ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Arkade Pearl 4

Registered Litigation declared Residential / Group Housing project

Arkade Pearl 4

By Arkade Developers Ltd

RG-MH-31587 · RERA P51800079922 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 15 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 33%
11 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Arkade Pearl 4 is a Residential / Group Housing project by Arkade Developers Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079922 on 1 Apr 2025. Possession is promised by 30 Jun 2027. 5 of the 16 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameArkade Pearl 4
  • TypeResidential / Group Housing
  • Location
    • 18.30 m Wide Shahaji Raje Road
    • Vile Parle (East)
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079922
  • ReraGenie IDRG-MH-31587

Builder

  • NameArkade Developers Ltd
  • Entity typeCompany
  • Other registrations1 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredApr 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Apr 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

31%5 of 16 units booked
27.1%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing FNA10816016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 33%.

Wing F: 22% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,153 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025
LandownerVillageDistrict
Prachi Co-Operative Housing Society LimitedVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1598.4
Proposed, not sanctioned1,598 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 54 And 55, Scm Sports Club, Saraf Chaudhary Nagar, Next To ICICI Direct, Thakur Complex, Kandivali E, Mumbai.400101
Estimated costRs 8.03 cr
Cost incurredRs 2.18 cr
Work done27.12%
BuildingWingEstimatedIncurred
Wing FNARs 6.74 crRs 1.46 cr
-NARs 1.29 crRs 71.49 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA R Design Studio
ArchitectKalakruti Architects & Planners
EngineerJignesh Mohan Patel
EngineerGokani Consultants & Engineers LLP
Chartered AccountantAmit T Jain & Co.
Chartered AccountantMittal & Associates
PartnerRole in project
Arkade Developers Ltd-

Litigation declared2

CaseCourtStatus
2079/2023The court of City Civil at DindoshiOngoing
118/2023Additional Commissioner Konkan Division MumbaiOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2 Engineers Certificate_Arkade Pearl.pdf21 May 2026
Withdrawal Update Form 1File: FORM-1-Pearl 4 Mar 26.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 Pearl 4 Mar 26.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 Arkade Pearl 4 mar 26.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 Pearl 4 Dec 25.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 Pearl 4 Dec 25.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 Pearl 4 Dec 25_compressed.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1 Pearl 4 Sep 25.pdf29 Oct 2025
Withdrawal Update Form 2File: Arkade Pearl 4 Sept 25.pdf29 Oct 2025
Withdrawal Update Form 3File: Arkade Pearl 4 -Form 3 Sep 2025_11zon.pdf29 Oct 2025
Layout approvalFile: Amended Approved Certificate (1).pdf23 Sep 2025
Building plan approvalFile: Approved Drawing (1)-1.pdf23 Sep 2025
Building plan approvalFile: Approved Drawing (1)-2.pdf23 Sep 2025
Building plan approvalFile: Approved Drawing (1)-3.pdf23 Sep 2025
Building plan approvalFile: Approved Drawing (1)-4.pdf23 Sep 2025
Withdrawal Update Form 1File: Form 1 Pearl F June 2025.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2 - Pearl 4 - June 2025 DSC..pdf6 Aug 2025
Withdrawal Update Form 3File: Arkade Pearl 4 - Final.pdf6 Aug 2025
Copy of the legal title reportFile: Corrigendum letter.pdf26 Mar 2025
Copy of the legal title reportFile: Title Report New_11zon.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf22 Mar 2025
Other - LegalFile: GetUserDocumentFileContent.pdf22 Mar 2025
Other - LegalFile: Letter prachi 16417.pdf22 Mar 2025
Other - LegalFile: Declaratiion from society.pdf22 Mar 2025
Other - LegalFile: Declaratiion from society.pdf22 Mar 2025
Other - FinanceFile: GetUserDocumentFileContent.pdf22 Mar 2025
Other - FinanceFile: Declaratiion from society.pdf22 Mar 2025
Other - TechnicalFile: Drawing-1.pdf22 Mar 2025
Other - TechnicalFile: Letter prachi 16417.pdf22 Mar 2025
Other - TechnicalFile: Declaratiion from society.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Arkade Pearl_Wing F-2025-03-06 DSC.pdf8 Mar 2025
Layout approvalFile: Copy of Layout Approval.pdf7 Mar 2025
Building plan approvalFile: Drawing-1.pdf7 Mar 2025
Building plan approvalFile: Drawing-2.pdf7 Mar 2025
Building plan approvalFile: Drawing-3.pdf7 Mar 2025
Building plan approvalFile: Page 4.pdf7 Mar 2025
PAN CardFile: ADL Pan Card.pdf7 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER - FINANCIAL - ARKADE PEARL-4-05032025.pdf7 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER - LITIGATION - ARKADE PEARL-4-05032025.pdf7 Mar 2025
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf7 Mar 2025
Proforma of Allotment letterFile: Allotment letter.pdf7 Mar 2025
Declaration in FORM BFile: Form B Promoter.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pearl 4.pdf7 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-1.pdf7 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Page 4.pdf7 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-3.pdf7 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-2.pdf7 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf7 Mar 2025
CERSAI detailsFile: Cersai Declaration.pdf7 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf7 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation for allotment letter.pdf7 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - FINANCIAL - ARKADE PEARL-4-05032025.pdf7 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - LITIGATION - ARKADE PEARL-4-05032025.pdf7 Mar 2025
Other - TechnicalFile: Land Cost Declaration.pdf7 Mar 2025
Other - TechnicalFile: Corrigendum Letter.pdf7 Mar 2025
Other - TechnicalFile: Annexure A.pdf7 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation letter for AFS_11zon.pdf7 Mar 2025
Proforma of Agreement for saleFile: AFS.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Arpit Jain.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Amit M Jain.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Neha Huddar Disclosure.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek Dev.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sumesh Mishra.pdf7 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sandeep Jain.pdf7 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf7 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured and unsecured finance declaration.pdf7 Mar 2025

