Infraconstruction Limited, hereby declare the following with respect to the project “VEER 11” bearing registration number P99000034206 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the all the buildings. Currently, we are undertaking the Pending finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance work
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 8 Sep 2026 |
| Withdrawal Update Form 1File: fORM 1 V11.pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: F-II VEER 11 JAN MAR 2026-1.pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Veer 11Final Form 3.pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 26.pdf | 8 Sep 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Veer 11Final Form 3.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Veer 11Final Form 3.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: F-II VEER 11APR JUN 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Veer 11Final Form 3.pdf | 18 Jul 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A MARCH 2024.pdf | 12 Apr 2026 |
| Form 2A (FY 2021-2022)File: FORM 2A MARCH 2022.pdf | 12 Apr 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A MARCH 2023.pdf | 12 Apr 2026 |
| Form 5 (FY 2021-2022)File: FORM 5 MARCH 22.pdf | 12 Apr 2026 |
| Form 5 (FY 2022-2023)File: fORM 5 MARCH 23.pdf | 12 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 MARCH 2024.pdf | 12 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf | 11 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026 Final.pdf | 11 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026 Final.pdf | 11 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (1).pdf | 12 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - v11 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 V11.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: vEER 11 Form 2 q3 25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 VEER 11 q325.pdf | 21 Jan 2026 |
| Form 1File: Form 2 Q2 25 Veer 11.pdf | 20 Oct 2025 |
| Form 2File: Form 2 Q2 25 Veer 11.pdf | 20 Oct 2025 |
| Form 3File: Form 3 Q2 V11.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: veer 11 Sold q2.pdf | 20 Oct 2025 |
| Form 2File: Veer 11 Form 2 June 25.pdf | 19 Jul 2025 |
| Form 3File: Veer 11 Form 3 June 25.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Veer 11 sold unsold June 25.pdf | 19 Jul 2025 |
| Form 1File: Veer 11 sold unsold June 25.pdf | 19 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan form 3 Q4 veer 11.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Veer 11 March 25.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 veer11.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold March 25.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 V11.pdf | 24 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 V11.pdf | 24 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Veer 11 Form 1.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023-24.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold veer 11.pdf | 22 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan form 5 0034206.pdf | 29 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200260986835_.pdf | 22 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan Form 5 FY 21-22 No P99000034206.pdf | 14 Feb 2023 |
| Declaration in FORM BFile: Form B Veer.pdf | 19 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 V11.pdf | 19 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 19 Mar 2022 |
| Building plan approvalFile: na 1.pdf | 18 Feb 2022 |
| Layout approvalFile: a -1.pdf | 18 Feb 2022 |
| Layout approvalFile: b -1.pdf | 18 Feb 2022 |
| Layout approvalFile: c- 1.pdf | 18 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: a -1.pdf | 18 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: b -1.pdf | 18 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: c- 1.pdf | 18 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: na 1.pdf | 18 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: na 1.pdf | 18 Feb 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCENT CERTIFICATE 1.pdf | 18 Feb 2022 |
| Proforma of Allotment letterFile: Draft-VEER-11-RERA.pdf | 18 Feb 2022 |
| Copy of the legal title reportFile: rera title.pdf | 27 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228889895_For_Debtor_Based_Search_27_01_2022_17_39_02_236.pdf | 27 Jan 2022 |
| Details of encumbrancesFile: no encumbrance.pdf | 22 Nov 2021 |
| Proforma of Allotment letterFile: allotment.pdf | 22 Nov 2021 |
| PAN CardFile: pan cards.pdf | 8 Mar 2021 |
| OtherFile: ७_१२_1.pdf | 8 Mar 2021 |
| OtherFile: 1-14.pdf | 8 Mar 2021 |
| OtherFile: 15-28.pdf | 8 Mar 2021 |
| OtherFile: 29-42.pdf | 8 Mar 2021 |
| OtherFile: 43-56.pdf | 8 Mar 2021 |
| OtherFile: 57-67.pdf | 8 Mar 2021 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Veer OneP99000031900 | Vasai East, Palghar | 1 | Nov 2021 | Certificate Signed | Dec 2027 | Not due yet |
| PARASNATH TOWNSHIPP99000013822 | umroli, Palghar | - | Oct 2017 | Certificate Signed | Dec 2027Registered original: Dec 2021 | Not due yet |
| VEER SPLENDORP99000011282 | Nalasopara east, Palghar | - | Aug 2017 | Completed | Dec 2022Registered original: Jun 2021 | Dec 2022 |
| VEER 2 | S NO 154 185 187 VILLAGE UMROLI DIST PALGHAR | 3 | - | Completed | Dec 2021 | Dec 2021 |
| VEER - 4P99000015602 | UMROLI EAST, Palghar | - | Mar 2018 | Completed | Sep 2020 | Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VEER 11 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UMROLI EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 85 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: Veer Global Infraconstruction Limited
Veer Global Infraconstruction Limited has 10 registrations on MahaRERA, including VEER 2 and VEER SPLENDOR. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if VEER 11 is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEER 11?
The registered promoter entity is Veer Global Infraconstruction Limited, a company as per the filing. Its CIN L45309MH2012PLC225939 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEER 11?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VEER 11?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEER 11?
The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: MUKESH KUMAR; Chartered Accountant: LUNAWAT & VYAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEER 11?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback