Romell Espalier

By ROMELL REAL ESTATE PRIVATE LIMITED

RG-MH-23769 · RERA P51800079081 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 12 months from the original
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
133 of 133Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Romell Espalier is a Residential / Group Housing project by ROMELL REAL ESTATE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079081 on 3 Feb 2025. Possession is promised by 31 Dec 2030. The completion date has moved by 12 months from the original filing. 0 of the 133 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameRomell Espalier
  • TypeResidential / Group Housing
  • Location
    • Azad Road
    • Vile Parle East
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079081
  • ReraGenie IDRG-MH-23769

Builder

  • NameROMELL REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDominic Savio Romell, Jude Boniface Romell
  • Other registrations14 more →
  • Completed13 of 15
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2025First promiseDec 2029Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2025
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2029)
  • Buildings4 building records
  • Documents filed108 files

Current status

0%0 of 133 units booked

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ENA171324024
Wing DNA161351051
Wing BNA151239039
Wing ANA151219019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Wing E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed143

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots143
Closed/Covered143
BuildingClosed/CoveredTotal
Wing E2626
Wing D5656
Wing B4242
Wing A1919

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,303 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI17800.0
Proposed, not sanctioned11,826 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Unit 001, 349 Business Point, Off. W. E. Highway, Near Sai Service, Andheri East, Mumbai, Maharashtra.400069

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGirish Chaudhari
EngineerMayuresh Bapat
EngineerYogesh Khamkar
Chartered AccountantAjay Shobha & Co.
Chartered AccountantP Raj & Co.
Chartered AccountantM. R. Sharma & Co.
PartnerRole in project
ROMELL REAL ESTATE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27112518447Dec 2029 → Dec 2030

Reason as filed by the promoterPrevailing site conditions and the pace of development, the project is still at the excavation stage. Further our project team have anticipated that project is likely to be finished by December,2030. Also promoter has not yet started sale of flat for said project and not sold single unit till date. It has become evident that the construction cannot be completed within the presently approved timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Espalier Form 1 June 2026.pdf29 Jul 2026
Withdrawal Update Form 2File: Espalier Form 2 June 2026.pdf29 Jul 2026
Withdrawal Update Form 3File: Espalier Form 3 June 2026.pdf29 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_Espalier _ FY 25-26.pdf8 Jul 2026
Layout approvalFile: 1.pdf16 Jun 2026
Layout approvalFile: 2.pdf16 Jun 2026
Layout approvalFile: 3.pdf16 Jun 2026
Layout approvalFile: 4.pdf16 Jun 2026
Layout approvalFile: 5.pdf16 Jun 2026
Layout approvalFile: 6.pdf16 Jun 2026
Layout approvalFile: 7.pdf16 Jun 2026
Layout approvalFile: 8.pdf16 Jun 2026
Layout approvalFile: 9.pdf16 Jun 2026
Layout approvalFile: 10.pdf16 Jun 2026
Layout approvalFile: 11.pdf16 Jun 2026
Layout approvalFile: 12.pdf16 Jun 2026
Layout approvalFile: 13.pdf16 Jun 2026
Layout approvalFile: 14.pdf16 Jun 2026
Layout approvalFile: 15.pdf16 Jun 2026
Layout approvalFile: 16.pdf16 Jun 2026
Layout approvalFile: 17.pdf16 Jun 2026
Layout approvalFile: 18.pdf16 Jun 2026
Layout approvalFile: 19.pdf16 Jun 2026
Layout approvalFile: 20.pdf16 Jun 2026
Layout approvalFile: 21.pdf16 Jun 2026
Layout approvalFile: 22.pdf16 Jun 2026
Layout approvalFile: 23.pdf16 Jun 2026
Layout approvalFile: 24.pdf16 Jun 2026
Layout approvalFile: 25.pdf16 Jun 2026
Building plan approvalFile: Amended Layout letter.pdf16 Jun 2026
Commencement certificateFile: Reendorsed CC.pdf16 Jun 2026
Withdrawal Update Form 1File: Espalier Form 1 March 2026.pdf16 Jun 2026
Withdrawal Update Form 2File: Espalier Form 2 March 2026.pdf16 Jun 2026
Withdrawal Update Form 3File: Espalier Form 3 March 2026.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 2025 Signed.pdf23 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 2025 Signed.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 Signed.pdf23 Feb 2026
Withdrawal Update Form 1File: Form 1 Espalier 30092025.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2 Espalier 30092025.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 Espalier 30092025.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: RREPL Form 5 - Espalier FY 24-25.pdf21 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Espalier_Yogesh Khamkar_Signed.pdf21 Jun 2025
Form 1File: 2-Form-1 Architect Certificate Romell Espalier.pdf10 Jun 2025
Form 2File: 1-Form 2 Engineer's Certificate - Romell Espalier.pdf10 Jun 2025
Form 3File: Form 3 CA Certificate_Espalier.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3-Disclosure of Sold and Unsold inventory Romell Espalier.pdf10 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2-Form-1 Architect Certificate Romell Espalier.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Espalier.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-Form 2 Engineer's Certificate - Romell Espalier.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-Form 2 Engineer's Certificate - Romell Espalier.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: 3-Disclosure of Sold and Unsold inventory Romell Espalier.pdf14 Apr 2025
Building plan approvalFile: 1-IOA -Plan (1-2).pdf29 Jan 2025
Building plan approvalFile: 1-IOA -Plan (1-2).pdf29 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-IOA -Plan (1-2).pdf29 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-IOA -Plan (1-2).pdf29 Jan 2025
Copy of the legal title reportFile: Espalier Title.pdf17 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report to AFS.pdf17 Jan 2025
Proforma of Agreement for saleFile: Proformaq of Agreement of Sale.pdf17 Jan 2025
Proforma of Allotment letterFile: Allotment Letter Romell ESPALIER.pdf16 Jan 2025
Other - LegalFile: 45-All Index II.pdf16 Jan 2025
Other - LegalFile: 21-Disclosure of Interest in Other Real Estate Organizations_JR.pdf16 Jan 2025
Other - TechnicalFile: Declaration of Projec Plot Area and Annexure_Other Tech.pdf16 Jan 2025
Building plan approvalFile: 6-SRA_Approval Letter.pdf14 Jan 2025
Building plan approvalFile: 13-IOA -Plan (25-26).pdf14 Jan 2025
Building plan approvalFile: 12-IOA -Plan (23-24).pdf14 Jan 2025
Building plan approvalFile: 11-IOA -Plan (21-22).pdf14 Jan 2025
Building plan approvalFile: 10-IOA -Plan (19-20).pdf14 Jan 2025
Building plan approvalFile: 9-IOA -Plan (17-18).pdf14 Jan 2025
Building plan approvalFile: 8-IOA -Plan (15-16).pdf14 Jan 2025
Building plan approvalFile: 7-IOA -Plan (13-14).pdf14 Jan 2025
Building plan approvalFile: 6-IOA -Plan (11-12).pdf14 Jan 2025
Building plan approvalFile: 5-IOA -Plan (9-10).pdf14 Jan 2025
Building plan approvalFile: 4-IOA -Plan (7-8).pdf14 Jan 2025
Building plan approvalFile: 3-IOA -Plan (5-6).pdf14 Jan 2025
Building plan approvalFile: 2-IOA -Plan (3-4).pdf14 Jan 2025
Building plan approvalFile: APPROVED LAYOUT PLAN WITH COLOR CODE AND WING WISE AREA.pdf14 Jan 2025
Layout approvalFile: 5-Layout Proforma A.pdf14 Jan 2025
PAN CardFile: 1-RRE_PAN Card.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: 3 and 4 Details of encumbrances concerned to Finance and Legal.pdf14 Jan 2025
Copy of Layout Approval (in case of layout)File: 5-Layout Proforma A.pdf14 Jan 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ROMELL DIVA PHASE II - 17TH TO 20TH FLOORSOMWARI BAZAR MALAD EAST28CompletedDec 2024Apr 2019
ROMELL EMPRESS C WING PHASE I - UPTO 13TH FLOOREKSAR VILLAGE BORIVALI WEST MUMBAI 40010338CompletedDec 2022May 2019
ROMELL EMPRESS C WING PHASE II - 14TH TO 17TH FLOOREKSAR VILLAGE I C COLONY BORIVALI EAST11CompletedJun 2022Mar 2020
ROMELL DIVA PHASE I - UPTO 16TH FLOORROMELL DIVA VILLAGE MALAD SOMVAR BAZAR MALAD WEST MUMBAI106CompletedJun 2015Late, Apr 2017
Romell Umiya Grandeur Phase I - Upto 19th FloorROMELL UMIYA GRANDEUR VILLAGE PAHAI VISHWESHWAR ROAD GOREGAON E MUMBAI 400063118CompletedDec 2014Late, Oct 2016

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Romell Espalier on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle East6,700+ in Mumbai Suburban

2 kmRomell EspalierCompleted 158Lapsed / revoked 73Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 382 registered projects within 2 km.

Builder: ROMELL REAL ESTATE PRIVATE LIMITED

ROMELL REAL ESTATE PRIVATE LIMITED has 15 registrations on MahaRERA, including TRIMURTI CHSL PHASE I - UPTO 15TH FLOOR and TRIMURTI CHSL PHASE II - 16TH TO 18TH FLOOR. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Romell Espalier is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Romell Espalier?

The registered promoter entity is ROMELL REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Romell Espalier?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Romell Espalier?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Romell Espalier?

The professionals named in the filing: Architect: Girish Chaudhari; Engineer: Mayuresh Bapat; Engineer: Yogesh Khamkar; Chartered Accountant: Ajay Shobha & Co.; Chartered Accountant: P Raj & Co.; Chartered Accountant: M. R. Sharma & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Romell Espalier?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Romell Espalier. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Romell Espalier to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.