Promoter's earlier projects15

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

15 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Arkade PrimeP51800047081Andheri East, Mumbai Suburban-Sep 2022CompletedDec 2025Jan 2025
Arkade AspireCTS No.466 And 465, 465-1 to6, I B Patel Road, Goregaon East, Borivali, Borivali, Mumbai Suburban, 400063, MAHARASHTRA--CompletedDec 2025Jul 2024
Arkade AspireP51800034603Goregaon East, Mumbai Suburban-Apr 2022CompletedDec 2025Jul 2024
ARKADE CROWNP51800045342Eksar, Mumbai Suburban-May 2022CompletedDec 2025Jun 2024
ARKADE AURAP51800047460Santacruz West, Mumbai Suburban-Nov 2022CompletedDec 2025Dec 2024
Arkade SereneP51800029961Sunder Nagar Malad West, Mumbai Suburban-Jul 2021CompletedJun 2024Feb 2023
ARKADE EARTH-CARNATIONP51800014422Kanjurmarg East, Mumbai Suburban-Nov 2017CompletedDec 2023Apr 2021
ARKADE EARTH-ASPENP51800006579Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2023Apr 2021
ARKADE EARTH- BLUEBELLP51800011586Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2023Apr 2021
DarshanDarshan Vile Parle East Mumbai 5710-CompletedJun 2023Nov 2022
ARKADE EARTH-DAFFODILP51800004440Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - HAZELP51800022666KANJURMARG EAST, Mumbai Suburban-Oct 2019CompletedDec 2022Apr 2022
ARKADE EARTH - GARDENIAP51800010074Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - FERNP51800004750Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - EBONYP51800008953Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020

How this compares with Mumbai Suburban

31%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arkade Pearl 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle (East)6,700+ in Mumbai Suburban

2 kmArkade Pearl 4Completed 151Lapsed / revoked 76Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: Arkade Developers Ltd

Arkade Developers Ltd has 2 registrations on MahaRERA, including Arkade Pearl 4 and Arkade Evoke. Its filings disclose 16 earlier MahaRERA projects: declares 16 of 16 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Arkade Pearl 4 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arkade Pearl 4?

The registered promoter entity is Arkade Developers Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arkade Pearl 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arkade Pearl 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arkade Pearl 4?

The professionals named in the filing: Architect: A R Design Studio; Architect: Kalakruti Architects & Planners; Engineer: Jignesh Mohan Patel; Engineer: Gokani Consultants & Engineers LLP; Chartered Accountant: Amit T Jain & Co.; Chartered Accountant: Mittal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arkade Pearl 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arkade Pearl 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arkade Pearl 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.